This manual details the proper installation, operation, and maintenance procedures for Trane's Odyssey Split System Air Conditioners featuring Symbio Controls. Designed for Cooling Condensers using R-454B refrigerant, these units range from 6 to 25 Tons.
It emphasizes critical safety information, including warnings regarding flammable refrigerants, high pressure, and electrical hazards. The document also addresses important environmental considerations related to refrigerant handling and outlines responsible refrigerant practices in compliance with industry standards and regulations.
Key sections cover A2L refrigerant information, detailed work procedures, leak detection, refrigerant removal and evacuation, charging, decommissioning, and application considerations. Specific guidance is provided on ignition source mitigation, minimum room area requirements, and field piping installation and charging.
For optimal performance and longevity, the manual includes comprehensive maintenance schedules, troubleshooting tips, and information on unit components and controls.
For further assistance or specific technical support, particularly regarding VFDs, Trane recommends contacting their support channels.