BITMAIN ANTRACK V1 Hydro Cooling Mining Rack 24kW
Product Usage Instructions
Installation
Follow these steps to install the ANTRACK unit:
- Ensure the input voltage is within the specified range to prevent server damage.
- Connect the three-phase AC input to the designated port.
- Set up the fluid system ensuring the water conductivity meets the requirements.
Operation
To operate the ANTRACK unit:
- Power on the unit and monitor the temperature and humidity levels.
- Maintain the antifreeze concentration at 10% to prevent freezing issues.
- Check the system regularly and replace fluids if necessary.
Maintenance
Regular maintenance is essential for optimal performance:
- Clean the filters and vents to ensure proper airflow.
- Inspect and replace any damaged components promptly.
- Keep the unit free from dust and debris to prevent overheating.
Specification
Product Glance | Value |
Model | ANTRACK |
Version | V1 |
Capacity | 4 units ANTMINER (Hydro) |
Maximum load, kW | 24 |
Detailed Characteristics | Value |
Hardware configuration | |
Size (Length*Width*Height), mm (without package) | 1000*600*2100 |
Size (Length*Width*Height), mm (with package) | 2260*1130*780 |
Net weight, kg (without package) | 195 |
Gross weight, kg (with package) | 290 |
Network connection mode | RJ45 Ethernet 10/100M |
Power supply | |
Power supply AC input voltage, Volt(1-1) | 380~415V AC |
Power supply AC input frequency range, Hz | 50~60 |
Maximum power supply AC input current, Amp(1-2) | 80 |
Fan | |
Rated power, W | 120 |
Noise, dBA@1m | 68 |
Size (Length*Height*Thickness), mm | 280*280*80 |
Pump | |
Rated power, W | 450 |
Noise, dBA@1m | 55 |
Size (Length*Width* Height), mm | 360*210*268 |
Plate heat exchanger | |
Maximum heat exchange power, kW | 30 |
Size (Length*Width* Height), mm | 305*106*64 |
Diameter of water pipe connector, mm | DN25 |
Environment requirements | |
Ambient temperature, °C | 15~45 |
Water flow, L/min | 32.0~40.0 |
Water pressure, bar | ≤3.5 |
Working fluid(1-3) | Antifreeze (10%) |
Liquid PH | 7.8~8.5 |
Storage temperature, °C | -20~70 |
Operation humidity(non-condensing), RH | 10~90% |
Notes
- Caution: Wrong input voltage may cause server damaged.
- Three-phase AC input.
If the water conductivity is ≥100 μs/cm, the fluid must be replaced. The water conductivity is less than 20 μs/cm when the system is running at the first time.
BITMAIN TECHNOLOGIES INC.
www.bitmain.com
FAQ
- Q: What should I do if the water conductivity is above 100 s/cm?
A: If the water conductivity exceeds 100 s/cm, the fluid must be replaced immediately to prevent damage to the system. - Q: Can I use a different input voltage than specified?
A: Using the wrong input voltage may cause server damage, so it is crucial to adhere to the specified voltage range.
Documents / Resources
![]() |
BITMAIN ANTRACK V1 Hydro Cooling Mining Rack 24kW [pdf] Instruction Manual ANTRACK V1 Hydro Cooling Mining Rack 24kW, ANTRACK V1, Hydro Cooling Mining Rack 24kW, Cooling Mining Rack 24kW, Mining Rack 24kW |