Installation Instructions Walling

Wallflex®, Accolade Plus®, Natralis®, Quantum® and Armalon® NG

Please read all instructions before you begin the installation.

Quick Reference Guide

Installation:
Conform to current AS / NZS 1884 standard and these instructions.
Types of suitable wall surfaces:
Properly prepared smooth concrete render, fibre cement sheet, plasterboard, hardboard sheet, plywood and steel or aluminium sheeting.
Installation system:
Full spread hard-set adhesive.
Seams:
Heat weld or seambond.
Pattern match (reverse sheets):
No match - reverse the direction of every second run.
Adhesives (to be used to manufacturer's directions):
Use Armstrong Flooring recommended adhesives as set out in the Armstrong Flooring Recommended Adhesive guide or other reputable brand adhesives that have been tested with Armstrong Flooring/Walling products.
Trowel size:
V1 1.6mm deep x 1.6mm wide x 1.6mm apart or trowel as per adhesive manufacturers recommendation.
Special instructions:
All rolls of Armstrong Flooring products are marked with a 'batch number', and rolls are numbered in consecutive order. When using more than one roll make sure the rolls have the same 'batch number' and when used side by side in the same area are installed in roll number order. Ensure sheets are reversed at every second run. Installation is ideally suited to two installers.

To The Installer

Before cutting and installing Armstrong Flooring wall coverings, inspect the materials in a well-lit area to ensure correct product, colour, pattern and quantity (as ordered), that given areas are from the same batch, and there are no obvious transit damage, manufacturing defects, or other visual faults. Armstrong Flooring reserves the right to refuse an adjustment or claim for materials that are cut or installed where a reasonable inspection of the materials before installation would have identified the fault.

If there is a problem or doubt of any kind, then stop immediately and call Armstrong Flooring Customer Service on 1800 632 624 (AU) or 0800 449 649 (NZ).

Do not cut or install any damaged or defective material unless accepted, agreed, and approved by all parties concerned.

Job Site Preparation

Rolls should be stored upright with space between the rolls. Prior to installation, material should be allowed to relax in a flat form to acclimatise to job climatic conditions. Roll out flat and stack up to ten sheets for 24 hours at 15°C to 28°C.

Temperatures in areas to be covered should be maintained at a minimum 15°C to 28°C for 48 hours prior to, during, and after installation. Never install the material if the temperature in the room is less than 15°C as per current AS / NZ 1884. Please note that cold walls have considerable influence on delaying the open and drying times of adhesive used to install the walling.

Suitably prepare and clean (sweep/vacuum) a cutting area. Armstrong recommends the use of a vinyl dolly to roll out the walling material face up. Cut the required lengths, loosely roll up face in, and stand in the area to be installed; this will help to further condition the walling material to the area.

Wall Surface Preparation

Solid Construction Walls

(including smooth cement rendered walls and hard wall plastered surfaces)

Framed Construction

(including plasterboard, fibre cement sheet, hardboard sheet, plywood, and steel or aluminium sheeting)

Installation

Cut material to length and reverse sheets to fit (opposite edge to opposite edge), remove selvedge. Loose lay the first two lengths and before adhering, step back and inspect the overall effect. If acceptable, then proceed and install. If there is a problem or doubt of any kind, then stop immediately and call Armstrong Flooring Customer Service on 1800 632 624 (AU) or 0800 449 649 (NZ).

Ensure material is acclimatized. Warm sheets at corners using a hot air gun to end around corners. Please note a minimum corner radius of 8.00mm for all Armstrong Flooring walling materials.

If installing to a height of less than 1.5 metres, lengths should be laid horizontally as set out below:

The same method is used if installing vertically, but use a plumb line to give the first vertical starting line.

Adhesive Application

A band of approximately 100mm to 150mm of contact adhesive is applied below the horizontal line. Apply recommended hardset adhesive to the remaining area. The band of contact adhesive is to prevent the sheets from slipping down because of the weight of the walling material.

If the walling material is applied up to the ceiling height, then the band of contact adhesive should be applied at the top.

Contact adhesive is recommended at external corners. Hardset adhesive is recommended at internal corners.

When applying walling materials on the ceiling, the contact adhesive is applied to the entire surface of the ceiling.

Following adhesive manufacturer's instructions:

Wall to Floor Transition

When installing the walling material to join coved 2.0mm vinyl floor coverings, heat weld the walling and floor together to provide a smooth hygienically welded joint.

