PRO Vibe EVO Handlebar
Model: PRS10076B
PRO logo: 'PRO' in large white letters inside a black circle with 'POWERS YOUR PERFORMANCE' text below.
Parts List
Item | Description | Part Number |
---|---|---|
1 | Carbon handlebar | [YPRHA0515] |
2 | Top grip left | [YPRGP0088] |
3 | Top grip right | [YPRGP0088] |
4 | Top cap | [YPRHA0515] |
5 | Steerer bolt | [YPRHA0516] |
6 | Bolt cap | [YPRHA0516] |
7 | Shim 28.6 - 31.8mm | [YPRHA0518] |
8 | Shim 2 degree 28.6 - 31.8mm (2x) | [YPRHA0518] |
9 | Barrel nut | [YPRHA0517] |
10 | Stem clamp bolt (2x) | [YPRHA0517] |
11 | Cable port cover (2x) | [YPRHA0519] |
Tools shown: 4mm Allen key, T25 Torx key, PRTL0080 tool.
Brake/Shift Cable Routing
This section details the routing of brake and shift cables through the PRO Vibe EVO Handlebar.
Diagram A shows the overall routing path with points labeled A, B, C, D, E.
Step A1: Route cables through the handlebar. The diagram shows cables (labeled 1 and 2) being fed through designated channels.
Step A2: Secure cables using the provided cable port cover (Item 11). A small clip or cover is shown being attached.
Step B: Route cables from the brake levers towards the stem. The diagram shows cables (labeled 1 and 2) exiting the handlebar near the stem clamp area.
Step C: Continue routing cables. The diagram shows cables (labeled 1, 2, 3) being guided through internal channels or ports.
Step D: Final cable connection. The diagram shows cables (labeled D) being connected to a junction box or derailleur, with a note indicating 'EW-RS910*' is not included.
Note: EW-SD50 cables are used.
Installation and Assembly
Follow these steps for proper installation and adjustment of the PRO Vibe EVO Handlebar.
Step 1: Top Cap Installation
1. Insert the steerer bolt (Item 5) into the top cap (Item 4).
2. Place the top cap assembly onto the steerer tube.
Diagram shows inserting a bolt into a cap and placing it on a steerer tube.
Step 2: Stem Clamp and Angle Adjustment
1. Attach the stem to the steerer tube using the stem clamp bolts (Item 10) and appropriate shims (Item 7 or 8) if needed. The diagram shows bolts (A) and clamps (B) being used with angle indicators (+2°, 0°, -2°).
2. Adjust the handlebar angle using the shims (Item 7 or 8). The diagram shows shims being inserted between the stem and handlebar clamp, with measurements for angle adjustment (e.g., 28.6 - 31.8mm).
Diagram shows angle adjustment options (+2°, 0°, -2°) and a close-up of shim placement with a 1-3mm gap indication.
Step 3: Securing the Handlebar
1. Use a 4mm Allen key to tighten the steerer bolt (Item 5) to a maximum of 8 Nm.
2. Attach the bolt caps (Item 6) over the bolts.
3. Use a T25 Torx key to tighten the stem clamp bolts (Item 10) to a maximum of 5 Nm.
Diagram shows tightening bolts with 4mm and T25 keys, with torque specifications.
Step 4, 5, 6: Final Brake Lever/Shifter Attachment
These steps illustrate the final attachment and positioning of brake levers or shifters onto the handlebar grips.
Diagrams show the process of sliding and securing brake levers/shifters onto the handlebar grips.
Support
If you encounter issues or have questions, it is recommended to contact your local dealer.
Diagram shows a confused person thinking '[Question Mark]', then contacting a dealer via phone, and the dealer responding positively.
For more information, visit: WWW.PRO-BIKEGEAR.COM
PRO logo: 'PRO' in large white letters inside a black circle with 'POWERS YOUR PERFORMANCE' text below.