Franklin Deluxe LG Return
Item Number: 24807X
Dimensions: 68in x 48in (173cm x 122cm)
Brand: Franklin
Manufacturer: Franklin Sports Inc.
Address: Stoughton, MA 02072
Made In China
MLB Partnership: Major League Baseball trademarks and copyrights are used with permission of Major League Baseball. Visit MLB.com.
Note: Print front to back.
Safety Information
Customer Service Commitment
Thank you for purchasing this Franklin® product! In the event that the product you've purchased has missing or damaged parts, please contact us at:
Email: parts@franklinsports.com
Or visit our website: franklinsports.com/instructions
If possible, please include the product part number and parts description to help us assist you.
WE'RE HERE FOR YOU!
PLEASE DO NOT RETURN THIS PRODUCT TO THE STORE IT WAS PURCHASED FROM. WE ARE COMMITTED TO FULFILLING ALL REPLACEMENT PART NEEDS IMMEDIATELY.
Thank you for your continued support, and welcome to the #FranklinFamily!
Parts List
Part Number | Description | Quantity | Replacement Part # |
---|---|---|---|
1 | Left Corner Tube | x3 | 24807-R1 |
2 | Right Corner Tube | x3 | 24807-R2 |
3 | Hinge Mechanism | x2 | 24807-R3 |
4 | Toothed Bungees | x36 | 24804-R23 |
5 | Ground Stakes | x4 | 24804-R18 |
6 | Net | x1 | 24807-R5 |
7 | Strike Zone Ribbon | x1 | 24804-R16 |
8 | Locking Pins 3pc Set | x2 | 2717F1Z8 |
9 | Blocks | x4 | 24807-R7 |
10 | Support Tubes | x2 | 24807-R4 |
Assembly Instructions
General Note: Find a clean, level place to begin assembly. We recommend that two adults work together. Remove all components from the package and confirm all parts are included.
Step 1: Frame Assembly Base
Action: Place Left Corner Tube (1) into Right Corner Tube (2) ensuring Franklin logos align. Slide the Net (6) through the assembled corner tubes.
Diagram Description: Shows two corner tubes being joined, and a net being threaded through them.
Step 2: Attaching Hinge Mechanisms and Support Tubes
Action: Insert Locking Pins (8) into the Hinge Mechanism (3) to secure the hinge. Connect the Left Corner Tube (1) and Right Corner Tube (2) to the Hinge Mechanism (3). Secure one Support Tube (10) to the other Support Tube (10). Place the assembled Support Tubes (10) into both ends of the Hinge Mechanism (3) to secure the frame.
Diagram Description: Illustrates connecting corner tubes to hinge mechanisms using locking pins, and joining support tubes to the hinge mechanism.
Step 3: Completing the Frame
Action: Attach the remaining Left Corner Tubes (1) and Right Corner Tubes (2) to the Hinge Mechanisms (3). Connect these corner tubes together. Use Blocks (9) to secure the corner tubes. Repeat this process on the opposite side to complete the frame.
Diagram Description: Shows additional corner tubes being attached to hinge mechanisms, then joined together, and secured with blocks.
Step 4: Attaching Bungees and Ground Stakes
Action: To attach the Toothed Bungees (4) to the Net (6), hold the plastic ball in place and wrap the free end around the net and side tube. Loop the free bungee end around the plastic ball. Use Ground Stakes (5) for extra stability when needed.
Diagram Description: Depicts how to attach bungees to the net and tube, and shows ground stakes being used for stability.
Step 5: Attaching Strike Zone Ribbon
Action: Attach the Strike Zone Ribbon (7) to the Net (6) by weaving it as shown. The Strike Zone Ribbon (7) should be positioned in the center of the Net (6) and measure 18 net squares high by 12 net squares wide.
Diagram Description: Shows the strike zone ribbon being woven into the center of the net.
Step 6: Adjusting the Rebounder Angle
Action: To adjust the angle of the rebounder, remove the pin from the Hinge Mechanism (3) on both sides of the rebounder. Place the rebounder at the desired angle and replace the pins.
Diagram Description: Illustrates removing pins from the hinge mechanism to adjust the angle and then reinserting the pins.
YOU ARE NOW READY TO PLAY!