Installation and Safety Guide
Product Model
MODEL: CNH-EC-S721A CH/ CNH-EC-S721A MB
(Diagram showing two shower door panels, labeled "Photo for reference")
This document provides the original instructions for installation. Please read all manual instructions carefully before operating the product. VEVOR reserves the right to interpret its user manual. The appearance of the product shall be subject to the product you received. VEVOR may update technology or software without prior notice.
Safety Instructions and Precautions
⚠️ WARNING
Please read this user manual carefully!
Assembly Precautions
- Carefully check the box for any damages. If damaged, please take a photo for your record and contact the service team for assistance.
- It is dangerous if not installed correctly. Fasten all screws and nuts securely before use.
- Please assemble according to these instructions. Improper assembly can create hazards.
- Wear ANSI-approved safety goggles and heavy-duty work gloves during assembly.
- Keep the assembly area clean and well-lit.
- Please do not discard the box until after you have finished assembling the shower door.
- Do not assemble when tired or when under the influence of alcohol, drugs, or medication.
- Do not alter this product in any manner.
- The box contains some small components; please place them properly before installation to keep them away from children and ensure safety.
Installation Instructions
- Dimensional Measurement
Before installing the bathroom door, it is necessary to first measure the size of the door opening correctly. Measure the width and height of the door opening to determine the dimensions of the door leaf and frame. It should be noted that bathroom doors require more sealing than regular doors, so there may be some special size requirements. It is important to measure carefully to ensure that the door size meets the requirements.
- Door Frame Installation
When installing the door frame, pay attention to the verticality and levelness of the door frame. The verticality can be achieved by installing support blocks and adjusting the horizontal and vertical alignment. The levelness needs to be calibrated using a leveling instrument. In addition, to increase the waterproof performance of the door frame, perform sealing treatment at the bottom and side of the door frame, fill the gaps with waterproof adhesive, and install waterproof film on the inside of the door frame.
Parts List and Tools Required
Part List
Item | Description | Quantity |
1 | Wall pellet | X8 |
2 | Wall profile | X2 |
3 | Screw ST4x30 | X14 |
4 | Fixed glass | X2 |
5 | Movable glass | X1 |
6 | Handle | X2 |
7 | Door side seal | X2 |
8 | Magnetic strip | X2 |
9 | Handle screw | X2 |
10 | Aluminum strip | X1 |
11 | Bottom seal strip | X1 |
12 | Upper and lower guide rail | X2 |
13 | Bottom pulley | X2 |
14 | Top pulley | X2 |
15 | Protective rubber strip | X2 |
16 | Trim cover | X2 |
17 | Screw ST4x16 | X6 |
18 | Trim cover screw | X2 |
19 | Screw ST4x16 | X14 |
Tools Required
- Spirit level (?)
- Drill with 6mm drill bit (⚙️)
- Hammer (?)
- Screwdriver (?)
- Wrench (?)
(Diagram showing the shower door can be installed on a floor or shower plate that must be 100% balanced. The diagram shows measurements 'A' for width.)
Note: It is recommended that two people assemble the shower door. Assembly will take approximately one hour.
Installation Steps
Step 1: Install the Shower Frame
Install the shower frame. Cover the fixed glass with the protective rubber strip (15). Clamp the upper and lower guide rails (12) into the fixed assembly. Install the aluminum strip (10) on the other side. Secure the easy mounting pieces at the four corners.
(Diagrams 1a-1e illustrate attaching rubber strip, guide rails, and aluminum strip to the glass panels and frame.)
Step 2: Install Wall Profile
Place the wall profile (2) against the wall, 20-25mm from the edge of the chassis. Use a spirit level to ensure the wall profile is perpendicular to the bottom base. Mark the position of the 4 holes on the wall. Use a 6mm drill bit to drill holes at the marked positions. Insert the wall pellets (1) into the holes. Install the movable side of the wall material first; do not install the fixed side wall material first.
(Diagram shows placing wall profile, measuring 20-25mm, marking holes, drilling with 6mm bit, inserting wall pellets, and ensuring 100% level.)
Step 3: Clamp Wall Profile and Frame
Clamp the wall profile (2) into the fixed side of the frame. Tilt the whole frame into the installed wall profile. Fix the locking screw on the side wall profile.
(Diagram shows tilting the frame assembly into the wall profile and securing it.)
Ensure both sides are the same and maintain a 100% level during installation.
Step 4: Install Pulleys and Hang Movable Door
Install the upper and lower pulleys (13, 14) on the movable door (5). Hang the movable door on the guide rail (12). Adjust the upper pulley so that the movable door and the aluminum strip (10) overlap correctly after closing, leaving no gap.
(Diagrams show installation of top and bottom rollers/pulleys and adjustment for proper closure.)
Step 5: Install Door Seals and Handle
Install the door side seal (7) and magnetic strip (8) on the movable door (5). Then, install the handle (6) using the handle screws (9).
(Diagrams show attaching seals to the door edge and installing the handle.)
Step 6: Drill Holes and Install Trim Cover
Drill holes with a 3 drill bit at the positions indicated in the diagram, at least 18mm from the edge of the aluminum.
(Diagram shows drilling holes into the aluminum frame.)
Install the trim cover (16) using trim cover screws (18) and potentially other screws (16, 18).
(Diagram shows attaching trim covers.)
Note: Before applying glass glue, ensure all surfaces are clean and dry. Allow the glue to dry for 24 hours after finishing.
(Icon shows a shower head with "24H" indicating drying time.)
Contact and Representative Information
Manufacturer Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
EC REP: E-CrossStu GmbH, Mainzer Landstr.69, 60329 Frankfurt am Main.
UK REP: YH CONSULTING LIMITED. C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX