Geberit Installation Manual
MONTAGEANLEITUNG | INSTRUCTIONS DE MONTAGE | ISTRUZIONI PER IL MONTAGGIO
Step 1: Preparation and Tools
Ensure you have the necessary tools and components. The diagram shows a wrench and a numbered component '1'.
A visual indicator shows a measurement scale, suggesting precision is required.
Diagram shows a toilet outline with arrows indicating alignment points.
Step 2: Mounting Bracket Installation
The diagram illustrates attaching mounting brackets to the wall. It indicates a measurement of 'A + 20 mm' for positioning.
Two connection types are shown: one with a checkmark (✓) indicating correct, and one with a cross (✗) indicating incorrect.
Step 3: Water Connection and Flushing Mechanism
Diagrams show the connection of water supply hoses. Similar to Step 2, correct (✓) and incorrect (✗) connection methods are depicted.
Step 4: Securing the Toilet Bowl
This step involves using an 8 mm tool to secure the toilet bowl. A diagram shows the tool being inserted into a mounting point.
Step 5: Final Adjustments and Sealing
The diagram shows the toilet bowl mounted to the wall. It illustrates the process of sealing the unit, with a gap of 5 mm indicated.
Correct (✓) and incorrect (✗) sealing methods are shown.
Step 6: Final Check
A diagram shows the fully installed toilet. It includes a 5 mm measurement, likely for final gap verification.
Correct (✓) and incorrect (✗) final installations are depicted, showing the positioning of support arms.
Step 7: Curing Time
A diagram indicates a 24-hour curing time after installation, with a clock symbol and '24 h'.
The diagram shows the toilet being sealed around its base.