WORKPRO OWNER'S MANUAL & SAFETY INSTRUCTIONS
Multi Purpose Workbench With Work Light
FCC Compliance Information
This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
- Reorient or relocate the receiving antenna.
- Increase the separation between the equipment and receiver.
- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
- Consult the dealer or an experienced radio/TV technician for help.
Safety Instructions
WARNING:
Please read these instructions carefully and retain them for future use.
Replace light fixture only with same light fixture size and rating.
Assembly Instructions
Required Tools
The following tool is required for installation:
- Screwdriver (implied)
- Wrench (implied)
Parts List (Hardware)
Item | Quantity |
---|---|
Hardware Pack A | 4 |
Hardware Pack B | 78 |
Hardware Pack C | 12 |
Hardware Pack D | 18 |
Hardware Pack E | 2 |
Hardware Pack G | 2 |
Hardware Pack H (Clips) | 2 |
Assembly Steps
- Step 1: Attach 1 Side Beam (#4) to the bottom 2 holes of 1 Front Beam (#1) and 1 Back Beam (#2). Repeat with the other Side Beam, Front Beam, and Back Beam. (Refer to Figure A).Note: Back posts are taller than Front posts.
- Step 2: Attach the Protective Caps (#3) at the bottom of all 4 Beams. (Refer to Figure A).
- Step 3: Attach the Bottom Beams (#5) to join both the Front Beams (#1) and both Back Beams (#2), connecting together the bottom of the workbench. (Refer to Figure B).
- Step 4: Working from the front side of the workbench, attach the Side Beam (#4) and the Side Beam with Power Strip Opening (#4A) to the top 2 holes on the Front Posts (#1) and the middle 2 holes on the Back Posts (#2). (Refer to Figure C).Note: The side Beam with Power Strip Opening can be attached to either the right or left side.
- Step 5: Attach the Power Strip (#22) to the Side Beam with Power Strip Opening (#4A) using U Brackets (F) and Screws (E) from package E-F. (Refer to Figure C).
- Step 6: Attach the Top Beams (#6) to the top 2 holes on both Front Posts (#1) and the middle 2 holes on both Back Posts (#2). (Refer to Figure D).Note: Make sure the Front Top Beam (#6) carries the Warning Label and is right-side-up.
- Step 7: To begin assembling the Drawer Housing, attach the Front Drawer Bracket (#7F) to the Front Top Beam (#6). Next, attach the Back Drawer Bracket (#7B) to the Back Top Beam (#6). (Refer to Figure E).
- Step 8: Attach the Middle Drawer Mount (#8) to the Front Drawer Bracket (#7F) and the Back Drawer Bracket (#7B).Note: The side with the open end of the silver runner track should be facing forward, and the end that is closed should be facing the back of the workbench.
- Step 9: Attach the Left Drawer Mount (#9L) to the left Front and Back Beams on the bottom most holes. Then, attach the Right Drawer Mount (#9R) to the right Front and Back Beams on the bottom most holes. (Refer to Figure F).Note: Again, the runner tracks with the open end should be facing forward, and the end that is closed should be facing the back of the workbench.
- Step 10: Attach the left and right Back Upper Posts (#15) to the left and right Back Posts (#2) on the top most 2 holes.Note: You will have to temporarily remove these screws to attach the pegboard in the future, so do not overtighten.
- Step 11: Attach the Back Shelf Beam (#16B) to the top of the Back Upper Posts (#15).Note: Install Shelf Beams with the lip facing upward. This will be used to attach the Top Shelf in future steps.
- Step 12: Attach the Left Shelf Beam (#17L) and the Right Shelf Beam (#17R) to the Back Shelf Beam (#16B) to begin forming the top shelf.Note: Install Shelf Beams with the lip facing upward. This will be used to attach the Top Shelf in future steps.
- Step 13: Attach the Front Shelf Beam (#16F) to the Left and Right Shelf Beams (#17L + #17R). (Refer to Figure H).Note: Install Shelf Beams with the lip facing upward. This will be used to attach the Top Shelf in future steps.
- Step 14: Attach the Front Drawer Panel (#11) to the Right (#10R) and Left (#10L) Drawer Panels. Slip the Drawer Bottom onto the Drawer Panel lips, and attach the Back Drawer Panel (#12) to secure Drawer Bottom into place. Repeat for Second Drawer. Attach Drawer Handles to Front Drawer Pannel (#11). (Refer to Figure G).
- Step 15: Slide the Drawers into the Drawer Bracket Runners and push firmly until the drawers go all the way to the back of the track.Note: Drawers have a light locking device; push firmly to make drawers flush.
- Step 16: Attach the Pegboard (#18) to the Back Upper Posts (#15) and Middle Drawer Mount using Bolts, and Nuts from package C. (Refer to Figure I).Note: You will have to temporarily remove the screws, one side at a time, to be able to secure the Pegboard to the bottom corners of the Back Upper Posts (from Step 10).Note: Now you will want to go through and tighten all Screws and Bolts securely, as it is more difficult to do after surfaces have been installed.
- Step 17: Attach the Bench Top (#19) to the Side Beams (#4 + #4A). Then attach the Bottom Shelf (#20) to the lower Side Beams (#4). Use the Bolts, Nuts from package D. (Refer to Figure J).
- Step 18: Attach the Top Shelf (#21) to the Shelf Beams (#17L + #17R) using the Bolts, Nuts from package D. (Refer to Figure K).
- Step 19: Attach the Light Fixture (#23) to the underside of the Top Shelf (#21) using the Screw and clip (H) from package G. (Refer to Figure L).
- a. Insert a screw at the center of each Light Fixture Clip.
- b. Position the screws at the center of the designated holes on the underside of the Top Shelf, and screw them into the Shelf until the Clips are secure.
- c. Push the Light Fixture all the way into the clips to securely attach to the Top Shelf.
- Step 20: Route the Light Fixture cord through one of the holes at the top side of the Pegboard and plug in the Light Fixture power cord to the Power Strip on the side of the Workbench. Secure the power cord to the Back Post with the zipties provided.Note: Go through one more time and ensure all Screws and Bolts are securely tightened on the Workbench.
Pegboard Information
The pegboard is designed for hooks with a wire diameter less than 3.7mm (9/64).
Light Fixture Replacement
Replace light fixture only with same light fixture size and rating.
- Pull the light fixture from light fixture clips.
- Push the Light Fixture all the way into the clips to securely attach to the Top Shelf.
Questions, Problems, Missing Parts?
Before returning to the store, call GreatStar Customer Service.
Hours: 9AM-4PM CST, M-F
Call: 479-802-3580
Email: Help@greatstar-us.com