Growatt TPM-CT-E SDM630MCT-MA Three-phase Smart Meter Quick Guide

Growatt TPM-CT-E SDM630MCT-MA Three-phase Smart Meter Quick Guide

1. Overview

The SDM630MCT-MA is a multi-function rail meter designed for accurate measurement and display of various power parameters in 1P2W, 3P3W, and 3P4W systems. It measures voltage, current, power, frequency, active power, reactive power, forward power, reverse power, and total harmonics. This meter is suitable for real-time power monitoring systems, offering multi-functionality, high stability, and a long lifespan. It connects with an external current transformer and is compatible with various high and low voltage power grids. The meter features an RS485 communication interface, supporting a maximum communication rate of 38400bps for remote communication.

2. Technical Parameters

General Specifications Value
Rated voltage3×230/400Vac
Rated frequency50/60Hz
L-N voltage range100~289Vac
L-L voltage range173~480Vac
Auxiliary power voltage range85~275Vac or 120~380Vdc
AC withstand voltage4KV for 1 min
Input current range<40mA
Short-term overcurrent20*IMAX for 0.5s
Max. Reading9999999.9kWh/kVArh
Accuracy
Active power0.5% of range maximum
Reactive power1% of range maximum
Environment
Rated temperature-25℃~+55℃
Limit temperature-40℃~+70℃
Relative humidity (average annual)≤90%
Installation categoryCAT III
Degree of pollutionConform to RoHS
Communication
CommunicationRS485 output for Modbus RTU
Baud rate9600bps(default)
Pulse3200imp/kWh
Mechanics
Mounting dimensions94.5x72x65mm(LxWxH)
Din rail dimensionsDIN rail 35mm
Protection levelIP51 (indoor)

3. Unpacking

Item Quantity Description
A1Three-phase meter
B1User Manual
C1RS485 cable (standard length 15m)
D3Current Transformer

4. Dimension (Unit:mm)

The meter has a rectangular form factor with dimensions labeled as 94.5mm (Length), 72mm (Width), and 65mm (Height). A 35mm DIN rail mounting slot is indicated.

5. Installation

Note: Growatt Grid-tied inverters are referred to as "PV inverters" and Growatt Hybrid/AC Coupled Inverters as "Hybrid Inverters".

a. Voltage sampling and power supply wiring

Wiring for voltage sampling and power supply:

  • L1 voltage sampling line connects to meter Pin 4.
  • L2 voltage sampling line connects to meter Pin 3.
  • L3 voltage sampling line connects to meter Pin 2.
  • N voltage sampling line connects to meter Pin 1.

b. Current transformer wiring

Wiring should follow the diagram. Current flows from K to L (grid to load).

  • L1 CT: White Line to meter Pin 20, Black Line to meter Pin 19.
  • L2 CT: White Line to meter Pin 18, Black Line to meter Pin 17.
  • L3 CT: White Line to meter Pin 16, Black Line to meter Pin 15.

c. RS485 wiring

Connect RS485 A to Pin 14 and RS485 B to Pin 13. Use 568B standard network cable. White-orange cable is 485B, white-blue cable is 485A.

d. Installing a Hybrid Inverter

Diagram shows connection for Hybrid Inverter, including RS485, GRID, EPS, ATS-T, Load Breaker, and Grid-N connections. The meter is shown with numbered pins for voltage and current inputs, and RS485 connections.

e. Installing a PV Inverter

For PV Inverters, cut off the RJ45 modular plug. Crimp accessory terminals onto two cables and insert them into the corresponding interface of the inverter's 8-pin signal connector.

f. Connecting the 8-pin signal connector

Plug the 8-pin signal connector to the inverter. [CLICK!] The Inverter Side.

g. RS485 cable length

The standard RS485 cable length is 15m. For longer runs, use an Ethernet coupler. Ensure the cable is less than 100m, with a recommended length under 25m.

6. Button Definition And Display

The meter has four touch buttons: "ESC ( ← ) V/A", "↑ (Alt) MD/PH/HZ", "↓ (Shift) P", "ENTER ( → ) E". Operations can be short press (less than 1 second) or long press (more than 2 seconds).

NO. Button Features Viewable content (short press)
1 [ESC] Short press: display voltage and current,
Long press: ESC
Phase voltage, Line voltage, Phase current, Neutral current, Voltage harmonics, Current harmonics
2 [↑] Short press: display power factor and frequency,
Long press: Alt
Phase(Total) frequency, Total power factor, Phase(Total) maximum current demand
3 [↓] Short press: display power,
Long press: Shift
Phase(Total) active power, Phase(Total) reactive power, Phase(Total) apparent power
4 [ENTER] Short press: display electric energy,
Long press: Enter
Total active electric energy, Total reactive electric energy, Forward active electric energy, Reverse active electric energy, Forward reactive electric energy, Reverse reactive electric energy

7. Trouble Shooting

Note: The meter and SPH default communication address is 02, the baud rate is 9600, and the current ratio is 100A/40mA (determined by the CT match). If communication is not established, confirm the address and baud rate are accurate.

