ACER Monitor KA242Y Lifecycle Extension Guide

Product Overview

This document serves as the Lifecycle Extension Guide for the ACER Monitor KA242Y, providing essential information for service and maintenance.

Important Safety Notice

Product Announcement: This product is certified to meet RoHS Directive and Lead-Free production definition. Using approved critical components only is recommended when replacing defective parts. The vendor assumes no liability, express or implied, arising out of any unauthorized modification of design or replacement of non-RoHS parts. Service providers assume all liability.

Qualified Repairability: Proper service and repair are crucial for the safe, reliable operation of all product series. Service providers recommended by the vendor should be aware of the notices listed in this service manual to minimize the risk of personal injury during service procedures. Furthermore, improper repairing methods may damage equipment or products. It is recommended that service engineers possess repairing knowledge, experience, and appropriate product training for new models before performing service procedures.

NOTICE:

1. Exploded Diagram

The exploded diagram visually represents the internal components of the ACER Monitor KA242Y. It details the arrangement of parts and provides a reference list for identification.

Component List:

ItemPart No.DescriptionQty
19R1720-5003-0630MAC. SCREW-MI M3.0 6.0L, BLK-ZNNICHEAD DIAMETER 7.0)2
18R1801-0504-9010BASE (ABS 94-HB/J1341785)(KA240HY) ASS'Y1
17R1801-0506-3020BASE NECKCABS 94-HB/J1341785XKA242Y) ASS'Y1
16R1701-0426-1010NAVI KEYCABS 94-HB/J13417B5XBV247Y)1
15R1801-0209-0030REAR COVER(ABS 94-HB/BK120001XV247Y bripx)ASSY1
14R3524-0062-0156KEY BD ASS'Y (B247Y&V247Y)1
131721-0003-0850MAC. TAP. SCREW-TB #3.0×8.0L, BLK-NI3
121720-5003-0850MAC. SCREW-MI M3.0 8.0L,BLK-NI1
11R1713-0500-9050MAIN SHIELDING (SECC 0.5TXV247Y bnbx)1
10R1947-2400-0560MYLAR_BLACK(50×58 0.3T)BV2471
9R0500-0506-2180A-D PSU 1.3 A 19V ADO-25W1-B 19(x) ACER V226HQL1
8R3524-3742-0150MAIN BD ASS'Y KA242Y bnix (RTD 2513AR)ES7.01
7R0467-2808-1071WH FFC 8P(0.5mm) 740mm(3FOLD+PRO)60V(AB+A5)LF1
6R0467-2830-1831WH FFC 30P(10)640mm (4FOLD+PRO*2+ACETATE 60V G/F W/CONNAIS+BC+AL(AA) LF-OP1
51720-4003-0650MAC. SCREW-MRF M3.0 6.0L, BLK-NE7
4R1720-5003-0450MAC. SCREW-MI M3.04.0L, BLK-NI11
3LM238WF2-RSAN3LM238WF2-RSAN31
2R0335-0204-0230SPK 2W 4ohm 470/230mm (P2822KMG04E-1-9JB) VECO for R271 LF1
1R1801-0104-6010MID FRAMECABS 94-HB/BK120001XBV247Y ASSY1

Note: The information contained herein is the exclusive property of Lehui and prior written permission of Lehui is required for reproduction.

2. Wiring Connectivity Diagram

The wiring diagram illustrates the internal connections within the monitor. It shows the Key board connected to the Main Board (MB) via FFC. The LVDS cable connects the display panel (LCM) to the Main Board. The Backlight is also connected to the Main Board via FFC. The Power Board connects to the Main Board via a wire.

3. Mechanical Instruction

Tools Required

The following tools are typically used for disassembly to a point where components and materials requiring selective treatment can be removed:

4. Assembly and Disassembly Procedures

Disassembly Procedure

Step 1: Pull the base and neck assembly out.

Step 2: Unscrew four screws.

Step 3: Separate hooks between the MID_FRAME and Rear Cover (R/C).

Step 4: Pull up the Rear Cover and disconnect all connectors.

Step 5: Unscrew screws on the main shielding and disassemble the aluminum tape.

Step 6: Separate the speaker from the MID_FRAME and disconnect the LVDS & Backlight FFC from the LCM (Liquid Crystal Module).

Step 7: Unscrew two hex nuts and seven screws to remove the main board PCBA from the main shielding.

Step 8: Remove connector cables and separate the main board and power board. Separate mylar and shielding.

Step 9: Unscrew eleven screws and separate the MID FRAME and LCM.

Step 10: Separate the gasket and lens from the MID frame.

Step 11: Unscrew two screws and disassemble the key board from the rear cover. Separate the navigation key (navi key) and cable.

Step 12: Separate the wall-mount bracket (BKT) and display key from the rear cover.

Step 13: Unscrew the screw and separate the base & neck assembly.

Step 14: Remove six silicon rubbers and unscrew one screw.

Step 15: Unscrew two screws and Separate BKT from neck, unscrew three screws and separate hinge assy from neck.

Assembly Procedure

Step 1: Assemble the main board into the shielding, using screws to fix it. Mount the main board onto the LCM.

Step 2: Insert the 30-pin LVDS FFC to the LCM, then use acetate cloth tape to secure the FFC.

Step 3: Secure the shielding onto the panel with screws (indicated by red circles in the original image).

Step 4: Use aluminum (Al) tape to fix the shielding (indicated by blue circles in the original image).

