Samsung Q70A QLED 4K Smart TV Quick Setup Guide
This guide provides instructions for setting up your Samsung Q70A QLED 4K Smart TV.
Model Information
This guide covers the following models:
- 75Q7*A / 75QA7*
- 85Q7*A / 85QA7*
Dimensions and Weight
75-inch Models (75Q7*A / 75QA7*)
- Screen Size: 75 inches (189 cm)
- Dimensions (W x H x D): 66.0 x 37.8 x 1.0 inches (1677.5 x 960.7 x 26.6 mm)
- Stand Width (B): 40.4 inches (1026.8 mm)
- Stand Depth (C): 13.3 inches (338.9 mm)
- Weight: 75.2 lbs (34.1 kg) with stand, 78.0 lbs (35.4 kg) without stand
85-inch Models (85Q7*A / 85QA7*)
- Screen Size: 85 inches (214 cm)
- Dimensions (W x H x D): 74.9 x 42.8 x 1.1 inches (1901.7 x 1086.5 x 26.9 mm)
- Stand Width (B): 45.4 inches (1153.0 mm)
- Stand Depth (C): 14.5 inches (368.3 mm)
- Weight: 96.6 lbs (43.8 kg) with stand, 100.3 lbs (45.5 kg) without stand
VESA Mounting Information
Model | VESA (A x B) | Screw Size (D x 4) | Compatible Screw Length (C) |
---|---|---|---|
75Q7*A / 75QA7* | 400 x 400 mm | M8 | 11-13 mm |
85Q7*A / 85QA7* | 600 x 400 mm | M8 | 11-13 mm |
Note: '*' represents 0-9 or A-Z.
Setup Instructions
Follow these steps to set up your TV:
-
Step 1: Prepare the TV
Place the TV screen-down on a soft surface. Attach the stand components (A, B) to the TV using screws (M4 x L14).
Visual Description: The image shows the TV placed face down on a flat surface. Two stand parts are being attached to the bottom of the TV using screws. Arrows indicate the correct orientation and screw locations. A warning symbol ? indicates not to use excessive force.
-
Step 2: Attach the Stand
Align the stand parts (A, B) with the corresponding slots on the TV and secure them with screws.
Visual Description: This step details attaching the main stand components to the TV. It shows how to connect the base of the stand to the TV panel, ensuring a secure fit. Warning symbols ? are present, advising against improper handling.
-
Step 3: Stand Assembly
Connect the two parts of the stand together and attach them to the TV.
Visual Description: The image illustrates the process of assembling the TV stand. It shows connecting the base and the upright support, then attaching this assembled stand to the TV. Cautionary icons ? are shown.
-
Step 4: Wall Mounting (Optional)
If wall mounting, ensure you use the correct VESA mounting pattern and hardware. Refer to your wall mount's instructions.
Visual Description: This diagram shows the back of the TV with VESA mounting holes. It indicates the use of specific screws and spacers for wall mounting. A warning symbol ? is shown, advising to consult the wall mount manual.
-
Step 5: Connecting Devices
Connect external devices such as game consoles, soundbars, or streaming devices to the appropriate ports (HDMI, USB, OPTICAL).
Visual Description: The image displays the rear panel of the TV with various ports labeled: HDMI (eARC), USB, OPTICAL, and LAN. Cables are shown connecting to these ports. The diagram also shows how to connect the stand components (L and R) to the TV base.
-
Step 6: Power Connection
Connect the power cord to the TV and plug it into a power outlet.
Visual Description: This step shows a person holding the TV and connecting the power cord to the back of the TV and then to a wall socket. A warning symbol ? indicates to unplug the TV before moving it.
-
Step 7: Initial Setup
Turn on the TV and follow the on-screen instructions for initial setup, including language selection, network connection, and channel tuning.
Visual Description: The image shows the TV powered on, displaying a setup screen. Icons represent different setup steps like language selection, network connection, and scanning for channels.
Document Reference: BN68-12880G-02
Supported TV Sizes
- 75-inch
- 85-inch