To enter the setting menu (default password 1000), long press [E]. Use [M] and [P] to navigate pages. If a page flashes, it can be set using [M] and [P]; otherwise, press [E] to enter. Long press [E] to confirm settings, then press [ESC] to exit.

Setting examples of current ratio: When CT1 is set to 100, the primary current is 100A (the current ratio is determined by the CT that the meter actually matches).

System Wiring Diagram: A complete system wiring diagram is provided for reference if the meter is not operating normally. The diagram shows connections for Hybrid or PV Inverters, including RS485, GRID, EPS, Load Breaker, and Grid-N. It details meter connections for voltage inputs (Pins 1-4) and current inputs (via CTs to Pins 15-20), and RS485 communication (Pins 13-14). It also shows Grid Side, Load Breaker, and On-grid load connections. The EPS port is exclusive to hybrid inverters. A detail indicates accessing the sampling line instead of the power line.

Fault phenomenon Reason analysis Solution
Big deviation between electric energy measurement and actual value. 1. Wiring error, voltage and current corresponding phase sequence is wrong.
2. The output line of the current transformers is reversed.
3. The transformer ratio is not set, the meter displays the secondary data.
1. Refer to the wiring diagram to check the wiring.
2. If the transformer ratio setting is wrong, please set the voltage ratio and current ratio correctly.
3. If the issue still exists, please contact your local supplier.
RS485 communication error (Inverter error 401) 1. RS485 cable is open circuit, short circuit or reversed.
2. The address, baud rate and data parity of the meter do not match the SPH.
1. If there is a problem with the communication cable, please replace the communication cable.
2. Set the correct address, baud rate, and data bit check digit of the meter using the buttons.
3. If the issue still exists, please contact your local supplier.

8. Service and Contact

Shenzhen Growatt New Energy Co., Ltd

Address: 4-13/F, Building A, Sino-German (Europe) Industrial Park, Hangcheng Ave, Bao'an District, Shenzhen, China

Phone: +86 0755 2747 1942

Email: service@ginverter.com

Website: www.ginverter.com

The document reference number is GR-UM-209-A-02. A download link for the manual is available via their website.

Social Media: [Facebook icon] Growatt New Energy

Models: TPM-CT-E, TPM-CT-E Three Phase Smart Meter, Three Phase Smart Meter, Smart Meter, Meter

File Info : application/pdf, 2 Pages, 1.02MB

PDF preview unavailable. Download the PDF instead.

TPM-CT-E Quick Guide EN 202401

References

Related Documents

Preview Growatt TPM-CT-C-EU(DTSU666) Three-phase Smart Meter Quick Guide | Installation & Operation
Comprehensive guide for the Growatt TPM-CT-C-EU(DTSU666) three-phase smart meter. Covers technical specifications, unpacking, detailed installation instructions, wiring diagrams, display parameters, troubleshooting, and service contact information.
Preview Growatt TPM-C (DTSU666) Smart Meter Quick Guide
This guide provides an overview, technical parameters, installation instructions, and troubleshooting for the Growatt TPM-C (DTSU666) three-phase smart meter.
Preview Growatt DDSU666 Single-phase Meter User Manual
User manual for the Growatt DDSU666 single-phase electronic energy meter. This guide details installation, technical parameters, display functions, and service contact information for efficient power monitoring.
Preview Growatt Smart Meter Installation and Configuration Guide
Comprehensive guide for installing and configuring Growatt smart meters, including models like Chint DTSU666, DDSU666, Eastron SDM630MCT, SDM630-MODBUS V3, SDM230, and SDM120CT. Covers technical specifications, wiring, communication setup, and troubleshooting for various smart meter installations with Growatt inverters.
Preview Growatt GroBoost Quick Installation Guide - Optimize Solar Energy
This guide provides essential information for installing and operating the Growatt GroBoost, a smart power regulator designed to enhance solar energy self-consumption and manage household energy loads efficiently.
Preview Growatt GroBoost Quick Installation Guide: Smart Solar Water Heater Control
This guide details the installation, operation, and app integration of the Growatt GroBoost, a smart device for optimizing solar energy usage with water heaters, enhancing self-consumption.
Preview Growatt Noah 2000: Shelly Smart Meter Integrationsanleitung
Anleitung zur Integration von Shelly Smart Metern (3EM, Pro 3EM) mit dem Growatt Noah 2000 Solarspeicher. Ermöglicht intelligente Überwachung und Steuerung des Energieverbrauchs zur Maximierung der Solarenergienutzung.
Preview Growatt THOR 11/22AS-S-V1 3-Phase AC Charger Quick Installation Guide
Comprehensive quick installation guide for the Growatt THOR 11/22AS-S-V1 3-phase AC EV charger, covering product description, installation, app setup, operation, troubleshooting, and specifications.