seeed studio logo

reComputer Industrial

Assembly Guide

1

2 3 4 5
seeed studio reComputer Industrial 1 seeed studio reComputer Industrial 2 seeed studio reComputer Industrial 3 seeed studio reComputer Industrial 4 seeed studio reComputer Industrial 5

KM3.0 x L32.0

120°-KM3.0 x L5.0 CM3.0 x L4.0 CM2.0 x L3.0 

Stud-M3 x 6.5+M2 x 2.0

Step 1

seeed studio reComputer Industrial A1

Remove the four screws from the bottom.

Step 2

seeed studio reComputer Industrial A2

Remove the two side panels.

Step 3

seeed studio reComputer Industrial A3

Remove the rear case.

Step 4

seeed studio reComputer Industrial A4

Remove the four fixing screws of the carrier board.

Step 5

seeed studio reComputer Industrial A5

If you need to replace the SSD, remove the screws, and gently remove the SSD module.

Step 6

seeed studio reComputer Industrial A6

If you need to install a LoRaWAN® module, insert the LoRaWAN® module into the Mini PCIe interface (lower interface) and lock it with two screws. If you need to install a 4G/5G module, insert the 4G/5G module into the M.2 Key B interface (upper interface) and lock it with one screw. Please note that only one module can be installed at a time on these two interfaces

Step 7

seeed studio reComputer Industrial A7

Install the carrier board and lock it with four screws.

Step 8

seeed studio reComputer Industrial A8

Install the rear case.

Step 9

seeed studio reComputer Industrial A9

Install the two side panels

Step 10

seeed studio reComputer Industrial A10

Lock them with four screws.

Step 11

seeed studio reComputer Industrial A11

Documents / Resources

seeed studio reComputer Industrial [pdf] Installation Guide
reComputer Industrial, reComputer, Industrial

References

Leave a comment

Your email address will not be published. Required fields are marked *