Greenhouse Assembly Guide
Please read all instructions carefully before assembly. Familiarize yourself with the parts and double-check the appropriate parts for each step.
Contact Information
Please have the following information ready when contacting customer support for prompt assistance:
- Order number or PO number (found on your invoice, receipt, or platform account).
- Model number of the product (printed on the package box).
- Description of the part from the parts list.
Recommendations for Increasing Wind Rating
Especially in areas with strong winds, rain, and snow, consider these recommendations to enhance the wind resistance of your greenhouse (items not included):
- Bolt the greenhouse securely to the ground using a concrete slab, base plates, or flanged feet.
- Utilize extra tie-down kits.
- Apply silicone sealant to seal the panels.
- Fix wood planks or boards with screws on the roof and sidewalls to further improve wind resistance.
Parts Checklist
Verify all parts are present before beginning assembly.
Main Components:
- 1 x2
- 2 x2
- 3 x2
- 4 x1
- 5A x2
- 5B x2
- 6 x2
- 7 x2
- 7-1 x2
- 8 x2
- 9 x2
- 12 x1
- 13 x1
- 14 x1
- 15 x1
- 16 x8
- 17 x6
- 18A x1
- 18B x1
- 19 x4
- 21 x1
- 22 x1
- 23 x2
- 23-1 x1
- 24 x1
- 25 x1
- 26 x1
- 27 x2
- 28 x1
- 30-1 x1
- 30-2 x2
- 30-3 x1
- 31 x1
- 31A x1
- 32 x4
- 33A x2
- 33B x2
- 34 x2
- 37 x4
- 42 x100
- 44 x10
- 45 x10
- 46 x12
- 47 x6
- 48 x8
- F1 x6
- x1 x36
Additional Components:
- A x10
- B x9
- D x1
- E x4
- F x1
- G x4
- I x1
- J x1
- K x2
- L x1
Note: The protective film on both sides of the PC boards must be removed before assembly.
Assembly Steps
Step 1: Base Frame Assembly
Assemble the base frame using parts 2-1 and 8.
Step 2: Pre-Assembled Base Frame Installation
Install the pre-assembled base frame using part 2.
Step 3: Back Wall Assembly
- Step 3-1 & 3-2: Assemble the back wall frame using part 3.
- Step 3-3: Assemble the back wall using part 19.
- Step 3-4 & 3-5: Assemble the back wall frame using parts 19 and G.
- Step 3-6 & 3-7: Assemble the back wall's plastic parts and gable frame using parts 8, 9, 15, and 3.
Step 4: Front Wall Assembly
- Step 4-1 & 4-2: Assemble the front wall frame.
- Step 4-3 & 4-4: Assemble the front wall.
- Step 4-5: Assemble the front wall using part E.
- Step 4-6 & 4-7: Assemble the front wall's plastic parts and gable frame using parts E, 9, 13, H, 12, and 3.
Step 5: Side Roof Ridge Assembly
- Step 5-1: Assemble the side roof ridge using parts 7-1, 44, 8, 42, and 7.
- Step 5-2: Install the pre-assembled side roof ridge using parts 7, 6, and 3.
Step 6: Middle Roof Ridge and Window Assembly
- Step 6-1: Assemble the middle roof ridge using parts 23-1, 42, and 4.
- Step 6-2: Assemble the window components using parts 30-1, 30-2, 2, 30-3, 48, and 4. Note: Drill 4 holes in part L with a suitable drill.
- Step 6-3: Install the pre-assembled middle roof ridge and assemble the window. Note: Windows must be slid into the gutter of Frame 23 before assembling Frame 23.
Step 7: Side Wall Assembly
- Step 7-1: Assemble the side wall.
- Step 7-2: Assemble the side wall frame. Note: Do not fully tighten screws during PC board installation; tighten them completely after the PC board is installed.
- Step 7-3: Assemble the side wall.
Step 8: Roof Wall Assembly
- Step 8-1: Assemble the roof wall.
- Step 8-2: Assemble the roof wall frame using parts 17, 18B, 18A, and 4. Note: Do not fully tighten screws during PC board installation; tighten them completely after the PC board is installed.
- Step 8-3: Assemble the roof wall, including the window, using parts F1, J.
Step 9: Door Assembly
Assemble the door using parts 2, 8, 4, 31, 31A, and 47.
Step 10: Door Assembly
Note: The door handles (31 and 31A) should be secured with self-tapping screws (47) without requiring drilling.