Specifications:

  • Column: 4 pcs
  • Side Bracket: 4 pcs
  • ST4x20 Bolts: 40 pcs
  • Rubber Pad: 24 pcs
  • Bolts M6x12: 8 pcs
  • Top Frame-1: 2 pcs
  • Centre Rails: 4 pcs
  • Top Frame-2: 2 pcs
  • Screen Brackets: 4 pcs
  • Bolts M6x10: 14 pcs
  • Connected Beam: 2 pcs
  • Centre Bracket: 2 pcs
  • Allen Wrench(6mm): 1 pc
  • Allen Wrench(4mm): 1 pc
  • Cable Tie: 10 pcs

Product Usage Instructions:

Step 1: Adjusting Top Frame

Loosen the pre-installed bolts and adjust the length of the top
frame to match the size of the table top.

Step 2: Attaching Column and Side Bracket

Insert the column into the top frame and fix it with 4 screws
M6x12. Place the side bracket on the top frame and tighten the
bolts.

Step 3: Installing Screen Brackets

Install the screen brackets using 8 bolts M6x10.

Step 4: Connecting Beam and Top Frame

Insert the connected beam and tighten the pre-installed
bolts.

Step 5: Mounting Tabletop

Mount the tabletop and fix it with 26 screws ST4x20. Also, fix
the centre bracket with 2 screws M6x10.

Step 6: Cable Tray Installation

Fix the cable tray to Back to Back desk frame using 8 screws
M6x10.

Screen Panel Installation (Shush30 Privacy Screen)

Step 1: Insert the tapped plates to the screen
panel.

Step 2: Install the screen brackets to the
Shush30 Extrusion with screws M5x6.

Step 3: Fix the screen brackets to the desk
frame with screws M6x10.

Eco Panel Screen Installation (900mm H Eco Panel)

Step 1: Install the screen brackets with screws
M6x10. Ensure correct bracket direction.

Step 2: Place the EPS panel on the screen
brackets. Drill holes in Eco Panel Screen in line with back to back
screen bracket holes. Secure with double-ended bolts M5*32mm and
Allen key.

Frequently Asked Questions (FAQ):

Q: How many rubber pads are included in the package?

A: There are a total of 24 rubber pads included in the
package.

Q: What size bolts are used for mounting the tabletop?

A: The tabletop is mounted using 26 screws ST4x20.

Q: How many Centre Brackets are required for assembly?

A: Two Centre Brackets are required for assembly.

“`

Boost Static Back To Back Frame Instruction Manual
1

Component parts

NO. Component Name

PCS

NO. Component Name

PCS

1

Column

4

9

Screen brackets

4

2

Side Bracket

4

10 Bolts M6x10

14

3

ST4x20

40

11 Connected beam

2

4

Rubber pad

24

12 Centre bracket

2

5

Bolts M6x12

8

13 Allen Wrench(6mm)

1

6

Top frame -1

2

14 Allen Wrench(4mm)

1

7

Centre rails

4

15 Cable Tie

10

8

Top frame-2

2

2

Assembly Instructions
Step 1 Loosen the pre-installed bolts and Adjust the length of the top frame to match the size of the table top.
Step 2 Inset the column to the top frame,fix lifting column with 4pcs screws M6x12.
3

Step 3 Place the side bracket on the top frame and tighten the bolts.
Step 4 Install the screen brackets with 8 PCS M6x10 Bolts
4

Step 5 Insert the connected beam and tighten the pre-installed bolts
Step 6 Mount the tabletop and fix it with 26 pcs screws ST4x20; Fix the centre bracket with 2 pcs screws M6x10
5

Cable tray installation – Fix the cable tray(B2-B2BCT ) to Back to back desk frame with 8 pcs M6x10 screws.
6

Screen panel installation ( Shush30 Privacy Screen ) Step 1 – Insert the tapped plates to the screen panel ( plates can be found in B2-BBRAC carton )
Step 2 – Install the screen brackets ( B2-BBRAC )to the Shush30 Extrusion with 8 pcs M5x6 screws.
7

Step 3 – Fix the screen brackets ( B2-BBRAC ) to the desk frame with 8 pcs M6x10 screws.
8

EPS ( 900mm H Eco Panel ) Screen panel installation Step 1 – Install the screen brackets(B2-BBRAC) with 8 PCS M6x10 Screws The brackets direction as photos display.
Step 2 – Place the EPS panel on the screen brackets – Using a 6mm drill bit ( not included ), drill out holes in Eco Panel Screen in line with back to back screen bracket holes ( Note: Carbide Drill Bits Work Best For PET panel ) – Place 8 x Double Ended Bolts M5* 32mm – 6mm through screen bracket ( B2-BBRAC ) holes and the holes you have created in the Eco Panel Screen. Tighten double ended bolt with Allen key.
9

Documents / Resources

Rapidline B2-B2BCT, B2-BBRAC Boost Static Back To Back Frame [pdf] Instruction Manual
B2-B2BCT, B2-BBRAC, B2-B2BCT B2-BBRAC Boost Static Back To Back Frame, B2-B2BCT B2-BBRAC, Boost Static Back To Back Frame, Static Back To Back Frame, Back To Back Frame, Back Frame, Frame

References

Leave a comment

Your email address will not be published. Required fields are marked *