Step 5: Insert the 6-pin backlight FFC to the panel and main board. Use acetate tape to secure it (indicated by red circles in the original image).

Step 6: Insert the 30-pin LVDS FFC to the main board. Use aluminum (Al) tape to fix it (indicated by blue circles in the original image).

Step 7: Apply yellow tape to secure the FFC (indicated by red circles in the original image).

Step 8: Assemble the middle frame with the LCM and fix it with screws (indicated by red circles in the original image).

Step 9: Secure the middle frame screws (indicated by red circles in the original image).

Step 10: For models with speakers, assemble the speaker onto the middle frame and connect the speaker cable to the main board. The red and white cable is on the left side, and the yellow and black cable is on the right side.

Step 11: Secure the speaker cable with acetate cloth tape (indicated by blue circles in the original image).

Step 12: Insert the key board FFC onto the main board. Note: 'other sku' and 'bi/bir' might refer to different versions or connector types.

Step 13: Assemble the rear cover and push around the edges to ensure a secure fit.

Step 14: Secure the rear cover with screws (indicated by red circles in the original image).

5. Troubleshooting

5.1 Test flow for abnormal machine:

This flowchart guides troubleshooting for abnormal machine behavior. The original document uses a visual flowchart; this text describes the decision paths.

5.2 Key debug flow:

5.3 Panel debug flow:

5.4 LED backlight debug flow:

Note: The flowcharts represent decision paths. 'Check U12 works' appears as a common fallback for several issues. 'Replace BU5' is also a potential action.

6. FRU (Field Replaceable Unit) List

The following table lists Field Replaceable Units (FRUs) for the ACER Monitor KA242Y.

SPL_CategoryAcer PNRaken PNODM Description
INVERTER / Power BD55.TJ2M5.003R050005062181A-D PSU 1.32 A 19V ADO-25W1-B 19(w/o SW)(120x80mmx1.6t_DC4P)_IEC62368
BOARD55.TJ2M5.001R352437520150MAIN BD ASS'Y KA242Y bi (RTD 2313AR)ES7.0
BOARD55.TFKM5.004R352400620156KEY BD ASS'Y (B247Y&V247Y)
CABLE50.TFKM5.001R046611040030WH KY-2501HS01-04/KY-2501HS01-04 #24 100mm W/B LF
CABLE50.TFKM5.002R046630060330WH KY-1251HS01-06/KY-1025HL-06 #28 450mm W/B LF
CABLE50.TFKM5.004R046728081081WH FFC 8P(0.5mm) 750mm(3FOLD)60V(A8+A5)LF
CABLE50.TFKM5.005R046728301851WH FFC 30P(1.0mm)660mm (4FOLD+PRO*2+ACETATE)60V G/F W/CONN. (A15+BC)+AL(AA) LF-OP
FAN SINK/SPEAK/EARPHONE/ RTC23.T6LM5.001R033502040230SPK 2W 4ohm 470/230mm (P2822KMG04E-1-9JB) VECO for R271 LF
LCDKL.23802.010R352400520395LM238WF2-RSAN3 Acer
Models: KA242Y, 23.8 Inch Full HD VA Monitor, Full HD VA Monitor, 23.8 Inch VA Monitor, VA Monitor, Monitor, KA242Y VA Monitor

PDF preview unavailable. Download the PDF instead.

Lifecycle Ext. Guide Acer 1.0 A A ?acerid=637945853760139246 Microsoft Word 2016 Microsoft Word 2016

Related Documents

Preview Acer CB272 Monitor Lifecycle Extension Guide
This guide provides detailed information on the lifecycle extension of the Acer CB272 monitor, including exploded diagrams, wiring connectivity, mechanical instructions, disassembly and assembly procedures, troubleshooting, and a Field Replaceable Unit (FRU) list.
Preview Acer SA240Y Lifecycle Extension Guide
This guide provides detailed instructions for the lifecycle extension of the Acer SA240Y monitor, including disassembly, assembly, and troubleshooting procedures.
Preview Acer VG240Y Lifecycle Extension Guide: Service and Repair Manual
Comprehensive guide for servicing and repairing the Acer VG240Y monitor, including exploded diagrams, assembly/disassembly procedures, troubleshooting steps, and a list of field-replaceable units (FRUs).
Preview Acer K222HQL Lifecycle Extension Guide: Service and Repair
Official service manual for the Acer K222HQL monitor, providing detailed instructions for disassembly, assembly, troubleshooting, and identifying field-replaceable units (FRUs) to extend product life.
Preview Acer SA220Q Lifecycle Extension Guide
This guide provides detailed instructions for the lifecycle extension of the Acer SA220Q monitor, including disassembly, assembly, and troubleshooting procedures.
Preview Acer XZ271U X3 / ED271U X3 Monitor Lifecycle Extension Guide
This guide provides detailed instructions and information for the lifecycle extension of Acer monitor models XZ271U X3 and ED271U X3, including exploded diagrams, disassembly procedures, troubleshooting, and a list of field-replaceable units (FRUs).
Preview Acer Monitor V227Q Lifecycle Extension Guide
Detailed lifecycle extension guide for the Acer Monitor V227Q, covering safety notices, exploded diagrams, wiring, disassembly/assembly procedures, troubleshooting, and FRU lists.
Preview Acer V226HQL Lifecycle Extension Guide
This guide provides detailed information on the lifecycle extension and service procedures for the Acer V226HQL monitor, including exploded diagrams, wiring instructions, disassembly and assembly steps, troubleshooting, and a list of Field Replaceable Units (FRUs).