VOXORT V455845 Fill Value Instruction Manual
- Please read the following instructions carefully. In order to avoid injuring yourself or damaging equipment, please install the equipment by following the instructions step by step.
- The instructions are complied according to the up-to-date production information. We reserve the rights to make the changes about specifications, packaging and sullying without prior notice.
- When the valve is installed, the critical level mark on fill valve (identified by a C.L mark on valve body) should be at least 1″ (=25.4 mm) above top of overflow pipe.
- We shall not be responsible for any failure caused by using parts from other manufacturer.
- Water temperature: 2°-45°C
- Water pressure: 0,1-16 bar.
⚠ WARNING
Do not use or drop any chlorine or any chemical related components. Use of such products will result in damaging the cistern components and may cause flooding. Do not overtighten because the cistern/bowl may crack.
Preparation:
Please remove the worn outfitting’s and clean your cistern when you are about to install a new one. There might be a lot of impurities in your cistern so clean it first.
Water level adjustment
Fill valve installation
Fill Valve Cleaning
Troubleshooting
Thank you for choosing our products. If there is any question, please contact the local distributor and they will give you satisfactory response.
SERVIS
Fero-Term d.o.o.
Gospodarska 17, 10255 D. Stupnik, HR
servis@fero-term.hr
Fero-Term d.o.o.
Stobrecka 5, Split
servis.dalmacija2@fero-term.hr
Fero-Term d.o.o.
Ulica 84. gardijske bojne HV Termiti 41, Zadar
servis.dalmacija@fero-term.hr
Documents / Resources
![]() |
VOXORT V455845 Fill Value [pdf] Instruction Manual V455845, V455845 Fill Value, V455845, Fill Value, Value |