Installation Overview
This guide details the installation process for the Honeywell Zio Lite TR40/42 LCD and non-LCD Wall Modules. It covers essential steps from pre-installation checks to final power-up, ensuring proper setup for optimal performance.
Key Installation Steps
- Before Installation: Review safety precautions and important wiring guidelines to prevent electrical interference and ensure compliance with local codes.
- Mounting: Learn how to mount the wall module on various surfaces, including standard utility conduit boxes or 60 mm wall outlet boxes.
- Wiring: Understand the wiring requirements, including recommended wire sizes and connection methods for single or multiple wires, ensuring secure and reliable connections.
- Bus Address Configuration: Learn how to set the unique bus address for each wall module on a Sylk bus, which is crucial for proper communication with the programmable controller.
- Power Up: Follow the steps for powering up the wall module and understanding the initial display screens during the configuration file loading process.
Important Considerations
Proper wiring practices are essential to avoid disruptive electrical interference. Keep wiring at least one foot away from large inductive loads. Shielded cable may be required in certain installations. Always ensure wiring complies with local electrical codes and ordinances.
For detailed information on configuring and loading the user interface, refer to the TR40/42 Wall Modules Operating Guide.
About Honeywell
Honeywell is a global leader in providing innovative automation and control solutions for various industries. Their products are designed to enhance efficiency, safety, and comfort.
For support, visit customer.honeywell.com.