WORKPRO Multi-Purpose Workbench with Work Light
Owner's Manual & Safety Instructions
FCC Compliance Information
This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
- Reorient or relocate the receiving antenna.
- Increase the separation between the equipment and receiver.
- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
- Consult the dealer or an experienced radio/TV technician for help.
Safety Precautions
⚠️ WARNING
General safety warnings and precautions are provided throughout this manual. Please read and understand all safety information before assembly and use.
Note: Back posts are taller than Front posts.
Note: The side Beam with Power Strip Opening can be attached to either right or left side.
Note: Make sure the Front Top Beam (#6) carries the Warning Label and is rightside-up.
Note: The side with the open end of the silver runner track should be facing forward, and the end that is closed should be facing the back of the workbench.
Note: Again, the runner tracks with the open end should be facing forward, and the end that is closed should be facing the back of the workbench.
Note: You will have to temporarily remove these screws to attach the pegboard in the future, so do not overtighten.
Note: Install Shelf Beams with the lip facing upward. This will be used to attach the Top Shelf in future steps.
Note: You will have to temporarily remove the screws, one side at a time, to be able to secure the Pegboard to the bottom corners of the Back Upper Posts (from Step 13).
Note: Now you will want to go through and tighten all Screws and Bolts securely, it is more difficult to do after surfaces have been installed.
Note: Go through one more time and ensure all Screws and Bolts are securely tightened on the Workbench.
Note: Drawers have light locking device, push firmly to make drawers flush.
Note: The peg board is designed for hooks with a wire diameter less than 3.7mm (9/64").
Note: Replace light fixture only with same light fixture size and rating.
Tools Required for Installation
- Screwdriver (not specified, assumed Phillips head)
- Wrench (not specified, assumed for bolts/nuts)
Parts and Hardware are typically supplied in packages labeled A, B, C, D, E-F, G.
Example quantities mentioned:
- Package A: 8 screws
- Package B: 78 screws
- Package C: 12 bolts and nuts
- Package D: 18 bolts and nuts
- Package E-F: U Brackets (F) and Screws (E)
- Package G: Screw and clip (H)
Assembly Instructions
-
Step 1: Attach 1 Side Beam (#4) to the bottom 2 holes of 1 Front Beam (#1) and 1 Back Beam (#2). Repeat with the other Side Beam, Front Beam, and Back Beam. (See Figure A)
Figure A Description: Illustrates the initial assembly of the workbench frame, showing side beams connecting to front and back beams, and the placement of protective caps at the base.
- Step 2: Attach the Protective Caps (#3) at the bottom of all 4 Beams. (See Figure A)
-
Step 3: Attach the Bottom Beams (#5) to join both the Front Beams (#1) and both Back Beams (#2), connecting together the bottom of the workbench. (See Figure B)
Figure B Description: Depicts the attachment of bottom beams that connect the front and back beams, forming the lower structure of the workbench.
-
Step 4: Working from the front side of the workbench, attach the Side Beam (#4) and the Side Beam with Power Strip Opening (#4A) to the top 2 holes on the Front Posts (#1) and the middle 2 holes on the Back Posts (#2). (See Figure C)
Figure C Description: Shows how the side beams, including one with a power strip opening, are attached to the front and back posts. It also illustrates the installation of the power strip using U brackets and screws.
- Step 5: Attach Power Strip (#22) to the Side Beam with Power Strip Opening (#4A) using U Brackets (F) and Screws (E) from package E-F. (See Figure C)
-
Step 6: Attach the Top Beams (#6) to the top 2 holes on both Front Posts (#1) and the middle 2 holes on both Back Posts (#2). (See Figure D)
Figure D Description: Illustrates the attachment of the top beams to the front and back posts, noting the correct orientation of the beam with the warning label.
-
Step 7: To begin assembling the Drawer Housing, attach the Front Drawer Bracket (#7F) to the Front Top Beam (#6). Next, attach the Back Drawer Bracket (#7B) to the Back Top Beam (#6). (See Figure E)
Figure E Description: Details the installation of the drawer housing components, specifically the front and back drawer brackets, onto the top beams.
