INSTALLATION INSTRUCTIONS
LRP2L
PHI LATCH MONITORING SWITCH KIT
MODELS: 2200 & 2800 VERTICAL ROD DEVICES
LRP2L Phi Latch Monitoring Switch Kit
Remove head cover. Install Switch Bracket using supplied screws, inserting the longer screw through supplied cable tie. Route wires through tie. Re-attach head cover.
NOTE: Regardless of handing, the Switch Bracket is always attached to the top side of the device head. The Switch Lever may require adjustment after installation of vertical rods.
SWITCH SPECIFICATION
WHT – COM
YEL – N/O
ORG – N/C 5
AMP @ 125 VAC
RESISTIVE
Any suggestions or comments to this instruction or product are welcome. Please contact us through our website or email engineer@sdcsecurity.com
SECURITY DOOR CONTROLS
WWW.SDCSECURITY.COM
[t] 800.413.8783 805.494.0622
E-mail: service@sdcsecurity.com
801 Avenida Acaso, Camarillo, CA 93012 PO Box 3670, Camarillo, CA 93011
P:\INST INSTRUCTIONS\ELR KITS\INST-LRP2L
REV D 08-22
Documents / Resources
![]() |
SDC LRP2L Phi Latch Monitoring Switch Kit [pdf] Instruction Manual LRP2L Phi Latch Monitoring Switch Kit, LRP2L, Phi Latch Monitoring Switch Kit, Latch Monitoring Switch Kit, Monitoring Switch Kit, Switch Kit |