Schneider Electric Power-Style QED-2 Switchboards

Introduction to the QED-2 Switchboard

This document provides essential instructions for the installation, operation, and maintenance of Schneider Electric's Power-Style QED-2 Switchboards. It is designed for engineering, installation, and operating staff supervisors to familiarize themselves with the equipment's characteristics and proper handling procedures.

Key sections cover safety precautions, receiving and handling, detailed installation steps, pre-energizing checks, and ongoing maintenance. Special attention is given to safe handling practices, including the use of lifting straps and equipment, to prevent injury and damage.

For detailed information on specific components or configurations, refer to the instruction material holder included with the switchboard.

For document replacement or further assistance, contact your local Schneider Electric representative.

Safety First

DANGER: Electrical hazards, including shock, explosion, or arc flash, require strict adherence to safety protocols. Always use appropriate personal protective equipment (PPE) and follow safe electrical work practices as outlined in standards like NFPA 70E or CSA Z462. Ensure all power is turned off and verified before performing any work.

WARNING: System availability, integrity, and confidentiality are critical. Implement cybersecurity best practices, such as changing default passwords, disabling unused ports, and employing layered cyber defenses, to protect against unauthorized access and potential disruptions.

NOTICE: Practices not related to physical injury are addressed. Always follow the specific instructions provided in this manual to ensure proper operation and longevity of the equipment.

Key Features and Handling

  • Inspection and Packaging: Each switchboard section is thoroughly inspected and packaged for shipment. Verify the packing list upon receipt and inspect for any transit damage.
  • Handling: Use appropriate lifting equipment, such as overhead cranes and load-rated lifting straps, to handle switchboard sections. Ensure equipment is kept upright during handling. Refer to specific figures for correct lifting techniques.
  • Installation: Detailed instructions are provided for foundation preparation, switchboard assembly, anchoring, and various connection types, including busway and ground bus splices.
  • Maintenance: Guidelines for general inspection, cleaning, and specific maintenance tasks like bus bar joint checks and automatic transfer switch servicing are included.

Resources

For replacement parts, wiring diagrams, or instruction sheets, contact your local Schneider Electric representative. The factory order number is essential for accurate part identification.

Additional reference publications are listed within the document for further technical details.

PDF preview unavailable. Download the PDF instead.

QED-2-80043-055-14 FrameMaker 11.0.2 Acrobat Distiller 9.0.0 (Windows)

Related Documents

Preview Preventative Maintenance Guide for Schneider Electric PowerPacT Circuit Breakers with MicroLogic 5/6 Trip Units
Comprehensive instruction bulletin detailing preventative maintenance, alarm management, communication, and software configuration for Schneider Electric PowerPacT H-, J-, and L-Frame Circuit Breakers featuring MicroLogic 5 and 6 Trip Units. Essential for ensuring system reliability and performance.
Preview Motorpact™ 200/400/450 A Vacuum Contactors Instruction Bulletin
Schneider Electric's instruction bulletin for Motorpact™ 200/400/450 A vacuum contactors, covering receiving, handling, operation, maintenance, safety, and troubleshooting for medium voltage applications.
Preview Schneider Electric PowerLogic PM5350 Installation Guide
This document provides comprehensive installation instructions for the Schneider Electric PowerLogic PM5350 power meter. It details safety precautions, box contents, mounting procedures, wiring diagrams for various single-phase and three-phase systems, technical specifications, input/output connections, and communication capabilities.
Preview PowerLogic PM5500/PM5600/PM5700 Series User Manual
User manual for the PowerLogic PM5500, PM5600, and PM5700 series power meters, providing installation, configuration, and operational guidance.
Preview Schneider Electric Dry-Type Transformers: 1000V & Below Instruction Bulletin
Schneider Electric's comprehensive guide for Square D dry-type transformers (1000V and below). Covers installation, operation, maintenance, safety, handling, electrical connections, and troubleshooting for various models and enclosure types.
Preview POWERLINK G3 Controller NF2000G3 and NF3000G3 Installation and Operation Guide
This comprehensive guide provides detailed instructions for installing and operating the POWERLINK G3 Controller, models NF2000G3 and NF3000G3. Learn about system overview, safety precautions, wiring, operation, logging, and troubleshooting for your POWERLINK G3 system.
Preview Schneider Electric PowerLogic PM5500/PM5600/PM5700 User Manual
User manual for Schneider Electric's PowerLogic PM5500, PM5600, and PM5700 series power monitoring devices. This guide provides detailed instructions on installation, configuration, operation, and maintenance.
Preview FlexSeT Switchboards ERMS Operation Sequence and Installation Guide
This document provides an addendum to the Energy Reduction Maintenance Setting (ERMS) System Installation and User Guide (NHA67346). It details the operation sequence and installation procedures for the ERMS feature in FlexSeT Switchboards, including safety information, overview of operations, and specific installation instructions for the IMD version.