HALO HAFH-RF Static Fixed Height Return Frame Instruction Manual

HAFH-RF Static Fixed Height Return Frame

Litlhaloso:

  • Product Name: Halo Static Return Frame
  • Model Variants: HAFH-RF, HAFH-SF
  • Likarolo tse kenyelelitsoeng:
    • Tafole maoto x1
    • Kholomo x1
    • Bolt: M6x12 x2
    • Screw: ST4x20 x13
    • Masakana a mahlakoreng x1
    • Letlapa la rabara x10
    • Foreimi e ka holimo-1 x1
    • Bolt: M6x10 x3
    • Borakete e bohareng x1
    • Liporo tsa bohareng x2
    • Foreimi e ka holimo-2 x1
    • Liboutu tsa letsoho M6x10 x2
    • Allen Wrench(4mm) x1
    • Allen Wrench(5mm) x1
    • Tlamo ea thapo x2

Litaelo tsa Tšebeliso ea Sehlahisoa:

Litaelo tsa Kopano:

Mohato oa 1: Lokolla liboutu tse kentsoeng pele le
lokisa bolelele ba foreimi e ka hodimo hore e tsamaellane le boholo ba tafole
holimo.

Mohato oa 2: Insert the Column into the top frame
and fix it with 4 screws M6x12.

Mohato oa 3: Place the table feet on the column,
align, and tighten the bolt.

Mohato oa 4: Place the side bracket on the top frame
le ho tiisa liboutu.

Mohato oa 5: Connect the return frame to the single
workstation, fix it with 2 hand bolts, and fix the center brackets
ka likurufu M6x10.

Mohato oa 6: Mount the tabletop and fix it with
screws ST4x20. Fix the center bracket with screws M6x10.

Kemiso ea Terei ea Cable:

Mohato oa 1: Fix the cable tray to the cable tray
arms with screws M6x10.

Mohato oa 2: Kenya li-brackets tsa U tafoleng
frame with screws M8x10. Mount the cable tray to the desk frame and
fix it with screws M6x10.

Kenyelletso ea Panel ea Screen (Skrine sa Lekunutu sa Shush30):

Mohato oa 1: Kenya lipoleiti tse tiisitsoeng skrineng
phanele.

Mohato oa 2: Install the screen brackets to the
Shush30 Extrusion with screws M5x6.

Mohato oa 3: Fix the screen brackets to the desk
frame with screws M6x10.

Kenyelletso ea Eco Panel Screen Panel:

Mohato oa 1: Install the screen brackets on the
cable tray arm with screws M6x10.

Mohato oa 2: Beha karolo ea EPS skrineng
brackets and secure using double-ended bolts M5*32mm through the
holes created in the Eco Panel Screen.

Lipotso Tse Botsoang Khafetsa (FAQ):

Q: How many components are included in the Halo Static Return
Frame?

A: The Halo Static Return Frame includes various components such
as table feet, columns, bolts, screws, side brackets, rubber pads,
top frames, hand bolts, Allen wrenches, and cable ties.

Q: How do I install the cable tray on the desk frame?

A: To install the cable tray, first fix it to the cable tray
arms using provided screws M6x10. Then, attach U brackets to the
desk frame with screws M8x10 and mount the cable tray, securing it
ka likurufu M6x10.

Q: What is required for installing the Eco Panel Screen?

A: Installing the Eco Panel Screen requires screen brackets,
double-ended bolts, a drill bit (not included), and a suitable
Allen key for tightening.

"`

Halo Static Return Frame Instruction Manual

Halo Static Fixed Height Return Frame (HAFH-RF)

Halo Static Single Sided Fixed Height Workstation Frame (HAFH-SF)

1

Likarolo tsa likarolo

NO. Lebitso la Karolo

PCS

NO. Lebitso la Karolo

PCS

1

Tafole maoto

1

9

Bracket e bohareng

1

2

Kholomo

1

10 Center rails

2

3

Bolt: M6x12

2

11 Foreimi e ka holimo-2

1

4

Setšoantšo: ST4x20

13

12 Hand bolts M6x10

2

5

Masakana a mahlakoreng

1

13 Allen Wrench(4mm)

1

6

Moqomo oa Rubber

10

14 Allen Wrench(5mm)

1

7

Foreimi e ka holimo-1

1

15 Thae ea cable

2

8

Bolt: M6x10

3

2

Litaelo tsa Kopano
Mohato oa 1 Lokolla liboutu tse kentsoeng pele 'me U lokise bolelele ba foreimi e ka holimo ho tsamaisana le boholo ba tafole.
Step 2 Inset the Column to the top frame,fix column with 4pcs screws M6x12 like.
3

Mohato oa 3
Beha maoto a tafole holim'a kholomo ebe u e potoloha ebe u e etsa hore e lumellane, ebe u tiisa bolt e kentsoeng pele.
Mohato oa 4 Beha bracket e lehlakoreng holim'a foreimi e ka holimo 'me u tiise liboutu.
4

Step 5 Connect the return frame to the single workstation and fixed with 2 hand bolts. Fix the centre brackets with 2pcs screws M6x10.
Step 6 Mount the tabletop and fix it with24 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10
5

Cable tray installation Step 1 – Fix the cable tray(B2-SSCT ) to the cable tray arms(HP-SSARM) with 8 pcs M6x10 screws.
Mohato oa 2 - Kenya li-brackets tsa U ho foreime ea deske ka li-screw tse 4 tsa M8x10. - Beha terei ea thapo ho foreime ea deske ebe u e lokisa ka li-screws tse 6 tsa M6x10
6

Ho kenya liphanele tsa skrine ( Skrine ea Lekunutu ea Shush30 ) Mohato oa 1 - Kenya lipoleiti tse kentsoeng skrineng (lipoleiti li ka fumanoa ka lebokoseng la B2-SBRAC)
Mohato oa 2 - Kenya li-brackets tsa skrine ( B2-SBRAC ) ho Shush30 Extrusion ka li-screw tse 8 tsa M5x6.
7

Mohato oa 3 - Lokisa li-brackets tsa skrine ( B2-SBRAC ) ho foreimi ea deske ka li-screw tse 10 tsa M6x10.
8

EPS ( 900mm H Eco Panel ) Ho kenngwa ha phanele ya skrine Mohato wa 1 – Kenya masakana a skrineng(B2-SBRAC) letsohong la terei ya thapo (B2-SSARM)ka 10 PCS M6x10 Screw
Masakaneng a lebisa moo linepe li hlahang.
Mohato oa 2 - Beha karolo ea EPS holim'a masakaneng a skrine U sebelisa 6mm drill bit (e sa kenyelelitsoe), phunya masoba ho Eco Panel Screen ho latela likoti tsa bracket tse ka morao (Hlokomela: Carbide Drill Bits Work Best For PET panel) - Beha 8 x Double Ended Bolts M5* 32mm - 6mm (B2) o entse likoti tsa AC ka har'a bracket ea hau. Eco Panel Screen. Tiisa bolt e qetellang habeli ka senotlolo sa Allen.
9

Litokomane / Lisebelisoa

HALO HAFH-RF Static Fixed Height Return Frame [pdf] Buka ea Taelo
HAFH-RF, HAFH-RF Static Fixed Height Return Frame, Static Fixed Height Return Frame, Foreimi e tsitsitseng ea ho Khutlisa Height, Height Return Frame.

Litšupiso

Tlohela maikutlo

Aterese ea hau ea lengolo-tsoibila e ke ke ea phatlalatsoa. Libaka tse hlokahalang li tšoailoe *