Module Removal and Replacement Procedures
This document provides detailed instructions for the removal and replacement of various modules within the Cisco NCS 1010 chassis. It covers essential steps for components such as controllers, power supply units (PSUs), fan filters, fan trays, and line cards.
Safety precautions are emphasized throughout, including warnings about electrical hazards and the importance of using trained personnel for installation and servicing. Procedures are outlined with clear steps, often referencing specific figures for visual guidance.
System Maintenance and Upgrades
Beyond component replacement, this guide also details critical system maintenance tasks. Users will find instructions on how to securely erase data from NCS 1010 disks using the Secure Erase feature, a crucial step for data protection, especially during Return Material Authorization (RMA) processes.
Furthermore, the document includes a section on upgrading the network configuration, specifically guiding users through the process of transitioning an NCS 1010 EDFA-only network to a Raman network. This involves prerequisites, configuration copying, and initial setup steps for the new Raman nodes.
For more detailed information on specific procedures, users can refer to sections such as 'Remove and Replace Controller', 'Remove and Replace PSU', 'Wipe Data in Disk Using Secure Erase', and 'Upgrade an NCS 1010 EDFA only Network to a Raman Network'.