matt E ARD-2-32-TP-R-SPD Connection Unit
Product Usage Instructions
- Installation: Follow the provided installation manual to connect the unit to the three-phase power supply.
- Operation: Ensure all connections are secure and follow safety guidelines when operating the unit.
- Maintenance: Regularly check for any signs of damage or wear and tear. Clean the unit as needed.
Frequently Asked Questions (FAQ):
- Q: What is the warranty period for the product?
A: The product comes with a warranty of 1 year from the date of purchase. - Q: What is the Ingress Protection rating of the enclosure?
A: The enclosure has an IP4X rating, providing protection against solid objects larger than 1mm. - Q: How do I ensure compliance with relevant regulations?
A: Follow the provided guidelines and consult with a qualified electrician to ensure compliance with applicable standards and regulations.
The matt:e ARD connection centres with unique 5 pole auto reset device and built in Type 2 SPD. Simple to install, dedicated EV connection centres with built in O-PEN® technology that allows for the connection of EV charge points to the PME earthing facility without the use of earth electrodes. Helping to facilitate compliance with BS:7671. 2018 Amendment 2, 2022 Regulation 722.411.4.1.(iii).
Product Features and benefits
- Built in O-PEN® technology
- NO EARTH ELECTRODES REQUIRED
- Helps reduce disruptive and costly groundworks
- Removes the risk of striking buried services
- Simple wire in wire out connection
- Complete with Type 2 SPD
- With 2 x built in 32A TPN Type A RCBO
- Mild steel IP4X enclosure
- Standard 1 Year parts warranty.
Specifications
Input Volts | 400V 50Hz |
Max Load | 63amps |
Cable Entry Facility | Top and bottom |
Terminal Capacity | 25mm2 |
Dimensions ( H x W x D ) | 550mm x 360mm x 120mm |
Weight | Approximately 7kG |
Enclosure | Mild Steel Powder Coated |
Ingress Protection | IP4X |
Warranty | 1 Year |
…Simplifying EV connection
- T: 01543 227290
- E: info@matt-e.co.uk
- W: www.matt-e.co.uk
- matt:e Ltd, Unit 1 Langley Brook Business Park, Middleton, Tamworth B78 2BP
Documents / Resources
![]() |
matt E ARD-2-32-TP-R-SPD Connection Unit [pdf] User Guide ARD-2-32-TP-R-SPD, ARD-2-32-TP-R-SPD Connection Unit, ARD-2-32-TP-R-SPD, Connection Unit, Unit |