Instruction Manual for SDC models including: LRP2L Phi Latch Monitoring Switch Kit, LRP2L, Phi Latch Monitoring Switch Kit, Latch Monitoring Switch Kit, Monitoring Switch Kit, Switch Kit
File Info : application/pdf, 1 Pages, 282.96KB
DocumentDocumentSECURITY DOOR CONTROLS WWW.SDCSECURITY.COM [t] 800.413.8783 805.494.0622 E-mail: service@sdcsecurity.com 801 Avenida Acaso, Camarillo, CA 93012 PO Box 3670, Camarillo, CA 93011 INSTALLATION INSTRUCTIONS LRP2L PHI LATCH MONITORING SWITCH KIT MODELS: 2200 & 2800 VERTICAL ROD DEVICES Remove head cover. Install Switch Bracket using supplied screws, inserting the longer screw through supplied cable tie. Route wires through tie. Re-attach head cover. NOTE: Regardless of handing, the Switch Bracket is always attached to the top side of the device head. The Switch Lever may require adjustment after installation of vertical rods. Switch Bracket SWITCH SPECIFICATION WHT - COM YEL - N/O ORG - N/C 5 AMP @ 125 VAC RESISTIVE Switch Lever Cable Tie Mounting Screws P:\INST INSTRUCTIONS\ELR KITS\INST-LRP2L REV D 08-22 Page 1 Any suggestions or comments to this instruction or product are welcome. Please contact us through our website or email engineer@sdcsecurity.com