User Guide for ROUGH COUNTRY models including: RZR 2014-2023 Tubular Rear Rack, RZR 2014-2023, Tubular Rear Rack, Rear Rack, Rack
prieš 12 valandų — Thank you for choosing Rough Country for all your vehicle needs. Please read instructions before beginning installation. Check the kit hardware against the ...
921931780 Polaris RZR 2014-2023 Tree Kickers 4 Seater Thank you for choosing Rough Country for all your vehicle needs. Please read instructions before beginning installation. Check the kit hardware against the kit contents shown below. Be sure you have all needed parts and know where they go. If question exist, please call us @1-800-222-7023. We will be happy to answer any questions concerning this product. Check all fasteners for proper torque. Check to ensure for adequate clearance between all components. Periodically check all hardware for tightness. KIT CONTENTS: Driver Side Tree Kicker x1 Pass Side Tree Kicker x1 TOOLS NEEDED: T40 Torx 1/4" Bit Drill Motor 14mm Socket 19mm Socket HARDWARE INCLUDED: 12mm-1.75 Hex Lock Nut x8 1/2" Flat Washer x8 L-Bolt x8 Slider Stand-off x8 3/8" U-Bolt x2 3/8" Flange Nuts x4 Cap Plug x4 Torque Specs: Size 5/16" 3/8" 7/16" 1/2" 9/16" 5/8" 3/4" Grade 5 15 ft/lbs 30 ft/lbs 45 ft/lbs 65 ft/lbs 95 ft/lbs 135ft/lbs 185ft/lbs Grade 8 20ft/lbs 35ft/lbs 60ft/lbs 90ft/lbs 130ft/lbs 175ft/lbs 280ft/lbs Size 6MM 8MM 10MM 12MM 14MM 16MM 18MM Class 8.8 5ft/lbs 18ft/lbs 32ft/lbs 55ft/lbs 85ft/lbs 130ft/lbs 170ft/lbs Class 10.9 9ft/lbs 23ft/lbs 45ft/lbs 75ft/lbs 120ft/lbs 165ft/lbs 240ft/lbs INSTALLATION INSTRUCTONS 1. Locate the (4) OE bolts in the lower body panel. See Photo 1. 2. Remove the (4) bolts using a T40 Torx Bit. See Photo 2. Photo 1 Photo 2 Locate the OE bolts in the lower body. Remove the (4) bolts using a T40 Torx Bit. 3. Drill out the threads from the (4) bolts removed. Use a drill motor and a 1/4" bit. See Photo 3. 4. Locate the threaded 90 Deg. Stud. See Photo 4. Photo 3 Photo 4 Drill out the threads. Locate the threaded 90 Deg. Stud. 5. Place the threaded 90 Deg. stud into the hole in the frame. See Photo 5. 6. Secure the threaded 90 Deg. stud using the OE hardware. Tighten each stud using a T40 Torx bit. See Photos 6 and 7. Photo 5 Photo 6 Install the threaded 90 Deg. Stud. Secure the stud using the OE hardware. 7. Install the stand-offs onto the threaded stud with the radius toward the tube. See Photo 8. Photo 7 Photo 8 Tighten the OE hardware. Install the stand-offs onto the stud. 8. Install the stand-offs onto (4) of the threaded studs. See Photo 9. 9. Place the tree kicker onto the 4 threaded studs. See Photo 10. Photo 9 Photo 10 Install the stand-offs. Install the tree kicker onto the threaded studs. 10. Secure the tree kicker using (4) 12mm-1.75 hex nuts and (4) 1/2" flat washers. See Photo 11. 11. Tighten the installed nuts using a 19mm socket. See Photo 12. Photo 11 Photo 12 Secure the tree kicker using supplied hardware. Tighten the nuts using a 19mm socket. 12. Center the mounting bracket over the cage mount, then install the 3/8" U-bolt around the cage and into the tree kicker bracket, secure the U-bolt using (2) of the supplied 3/8"-16 Flange nuts. See Photo 13. 13. Tighten the (2) 3/8"-16 Flange nuts using a 14mm socket. See Photo 14. Photo 13 Photo 14 Install the 3/8" U-Bolt and flange nuts. Tighten the nuts using a 14mm socket. By purchasing any item sold by Rough Country, LLC, the buyer expressly warrants that he/she is in compliance with all applicable, State, and Local laws and regulations regarding the purchase, ownership, and use of the item. It shall be the buyers responsibility to comply with all Federal, State and Local laws governing the sales of any items listed, illustrated or sold. The buyer expressly agrees to indemnify and hold harmless Rough Country, LLC for all claims resulting directly or indirectly from the purchase, ownership, or use of the items.Microsoft Publisher 2019