Instruction Manual for SDC models including: LRP2L Phi Latch Monitoring Switch Kit, LRP2L, Phi Latch Monitoring Switch Kit, Latch Monitoring Switch Kit, Monitoring Switch Kit, Switch Kit

Visio-INST-LRP2L.vsdx

SDC-26

INSTALLATION INSTRUCTIONS


File Info : application/pdf, 1 Pages, 282.96KB

PDF preview unavailable. Download the PDF instead.

INST-LRP2L
SECURITY DOOR CONTROLS  WWW.SDCSECURITY.COM [t] 800.413.8783  805.494.0622  E-mail: service@sdcsecurity.com  801 Avenida Acaso, Camarillo, CA 93012  PO Box 3670, Camarillo, CA 93011
INSTALLATION INSTRUCTIONS
LRP2L PHI LATCH MONITORING SWITCH KIT MODELS: 2200 & 2800 VERTICAL ROD DEVICES
Remove head cover. Install Switch Bracket using supplied screws, inserting the longer screw through supplied cable tie. Route wires through tie. Re-attach head cover.
NOTE: Regardless of handing, the Switch Bracket is always attached to the top side of the device head. The Switch Lever may require adjustment after installation of vertical rods.

Switch Bracket

SWITCH SPECIFICATION
WHT - COM YEL - N/O ORG - N/C 5 AMP @ 125 VAC
RESISTIVE

Switch Lever

Cable Tie

Mounting Screws

P:\INST INSTRUCTIONS\ELR KITS\INST-LRP2L

REV D 08-22

Page 1

Any suggestions or comments to this instruction or product are welcome. Please contact us through our website or email engineer@sdcsecurity.com



References

Microsoft: Print To PDF