SM Series Square Mirror
“
Specifications:
- Model: Aluminium Mirror
- Components: Square Mirror with Frame
- Material: Aluminium
- Quantity: 1 Mirror, 2 Screws, 2 Wall Plugs
- Tools Required: Drill, Rubber Mallet, 5/16 Drill Bits, Level,
Pencil, Screwdrivers, Safety Glasses
Product Usage Instructions:
Component Details & Pre-Installation Guidelines:
Inspect the boxes for damages before installation. Contact
customer service within 7 days of installation for any issues.
Contact local building codes for installation standards.
Installation Steps:
- Select the desired position of the mirror. Level and mark the
location. - Drill holes approximately 1 1/2 inches deep at the marked
location. - Install the screws, leaving a gap of 1/8 inch between the screw
head and the wall. - Slide the mirror down into place.
Detailed Diagram of Aluminium Mirror Components:
FAQ:
Q: Do I need to wear safety glasses during installation?
A: Yes, safety glasses should always be worn when working with a
drill.
Q: What should I do if I notice damages to the product upon
delivery?
A: Contact customer service within 7 days of installation for a
resolution.
“`
Installation Manual Manual de Instalación
626-341-5763
SQUARE MIRROR WITH FRAME ESPEJO CUADRADO CON MARCO
Model Number/Número de modelo: 2436, 3036, 4236, 4836, 6036, 7236
TABLE OF CONTENTS
01
Component Details Pre-Installation Guidelines
1 2
English
Installation Steps
3-5
02
Español
Detalles del componente Instrucciones previas a la instalación IPasos de instalación
6 7 8-10
Detailed Diagram of Aluminium Mirror Components
SCREW 1 1/2″ 1
PARTS LIST.
MIRROR(1 PCS)
1 1/2″ SCREW(2 PCS)
WALL PLUG(2 PCS)
WARNING: SAFETY GLASSES SHOULD ALWAYS BE WORN WHEN WORKING WITH DRILL.
REQUIRED TOOLS:
DRILL
RUBBER MALLET
5/16″ DRILL BITS
LEVEL
PENCIL
SCREW DRIVERS
SAFETY GLASSES
Thank you for choosing our Aluminium Mirror. We hope to provide you with the most satisfying product and user experience.
1.Prior to installation, please inspect the boxes for damages due to shipping. If there- is a
free of charge after 7 business days from the installation of the product. Feel free to cont you have any questions regarding your Order number.
2.Please make sure to contact your local building codes with questions on installation stand
2
Follow the appropriate diagram below
VERTICAL ASSEMBLY
HORIZONTAL ASSEMBLY
STEP 1
Select the desired position of the mirror. Level and mark the location.
Thank you for choosing our Aluminium Mirror. We hope to provide you with the mostsatisfying product and user experience.
1.Prior to installation, please inspect the boxes for damages due to shipping. If there- is a
free of charge after 7 business days from the installation of the product. Feel free to cont you have any questions regarding your Order number.
2.Please make sure to contact your local building codes with questions on installation stand
3
STEP 2
MODEL NO.
VERTICAL
HORIZONTAL
ASSEMBLY
ASSEMBLY
STEP 3 3.1 Drill holes approximately 1 1/2″ deep at the marked location.
stud.
4
STEP 4 Install the screw
, leaving a gap of 1/8″ between the screw head and the wa
STEP 5 wall, and slide it down, as shown in Figure 2.
PAD 5
Diagrama Detallado de los Componentes del Espejo de Aluminio
TORNILLO DE 1 1/2 ” 6
LISTA DE PIEZAS .
ESPEJO (1
)
TORNILLO DE 1 1/2″
TACO DE PARED
ADVERTENCIA: SIEMPRE SE DEBEN USAR GAFAS DE SEGURIDAD AL TRABAJAR CON UN TALADRO.
HERRAMIENTAS NECESARIAS:
TALADRO
MARTILLO DE GOMA
5/16″ BROCAS
NIVEL
LÁPIZ
DESTORNILLADORES
GAFAS DE SEGURIDAD
Gracias por elegir nuestro Espejo de Aluminio. Esperamos proporcionarle el producto más satisfactorio y una experiencia de usuario excelente.
condiciones de la instrucción puede afectar la garantía del producto.
1.Antes de la instalación, por favor, inspeccione las cajas en busca de daños durante el env
correo electrónico dentro de los 7 días hábiles posteriores a la fecha de entrega. Tenga en c
días hábiles desde la instalación del producto. No dude en contactarnos si tiene alguna preg con respecto a su número de orden de compra.
2.Por favor, asegúrese de contactar con los códigos de construcción locales para preguntas
sobre estándares de instalación. Los códigos de construcción y de plomería pueden variar seg la ubicación.
7
Sigue el diagrama correspondiente a continuación
ENSAMBLAJE VERTICAL
ENSAMBLAJE HORIZONTAL
PASO 1
Thank you for choosing our Aluminium Mirror. We hope to provide you with the mostsatisfying product and user experience.
1.Prior to installation, please inspect the boxes for damages due to shipping. If there- is a
free of charge after 7 business days from the installation of the product. Feel free to cont you have any questions regarding your Order number.
2.Please make sure to contact your local building codes with questions on installation stand
8
PASO 2
NÚMERO DE MODELO
ENSAMBLAJE
ENSAMBLAJE
VERTICAL
HORIZONTAL
PASO 3 ubicación marcada.
Para paneles de yeso con un grosor superior a 10-12 mm, asegúrese de usar los anclajes designados para paneles de yeso durante la instalación. Para paneles de yeso con un grosor infe
9
PASO 4 tornillo y la pared.
PASO 5 contra la pared y deslícelo hacia abajo, como se muestra en la Figura 2.
ALMOHADILLA 10
Documents / Resources
![]() |
TaiMei SM Series Square Mirror [pdf] Instruction Manual SM, 626-341-5763, SM Series Square Mirror, SM Series, Square Mirror, Mirror |