ASCO Series 300 Dual Purpose Manual Transfer Switch

Operator's Manual

H design, 800 through 1200 Amperes

Document Number: 381333-495

Revision: 06/2021

Important Safety Information

DANGER: Used to warn of a hazard situation which, if not avoided, will result in death or serious injury.

WARNING: Used to warn of a hazardous situation which, if not avoided, could result in death or serious injury.

CAUTION: Used to warn of a hazardous situation which, if not avoided, could result in minor or moderate injury.

Refer to the outline and wiring drawings provided with the ASCO SERIES 300 MTDQ and MGDQ for all installation details.

Rating Label: The transfer switch contains a rating label to define operational limits. Refer to the label for specific values.

WARNING: Do not exceed the values on the rating label. Exceeding the rating can cause personal injury or serious equipment damage.

[Image: A photograph of an open ASCO Series 300 transfer switch enclosure showing internal components and a Schneider Electric logo.]

Catalog Number Identification

A typical Catalog Number is shown below with its elements explained. The example is for a H-design, solid neutral, 3 poles, 800 amps, in Type 3R enclosure:

Frame Product Neutral Code Phase Poles Amperes Voltage Group Code Enclosure
H 3MDTQ
3MGDQ
A-solid
B-switched
2
3
800
1000
1200
A 115
B 120
C 208
D 220
E 230
F 240
H 380
J 400
K 415
L 440
M 460
N 480
P 550
Q 575
R 600
00-No Accessory
0X-Accessory
OZ-Custom Accessory
M- Type 3R secure
S- Type 3RX secure (316) SS

Installation

ASCO SERIES 300 Dual Purpose Manual Transfer Switches (MTDQ and MGDQ) are factory assembled and tested. Installation requires mounting, connecting power conductors and auxiliary control circuits (if required).

Supporting Foundation

The supporting foundation for the enclosure must be level and straight. Refer to the applicable enclosure outline drawing included with the transfer switch for all mounting details including door opening space.

If bottom cable entry is used, the foundation must be prepared so that the conduit stubs are located correctly. Refer to the enclosure outline drawing for specified area and location. Provide clearance between field installed conductors and parts of the transfer switch.

When a concrete floor is poured, use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment.

Mounting

Refer to the outline drawing furnished with this switch and mount the SERIES 300 MTDQ and MGDQ according to details and instructions shown.

NOTICE: Protect the transfer switch from construction grit and metal chips to prevent malfunction or shortened life of the transfer switch.

Mount the SERIES 300 MTDQ or MGDQ to a rigid supporting structure. Level all mounting points by using flat washers behind the mounting hole locations to avoid distortion of the switch.

Line Connections

Refer to the wiring diagram provided with the transfer switch. All wiring must be made in accordance with the National Electrical Code and local codes.

DANGER: De-energize the conductors before making any line or auxiliary circuitry connections. Be sure that Source 1 and Source 2 line connections are in proper phase rotation. Place engine generator starting control(s) in the OFF position. Make sure all engine generator(s) are not in operation.

Testing Power Conductors

Do not connect the power conductors to the transfer switch until they are tested. Installing power cables in conduit, cable troughs and ceiling-suspended hangers often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor's strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation.

Connecting Power Conductors

After the power conductors have been tested, connect them to the appropriate terminals on the transfer switch as shown on the wiring diagram provided. Make sure the conductors being installed are suitable for use with the terminals provided on the transfer switch. Standard terminals are solderless, screw type and will accept the wire sizes and types listed on the drawings provided with the transfer switch. Be careful when stripping insulation from the cables; avoid nicking or ringing the conductor. Remove surface oxides from conductors by cleaning with a wire brush. When aluminum conductors are used, apply joint compound to them. Tighten terminals to the torque specified on the rating label.

Quick Connects for Portable Generator Connection

The Dual Purpose Manual Transfer Switch with Integrated Quick Connects contains 16 Series quick connects which provides a connecting means for connecting a portable generator.

Quick connects for Portable Generator connection are located on the Source 2 (emergency) side of this MTDQ or MGDQ.

[Image: Figure 1 - Close-up of multiple quick connect ports.]

