IKEA IVAR Shelving System
Assembly Instructions
Safety Warning
WARNING! Serious or fatal crushing injuries can occur from furniture tip over. To prevent tip over this furniture must be used with the wall attachment device(s) provided. Screw(s) and plug(s) for the wall are not included. Use screw(s) and plug(s) suitable for your walls. If you are uncertain, seek professional advice. Read and follow each step of the instruction carefully.
Assembly Steps
Step 1: Identify Components and Dimensions
Identify all components before starting assembly. This includes side panels of varying heights, shelves, screws, and dowels. The available side panel heights are 226 cm (89 1/16"), 179 cm (70 1/2"), and 124 cm (48 13/16"). Key hardware includes screws (part numbers 101324, 109049, 100823, 107967) and dowels (part number 10049370).
Visual representation: Icons for tools [hammer], [screwdriver], [wrench]. Various screws and dowels are shown with their part numbers and quantities (e.g., 6x screw 10049370, 8x screw 107967, 10x screw 100823, 4x screw 101324, 2x screw 109049).
Step 2: Attach First Side Panel to Base
Begin by attaching the first side panel to a base panel. Insert dowels (109049) into the pre-drilled holes on the base panel. Align the side panel with the dowels and secure it using screws (101324). A 'STOP' symbol [stop symbol] indicates the correct insertion point for the screw.
Visual representation: Shows a person inserting dowels and screws to connect a side panel to a base panel.
Step 3: Attach Second Side Panel and Supports
Attach the second side panel and horizontal support beams. Insert dowels into the corresponding holes on the base panel and side panels. Secure the horizontal beams to the side panels using screws (100823).
Visual representation: Shows a second side panel and horizontal bars being attached using dowels and screws.
Step 4: Secure the Structure
Secure the overall structure. This step typically involves attaching a stabilizing element, such as a back panel or cross brace, using screws (107967) to prevent racking.
Visual representation: Shows screws (107967) being used to attach a stabilizing element.
Step 5: Place Shelves
Position the shelves onto the designated supports or slots on the side panels. Ensure they are level and seated correctly.
Visual representation: Shows a shelf being placed onto the assembled frame.
Step 6: Assemble Basic Frame
This illustration depicts the assembly of the main uprights and horizontal supports to form the shelving unit's basic frame structure.
Visual representation: Shows the overall assembly of the frame.
Step 7: Install OBSERVATÖR Clips and Shelves
Install the OBSERVATÖR clips into the pre-drilled holes on the side panels at the desired shelf heights. Then, place the shelves onto these clips. The clips provide adjustable shelf positioning.
Visual representation: Shows a person inserting OBSERVATÖR clips and placing shelves onto them.
Step 8: Secure Shelves with Screws
For added stability, secure the shelves to the side panels using screws (100823). This ensures the shelves are firmly attached and do not shift.
Visual representation: Shows screws (100823) being used to fasten shelves to the side panels.
Step 9: Final Assembly and Wall Anchoring
The completed shelving unit is shown. A crucial final step involves securing the unit to the wall using the provided wall attachment devices. Important: Screws and wall plugs suitable for your specific wall type are not included and must be purchased separately. Seek professional advice if you are unsure about wall mounting.
Visual representation: Shows the fully assembled unit. An information symbol [i] highlights the importance of wall anchoring. An illustration shows the unit being secured to a wall.