Outsunny 845-655 Garden Planter Greenhouse
Model: IN221100388V03_GL / 845-655
Estimated Assembly Time: 1 Hour
Number of Steps: 12
Tools Recommended: [Refer to diagrams for specific tools]
Important: Retain for future reference. Read carefully.
Parts List
- Part A (Legs): 4 pieces
- Part B (Slatted Side Panels): 2 pieces
- Part C (Side Panels): 2 pieces
- Part D (Support Beams): 3 pieces
- Part E (Slats): 10 pieces
- Part E1 (Larger Slats): 2 pieces
- Part F (Top Front/Back Panel): 1 piece
- Part F1 (Top Side Panel): 1 piece
- Part G (Top Slatted Panel): 1 piece
- Part H (Top Slatted Panel): 1 piece
- Part I (Top Connecting Panel): 1 piece
- Part J (Top Slatted Panel): 1 piece
- Part K (Black Box/Planter Base): 1 piece
Hardware List
- Hardware 1 (M4*30 Screws): 8 pieces (+1 spare)
- Hardware 2 (M4*40 Screws): 24 pieces (+1 spare)
- Hardware 3 (M4*25 Screws): 13 pieces (+1 spare)
- Hardware 4 (M3*14 Screws): 4 pieces
- Hardware 5 (Pins/Dowels): 8 pieces
- Hardware 6 (M2.5*12 Screws): 4 pieces
- Hardware 7 (Connectors/Brackets): 2 pieces
- Hardware 8 (Allen Key): 1 piece
Assembly Instructions
Step 2: Attaching Side Panels to Base
Connect two pieces of Part B (slatted side panels) to the inside of two pieces of Part C (side panels). Secure them using eight (8) M4*30 screws (Hardware 1).
Step 3: Attaching Legs to Base
Attach four pieces of Part A (legs) to the bottom corners of the assembled Part C/B structure from Step 2. Use eight (8) M4*40 screws (Hardware 2).
Step 4: Attaching Remaining Legs
Attach the remaining four pieces of Part A (legs) to the other side of the structure. Use eight (8) M4*40 screws (Hardware 2).
Step 5: Installing Support Beams
Secure three pieces of Part D (support beams) horizontally between the legs (Part A). Use twelve (12) M4*25 screws (Hardware 3).
Step 6: Inserting Slats
Insert ten (10) pieces of Part E (slats) and two (2) pieces of Part E1 (larger slats) into the pre-cut grooves on the side panels (Part C) and support beams (Part D).
Step 7: Placing the Planter Box
Place the black box (Part K) onto the assembled base structure. Secure it using eight (8) pins/dowels (Hardware 5).
Step 8: Assembling the Top Frame
Assemble the top frame by connecting parts F (top front/back panel), F1 (top side panel), G (top slatted panel), and H (top slatted panel). Use eight (8) M4*40 screws (Hardware 2).
Step 9: Attaching Top Slatted Panel
Attach Part J (top slatted panel) to the top frame assembly using one (1) M4*25 screw (Hardware 3).
Step 10: Connecting Top Frame to Base
Attach the assembled top frame (from Step 9) to the main base structure. Use four (4) M3*14 screws (Hardware 4).
Step 11: Positioning Top Assembly
Place the completed top assembly onto the base structure.
Step 12: Final Securing
Secure the top assembly to the base structure using four (4) M2.5*12 screws (Hardware 6) and two (2) connectors/brackets (Hardware 7).
Customer Support
For any questions or assistance, please contact the customer care center. Details vary by region:
- US: 001-877-644-9366, customerservice@aosom.com (Imported by Aosom LLC)
- Canada: 416-792-6088, customerservice@aosom.ca (Imported by Aosom Canada Inc.)
- Germany: 0049-0(40)-87408465, service@aosom.de (MH Handel GmbH)
- Italy: 0039-0249471447, clienti@aosom.it (AOSOM Italy srl)
- Spain: 0034-931294512, atencioncliente@aosom.es (SPANISH AOSOM, S.L.)
- UK: 0044-800-240-4004, enquiries@mhstar.co.uk (MH STAR UK LTD)
- France: 0033-1-84166106, aosom@mhfrance.fr (MH FRANCE)
Please recycle packaging materials responsibly. ♻️