Making Quick Connect Connections

  1. Open MTDQ or MGDQ chamber door.
  2. Feed ground (green) cable through trap door located on the bottom of the unit.
  3. Complete the Connection Proper connection:
    A. Grasp connector jacket and firmly insert cam connector into cam plug.
    B. Push on cam connector jacket until connector fully seats in cam plug.
    C. Rotate cam connector jacket counterclockwise until it stops.
  4. Complete the Neutral (white) connection Proper connection:
    A. Grasp connector jacket and firmly Insert cam connector into cam plug.
    B. Push on cam connector jacket until connector fully seats in cam plug.
    C. Rotate cam connector jacket counterclockwise until it stops.
  5. Complete the Phase (hot) connections:
    A. If the phase rotation of the generator and utility power match, connect the Hots as follows:
    [Table showing Generator Hot ASCO SERIES 300 MTDQ or MGDQ A, B, C]
    B. If the phase rotation of the generator and utility power do NOT match, connect the Hots as follows:
    [Table showing Generator Hot ASCO SERIES 300 MTDQ or MGDQ A, B, C]
  6. Proper connection:
    A. Grasp connector jacket and firmly insert cam connector into cam plug.
    B. Push on cam connector jacket until connector fully seats in cam plug.
    C. Rotate cam connector jacket counterclockwise until it stops.
  7. Make sure all connections are right and secure:
    Close MTDQ or MGDQ chamber door, and secure allowing cables to exit cable trap door at the bottom of the unit.

[Image: Figure 2 - Hands connecting green and black quick connect plugs.]

Disconnection of Quick Connects

  1. Verify that the MTDQ or MGDQ is in the OFF or Source 1 position.
  2. Disconnect the Phase (hot) connections, beginning with the furthest to the left.
  3. Disconnect the Neutral (white) connection.
  4. Disconnect the Ground (green) connections.

Quick Connects for Load Bank Connection

The Dual Purpose Manual Transfer Switch with Integrated Quick Connects contains a disconnect breaker and 16 Series quick connects which provides a connecting means for connecting a Load Bank.

Quick connects for Load Bank are located on the Source 1 side of this MTDQ or MGDQ.

[Image: Figure 3 - Photograph of an ASCO Series 300 transfer switch enclosure with the door open, showing quick connect ports on the Source 1 side.]

DANGER: Ensure circuit breaker is OFF and the connectors are locked out from Source power prior to connection.

  1. Open MTDQ OR MGDQ chamber door.
  2. Feed ground (green) cable through trap door located on the bottom of the unit.
  3. Complete the Connection Proper connection:
    A. Grasp connector jacket and firmly insert cam connector into cam plug.
    B. Push on cam connector jacket until connector fully seats in cam plug.
    C. Rotate cam connector jacket counterclockwise until it stops.
  4. Complete the hot connections connection Proper connection:
    A. Grasp connector jacket and firmly Insert cam connector into cam plug.
    B. Push on cam connector jacket until connector fully seats in cam plug.
    C. Rotate cam connector jacket counterclockwise until it stops.
  5. Make sure all connections are right and secure.
    Close MTDQ OR MGDQ chamber door, and secure allowing cables to exit cable trap door at the bottom of the unit.

[Image: Figure 4 - Hands connecting green and black quick connect plugs for load bank connection.]

Disconnection of Quick Connects

  1. Ensure circuit breaker is OFF and the connectors are locked out from Source power prior to connection.
  2. Disconnect the Phase (hot) connections.
  3. Disconnect the Ground (green) connections.

Manual Operation Procedure

The SERIES 300 MTDQ and MGDQ have an external manual operating handle on the front left of the enclosure. Observe the switch position indicators - SOURCE 1, SOURCE 2 and DISCONNECTED. See Figures 5, 6, 7 and 8.

Close the transfer switch enclosure door and tighten the screws before you use the manual operating handle.

  1. Operate the manual operating handle to DISCONNECT the load or transfer to SOURCE 1 or SOURCE 2. The selected switch position is indicated with a yellow indicator window. See Figures 5, 6, 7 and 8.
  2. Provision for a padlock (not provided) allows the manual operating handle to be locked in the SOURCE 1, SOURCE 2 or DISCONNECTED position.

Operation of the Transfer Switch

Operate the transfer switch only with the enclosure door closed!

To Transfer from SOURCE 1 to DISCONNECTED:
Pull handle out. Turn handle counterclockwise until DISCONNECTED position is indicated.

[Image: Figure 5. DISCONNECTED (from SOURCE 1) position indicator showing handle pulled out and turned counterclockwise.]

To Transfer from DISCONNECTED to SOURCE 2:
Push handle in. Turn handle counter clockwise until SOURCE 2 position is indicated.

[Image: Figure 6. SOURCE 2 position indicator showing handle pushed in and turned counterclockwise.]

To Transfer from SOURCE 2 to DISCONNECTED:
Push handle in. Turn handle clockwise until DISCONNECTED position is indicated.