Diagram: Wall to Floor Transition - Heat welded joint

Illustrates a heat welded joint between walling and coved flooring. Features include a 20mm cove fillet, 2mm Accolade Safe, floor leveller, and concrete substrate, with a heat welded join at the top.

Diagram: Alternate - Wall vinyl to sheet vinyl – overlap

Shows an alternative transition where wall vinyl overlaps sheet vinyl. Includes 2mm Tile Trim, 20mm or 32mm cove fillet, 2mm Wallflex/Accolade Plus wall vinyl, 25mm overlap, 2mm Accolade Safe, and adhesive (SV-200 Acrylic or PU100 for moist areas).

Seam Preparation

One of the many advantages of Armstrong Flooring walling materials is the fact that it can be seam-welded to give a joinless, dust-free, watertight wall treatment. Grooving and welding should not be carried out until adhesive has completely set (usually 24 hours after sheet installation, as moisture from adhesive can interfere with the heat welding process).

Factory edges should be removed during installation.

Heat Weld Installation

Routing or grooving and heat welding must be done once adhesive has set for 24 hours. For best welding results and to reduce damage to the surface of the vinyl, use a fine air stream speed nozzle. Armstrong Flooring weld rod must be used.

Diagram: U shaped groove for heat welding

Illustrates the preparation of a seam for heat welding. Shows a "U" shaped groove with a depth of 2/3rds of the material thickness (approx. 1.2mm) and a 0.5mm gap between the two pieces at the bottom of the groove.

Diagram: Skiving excess weld rod

Depicts the process of skiving excess weld rod after cooling. It shows a two-pass method: the first pass using a trim plate or Mozart tool, and the second pass to achieve a flush finish.

Contact Information

Australia (AU):
Customer Service: customerservices@armstrongflooring.au
Phone: 1800 632 624

New Zealand (NZ):
Customer Service: customerservices@armstrongflooring.co.nz
Phone: 0800 449 649

PDF preview unavailable. Download the PDF instead.

Walling Installation Instructions Adobe PDF library 17.00 Adobe Illustrator(R) 24.0

Related Documents

Preview Armstrong Flooring Walling Installation Guide
Comprehensive installation instructions for Armstrong Flooring Walling products, including surface preparation, adhesive application, seam preparation, and heat welding techniques. Covers Wallflex, Accolade Plus, Natralis, Quantum, and Armalon NG for hygienic and durable wall finishes.
Preview Armstrong Flooring Homogeneous Vinyl Walling Sheet Cleaning and Care Instructions
Comprehensive cleaning and care instructions for Armstrong Flooring's Homogeneous Vinyl Walling Sheets, including Wallflex, Accolade Plus, Natralis, Quantum, and Armalon NG. Covers initial care, routine cleaning, stain removal, construction protection, and important warnings.
Preview Armstrong Flooring Installation Guide: Homogeneous Vinyl Sheet & Safeguard Ranges
Comprehensive installation instructions for Armstrong Flooring's Homogeneous Vinyl Sheet and Safeguard ranges, covering subfloor preparation, adhesive application, seam techniques, and post-installation care.
Preview Armstrong Flooring Homogeneous Vinyl Sheet Flooring Installation Instructions
Comprehensive installation guide for Armstrong Flooring's Homogeneous Vinyl Sheet Flooring and Safeguard® ranges, covering subfloor preparation, adhesive application, seam techniques, and post-installation care.
Preview Armstrong Flooring Installation Guide: Homogeneous Vinyl Sheet & Safeguard Ranges
Comprehensive installation instructions for Armstrong Flooring's Homogeneous Vinyl Sheet and Safeguard ranges, covering subfloor preparation, adhesive application, seam techniques, heat welding, and post-installation care.
Preview Armstrong Flooring Homogeneous Vinyl Sheet Flooring: Cleaning and Care Instructions
Comprehensive cleaning and care instructions for Armstrong Flooring's Homogeneous Vinyl Sheet Flooring lines including Accolade Plus, Infinity, Australis, Natralis, Quantum, and Armalon NG. Covers initial care, routine maintenance, protection during construction, and general warnings.
Preview Armstrong Flooring Cleaning and Care Instructions for Homogeneous Vinyl Sheet & Safeguard Ranges
Comprehensive cleaning and care instructions for Armstrong Flooring's Homogeneous Vinyl Sheet and Safeguard ranges, including initial care, routine maintenance, and protection during construction.
Preview FloorScore® Certification for Armstrong Flooring Sheet Vinyl by SCS Global Services
Certification details for Armstrong Flooring's Sheet Vinyl products, including FloorScore® and Indoor Air Quality compliance, issued by SCS Global Services.