-
Step 8: Attach the Middle Drawer Mount (#8) to the Front Drawer Bracket (#7F) and the Back Drawer Bracket (#7B).
Figure F Description: Shows the mounting of drawer runners (drawer mounts) onto the front and back beams, emphasizing the correct orientation of the runner tracks.
- Step 9: Attach the Left Drawer Mount (#9L) to the left Front and Back Beams on the bottom most holes. Then, attach the Right Drawer Mount (#9R) to the right Front and Back Beams on the bottom most holes. (See Figure F)
-
Step 10: Attach the Front Drawer Panel (#11) to the Right (#10R) and Left (#10L) Drawer Panels. Slip the Drawer Bottom onto the Drawer Panel lips, and attach the Back Drawer Panel (#12) to secure the Drawer Bottom into place. Repeat for the Second Drawer. Attach Drawer Handles to Front Drawer Panel (#11). (See Figure G)
Figure G Description: Describes the assembly of the drawer box, including attaching the front, left, right, and back panels, slipping in the drawer bottom, and attaching drawer handles.
- Step 11: Slide the Drawers into the Drawer Bracket Runners and push firmly until the drawers go all the way to the back of the track.
- Step 12: Attach the left and right Back Upper Posts (#15) to the left and right Back Posts (#2) on the top most 2 holes.
- Step 13: Attach the Back Shelf Beam (#16B) to the top of the Back Upper Posts (#15).
- Step 14: Attach the Left Shelf Beam (#17L) and the Right Shelf Beam (#17R) to the Back Shelf Beam (#16B) to begin forming the top shelf.
-
Step 15: Attach the Front Shelf Beam (#16F) to the Left and Right Shelf Beams (#17L + #17R). (See Figure H)
Figure H Description: Illustrates the assembly of the top shelf structure by connecting shelf beams to the back upper posts and then to each other.
-
Step 16: Attach the Pegboard (#18) to the Back Upper Posts (#15) and Middle Drawer Mount using Bolts and Nuts from package C. (See Figure I)
Figure I Description: Depicts the installation of the pegboard onto the back upper posts and the middle drawer mount, using bolts and nuts.
- Step 17: Tighten all Screws and Bolts securely. It is more difficult to do this after surfaces have been installed.
-
Step 18: Attach the Bench Top (#19) to the Side Beams (#4 + #4A). Then, attach the Bottom Shelf (#20) to the lower Side Beams (#4). Use the Bolts and Nuts from package D. (See Figure J)
Figure J Description: Shows the attachment of the main workbench top and the lower shelf to the assembled frame using bolts and nuts.
-
Step 19: Attach the Top Shelf (#21) to the Shelf Beams (#17L + #17R) using the Bolts and Nuts from package D. (See Figure K)
Figure K Description: Illustrates the installation of the top shelf onto the shelf beams.
-
Step 20: Attach the Light Fixture (#23) to the underside of the Top Shelf (#21) using the Screw and clip (H) from package G.
Figure L Description: Details the process of attaching the work light fixture to the underside of the top shelf using provided clips and screws.
- a. Insert a screw at the center of each Light Fixture Clip.
- b. Position the screws at the center of the designated holes on the underside of the Top Shelf, and screw them into the Shelf until the Clips are secure.
- c. Push the Light Fixture all the way into the clips to securely attach to the Top Shelf.
- Step 21: Route the Light Fixture cord through one of the holes at the top side of the Pegboard and plug in the Light Fixture power cord to the Power Strip on the side of the Workbench. Secure the power cord to the Back Post with the zipties provided.
Product Specifications and Notes
- Model Number: 3302 (inferred from file_title)
- The peg board is designed for hooks with a wire diameter less than 3.7mm (9/64").
- Replace light fixture only with the same light fixture size and rating.