Longi Hi-MO X10 Photovoltaic Module Installation Guide

Introduction

This guide provides essential information for the safe and correct installation of Longi Hi-MO X10 photovoltaic modules. It is intended for qualified installers who are familiar with electrical systems and safety procedures for solar installations. Please read this manual thoroughly before commencing any installation work.

Safety Precautions

Safety is paramount during the installation of photovoltaic systems. Adhere to the following precautions:

  • Always wear appropriate personal protective equipment (PPE), including safety glasses, gloves, and non-conductive footwear.
  • Ensure all electrical work is performed by qualified personnel.
  • Disconnect all power sources before performing any maintenance or installation tasks.
  • Avoid working in wet conditions or during thunderstorms.
  • Handle modules with care to prevent damage.
  • Ensure proper grounding of the modules and mounting structure.
  • Follow local electrical codes and regulations.
  • Warning Symbol [!] - Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.
  • Caution Symbol [⚠️] - Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury.

Module Components and Handling

The Longi Hi-MO X10 module is designed for high performance and durability. Each module typically includes:

  • Photovoltaic cells
  • Protective glass
  • Encapsulant layers
  • Backsheet
  • Junction box with bypass diodes
  • DC output cables with connectors

Handling:

  • Carry modules vertically.
  • Avoid dropping or impact.
  • Do not step on, walk on, or place heavy objects on the modules.
  • Keep modules dry and protected from moisture.
  • Store modules in a cool, dry place, away from direct sunlight and extreme temperatures.

Installation Procedures

This section outlines the general steps for installing Longi Hi-MO X10 modules. Specific details may vary based on the mounting system and site conditions.

1. Mounting Structure Installation

Install the mounting structure according to the manufacturer's instructions and local building codes. Ensure the structure is securely fastened and capable of supporting the weight of the modules and anticipated environmental loads (wind, snow).

2. Module Mounting

Attach the modules to the mounting structure using the specified clamps and hardware. Ensure the clamps are correctly positioned and tightened to the recommended torque. Torque Symbol [⚙️] - Refer to the mounting system manual for specific torque values.

Modules should be mounted in portrait orientation for optimal performance and structural integrity.

3. Electrical Connections (DC Side)

Connect the modules in series or parallel strings as per the system design. Ensure connectors are clean and dry before mating. Push connectors together firmly until they click into place. Connection Symbol [✔️] - A secure connection is indicated by an audible click.

Wiring Diagram Description: Imagine a series of solar panels connected end-to-end. The positive (+) terminal of one panel's cable connects to the negative (-) terminal of the next panel. This continues to form a string. Multiple strings may then be connected in parallel to an inverter.

4. Grounding

Proper grounding is critical for safety. Connect the grounding terminal on the back of each module to the grounding conductor of the system using the provided grounding hardware. Ensure the mounting structure is also properly grounded. Grounding Symbol [?] - Connect to the designated grounding point.

5. System Integration

Connect the DC output of the module strings to the DC input of the inverter. Ensure correct polarity. Connect the inverter to the AC grid according to the inverter manufacturer's instructions and local regulations.

6. System Testing

After installation, perform electrical tests to verify correct connections, voltage, and current. Check for any faults or errors. Test Symbol [▶️] - Initiate system test sequence.

Maintenance

Regular inspection and maintenance will ensure optimal performance and longevity of the photovoltaic system.

  • Periodically clean the module surfaces, especially if they are covered by dust, dirt, or snow. Use water and a soft cloth or brush.
  • Inspect modules and wiring for any signs of damage, corrosion, or loose connections.
  • Check the mounting structure for stability.

Troubleshooting

If the system is not performing as expected, consult the following common issues:

  • No power output: Check all DC and AC connections, ensure the inverter is operational, and verify that no circuit breakers are tripped.
  • Reduced power output: Inspect modules for shading, dirt, or damage. Check string connections.
  • Error codes on inverter: Refer to the inverter's manual for specific error code meanings and solutions.

Technical Specifications

Key technical data for the Longi Hi-MO X10 module:

ParameterValue
Model NameHi-MO X10
Maximum Power (Pmax)[Simulated Value] Wp
Open Circuit Voltage (Voc)[Simulated Value] V
Short Circuit Current (Isc)[Simulated Value] A
Maximum System Voltage1500 V DC (IEC)
Module Dimensions[Simulated Value] mm x [Simulated Value] mm x [Simulated Value] mm
Weight[Simulated Value] kg
Front GlassHigh transmittance, anti-reflective coating
BacksheetComposite polymer material
FrameAnodized aluminum alloy
Junction BoxIP68 rated, 3 bypass diodes
ConnectorsMC4 compatible
CertificationsIEC, UL, TUV

Note: Specific values are illustrative. Refer to the official datasheet for precise specifications.

Models: DG, Finqu, X10, Finqu Photovoltaic Modules, Finqu, Photovoltaic Modules, Modules

PDF preview unavailable. Download the PDF instead.

longi-hi-mo-x10-aurinkopaneeli-asennusohje-eng Microsoft: Print To PDF

Related Documents

Preview LONGi Solar Module Warranty Certificate for Midsummer Energy Ltd.
Official warranty certificate for LONGi Solar PV Modules issued to Midsummer Energy Ltd., detailing product and performance warranty periods and terms.
Preview LONGi Photovoltaic Module Installation Manual
Comprehensive installation manual for LONGi photovoltaic modules, covering safety, electrical, mechanical, and operational guidelines for professional installers. Includes details on module identification, installation conditions, mounting methods, electrical connections, grounding, and maintenance.
Preview LONGi Photovoltaic Module Installation Manual: Safety, Mechanical, and Electrical Guidelines
This comprehensive installation manual from LONGi provides essential safety information, detailed guidelines for mechanical and electrical installation, grounding procedures, and operation and maintenance recommendations for LONGi photovoltaic (PV) modules, including mono-facial and bifacial types.
Preview 210W Longi HPBC Flexible Solar Panel Specifications
Detailed specifications for the 210W Longi HPBC High Efficiency Battery flexible solar panel, including dimensions and weight.
Preview LONGi Solar PV Modules Installation Manual
Comprehensive installation and safety guide for LONGi Solar PV modules, covering mechanical and electrical installation, grounding, and maintenance procedures.
Preview LONGI PV Module Installation Manual - Comprehensive Guide
Detailed installation, safety, mechanical, electrical, and maintenance guide for LONGI photovoltaic (PV) modules. Covers module identification, wiring, grounding, and performance considerations.
Preview LONGi Hi-MO X10 LR7-60HVH Solar Panel Datasheet (535-560W)
Datasheet for the LONGi Hi-MO X10 LR7-60HVH series solar panels, featuring high efficiency up to 24.8%, 30-year power warranty, and advanced BC technology. Includes technical specifications, certifications, and mechanical data.
Preview LONGI LR5-54HTH Solar Panel Datasheet
Datasheet for the LONGI LR5-54HTH series solar panels, featuring high efficiency, durability, and a 25-year warranty. Includes detailed electrical, mechanical, and operational parameters.