[Image: Figure 7. DISCONNECTED (from SOURCE 2) position indicator showing handle pushed in and turned clockwise.]

To Transfer from DISCONNECTED to SOURCE 1:
Pull handle out. Turn handle clockwise until SOURCE 1 position is indicated.

[Image: Figure 8. SOURCE 1 position indicator showing handle pulled out and turned clockwise.]

Testing & Service

Transfer Test

Operate the transfer switch monthly to ensure proper operation.

Preventive Maintenance

Reasonable care in preventive maintenance will insure high reliability and long life for the SERIES 300 MTDQ and MGDQ. An annual preventive maintenance program is recommended.

ASCO Power Services, Inc. is ASCO Power Technologies service organization for the United States and Canada. Call 1-800-800-2726 (ASCO) to request a service call and information on preventive maintenance agreements.

Annual Inspection Checklist

DANGER: Hazardous voltage capable of causing shock, burns, or death is used in this switch!

Models: 300 Series Dual Purpose Manual Transfer Switch with Integrated Quick Connects, 300 Series, Dual Purpose Manual Transfer Switch with Integrated Quick Connects, Dual Purpose Manual Transfer Switch, Purpose Manual Transfer Switch, Transfer Switch, Switch

File Info : application/pdf, 8 Pages, 1,003.77KB

PDF preview unavailable. Download the PDF instead.

files?p enDocType=User guide&p File Name=ASC-TS-UM-300MTDQ381333495 &p Doc Ref=ASC-TS-UM-300MTDQ381333495

References

Acrobat Distiller 21.0 (Windows)

Related Documents

Preview ASCO 7000 Series Three-Phase Wiring for Automatic Transfer Switches
Technical guide detailing the three-phase wiring configurations for ASCO 7000 Series Automatic Transfer and Bypass-Isolation Switches (Type 7ATB), rated for 2600-4000 Amperes. Covers connections for Normal power, Emergency power, and Load.
Preview ASCO 300 Series Transfer Switches Wiring Diagram for 600 Amperes with Group G Controls
This document provides detailed wiring diagrams and technical specifications for ASCO 300 Series Transfer Switches, specifically the J3ATS and J3NTS models rated at 600 Amperes, featuring Group G controls. It covers general information, feature descriptions, wiring for various circuits including main power, operator, normal and emergency sources, load terminals, and control signals. The document also details optional accessories like the relay expansion module (18RX), uninterruptible power supply (1UP), and load current metering (23GB), along with their wiring configurations. It includes explanations of catalog number codes, physical diagrams, and wire run listings for comprehensive installation and maintenance guidance.
Preview ASCO 7000 Series Automatic Closed Transition Transfer & Bypass-Isolation Switches Wiring Diagram
This document provides detailed wiring diagrams for ASCO 7000 Series Automatic Closed Transition Transfer & Bypass-Isolation Switches, Type J7ACTB, rated for 150-600 Amperes.
Preview ASCO SERIES 300 Manual Transfer Switch Solutions Data Sheet
ASCO SERIES 300 Manual Transfer Switching Solutions, including the 300 SERIES MTS, 300 SERIES Quick Connect Panel, and 300 SERIES MTS with Integrated Quick Connects, offer innovative and flexible solutions for temporary backup power applications, meeting NEC® 700.3(F) requirements.
Preview ASCO 7000 Series ACTS Automatic Closed-Transition Transfer Switch Operator's Manual
Operator's Manual for the ASCO 7000 Series ACTS Automatic Closed-Transition Transfer Switches (H-design, 600-1200 amps). Covers installation, testing, service, and troubleshooting procedures.
Preview ASCO Series 300 Automatic Transfer Switches Operator's Manual
Comprehensive operator's manual for ASCO Series 300 Automatic Transfer Switches (ATS), covering installation, sequence of operation, testing, service, adjustments, and control features for models ranging from 1000 to 3000 amp.
Preview ASCO 300 Series Transfer Switches Wiring Diagrams
Detailed wiring diagrams and technical information for ASCO 300 Series Single Phase Transfer Switches (D3ATS/D3NTS) with Group G Controls, covering models from 30 to 230 Amperes.
Preview ASCO 5150 Connectivity Module Installation Manual | ASCO 5100 Series
This installation manual details the ASCO 5150 Connectivity Module, a device for integrating ASCO Automatic Transfer Switches (ATS), Power Managers, and Digital Power Meters into Ethernet networks. It covers installation, configuration, and troubleshooting for seamless monitoring and control of power systems.