ICEZONE INSTALLATION

for Hoshizaki Cuber Ice Machines

Standard Top-Mount Installation

This module will show the steps to install ICEZONE on Hoshizaki single evaporator cuber Ice Machines. Please read the entire document prior to installation.

Caution: Installation should be done by a qualified technician using appropriate safety equipment and procedures.

Pre-Installation Requirements

Clean and Sanitize Ice Machine Prior to Installation

Before installing ICEZONE, clean the interior of the ice machine thoroughly according to the manufacturer's guidelines. All surfaces should be free of slime and scale before starting the installation.

Recommended Tools

Before installing ICEZONE, clean the interior of the ice machine thoroughly according to the manufacturer's guidelines. All surfaces should be free of slime and scale before starting the installation.

Single Machine Installation

1. Preparation

1. Before working on the ice machine, the ice in the bin must be removed. Turn the ice machine power switch to the "off" position and disconnect power from the ice machine following facility appropriate lock-out / tag-out procedures.

2. Mark the location for the ICEZONE supply fitting. This is the fitting where the plasma will enter the ice machine. This should be between the evaporators and should deliver plasma near the top of the ice production volume. The first step is to locate the hole on the stainless steel cover. The insulated cover can be removed to make this location easier to find.

2. Drilling and Fitting Installation

3. Transfer the location for the ICEZONE supply fitting to the insulated top cover by following these steps:

  1. Place the stainless steel cover on top of the ice machine so it is seated in the normal operating position.
  2. Mark the hole location in the insulated cover by marking with a pen through the hole in the stainless steel cover.

4. Drill the hole for the ICEZONE supply fitting in the insulated top cover at the mark transferred from the stainless steel cover.

5. Assemble the supply fitting as shown. This includes a double ended barb fitting, low profile nut and white rubber washer.

6. Install the supply fitting as shown. This includes a second low profile nut and white rubber washer. There should be no exposed threads on the interior surface of the lid per NSF guidelines.

7. Install the "T" fitting on the supply fitting as shown.

3. Return Fitting Installation

8. Mark the location for the ICEZONE return fitting. This is the fitting where the plasma will return to the ICEZONE. This is typically located on the top of the ice bin (for multiple unit installations) or in the bottom of the ice machine (for single unit installations).

9. Drill the hole(s) as marked. The final hole diameter should be 1.0" for each fitting.

10. Clean the burrs from the hole edges and prepare to install the fittings. This picture shows the de-burred hole with fitting inserted. (the fitting installation will be shown in the coming steps).

11. Assemble the return fitting as shown. This includes a single ended barb fitting, low profile nut and white rubber washer.

12. Install the return fitting as shown. This includes a second low profile nut and white rubber washer. There should be no exposed threads on the interior surface of the lid per NSF guidelines.

13. In single machine installations, the return tubing will run from the bottom of the machine through the stainless steel lid and to the ICEZONE. A grommet is installed in the cover to allow the tubing to pass through.

14. For single machine installations, the top side of the lid should be completed as shown. Ensure the fitting nuts are tight and prepare to mount the ICEZONE unit.

4. ICEZONE Unit Mounting

15. Remove the service cover from the ICEZONE unit. This provides access to the lamp, power input and mounting boss. As the screw is removed from the cover, be sure to keep it with the cover so it is available for re-assembly.

16. Remove the Input/Output cover from the ICEZONE unit. This provides access to additional mounting bosses. As the screw is removed from the cover, be sure to keep it with the cover so it is available for re-assembly. The cover requires a firm pull while rotating towards the top for removal.

17. Place the ICEZONE Unit on the lid and layout the routing of the supply and return tubing. The ICEZONE Unit should be placed in the back right corner of the cover (looking at the front of the ice machine). Place the 90 degree hose Barbs in place to visualize the routing. Observe the flow direction arrows on the ICEZONE Unit.

18. Mark the holes to mount the ICEZONE Unit on the lid. Use a pen to locate the three mounting holes.

19. Drill the holes to mount the ICEZONE Unit on the lid. Drill three 1/8" holes.

20. Place the mounting rivets or self drilling screws into the mounting holes.

21. Re-attach the Input/Output cover and secure with the original screw.

5. Tubing and Connections

22. Cut two 2.5 inch pieces of tubing to connect the supply and return fittings to the 90 degree hose barbs.

23. Assemble the supply and return fittings to the 90 degree hose barbs using the 2.5 inch pieces of tubing.

Installer's Tip: Heating the tubing in hot water eases the installation of the tubing onto the fittings.

24. Cut and assemble the remaining supply and return tubing and fittings. Place the handy clamps (black) on the tubing which is placed over the ports on the ICEZONE Unit.

Installer's Tip: Heating the tubing in hot water eases the installation of the tubing onto the fittings.

25. Tighten the handy clamps with a pliers to secure the tubing on the ICEZONE Unit.

26. Insert the DC plug from the wall adapter through the "P" shaped hole in the service cover. Plug the DC connector into the ICEZONE Unit's power input plug.

27. Reinstall the service cover and secure with the original screw.

6. Final Checks

28. The completed installation on the cover should look like the picture shown.

29. The completed installation on the ice machine should look like the pictures shown. The supply fitting is located between the curtains and the return fitting is located at the floor of the ice machine.

Bulb Indicators

Blue:
Operation Normal
When ICEZONE is connected to power correctly and the operation is normal, a blue light shows on top of the unit.
Red:
Replace Bulb
When the red light is steady on top of the ICEZONE, the lamp needs to be changed.
Flashing Red:
Service Required
When the red light is flashing on top of the ICEZONE, the unit requires service.
Models: Hoshizaki Cuber Ice Machines, Cuber Ice Machines, Ice Machines, Hoshizaki

File Info : application/pdf, 9 Pages, 8.17MB

PDF preview unavailable. Download the PDF instead.

100810-Hoshizaki-Installation-Guide-FINAL-INT

References

Adobe PDF Library 17.0 Adobe InDesign 18.0 (Macintosh)

Related Documents

Preview BSG ICEZONE Installation and Maintenance for Follett Ice Bins
Comprehensive installation and maintenance guide for the BSG ICEZONE UV-C disinfection system designed for Follett Ice Bins, model SG1650. Includes specifications, safety instructions, troubleshooting, and bulb replacement procedures.
Preview ICEZONE Installation Guide for Scotsman Prodigy Cubers
Comprehensive installation guide for the BSG ICEZONE UV water purification system, designed for Scotsman Prodigy Cube ice machines. Covers pre-installation checks, required tools, and step-by-step installation procedures, including detailed textual descriptions of diagrams.
Preview Smart Life APP User Manual for BSG Heat Pump Systems
Comprehensive guide to the Smart Life mobile application for controlling BSG heat pump systems. Covers app download, installation, account setup, network configuration, device pairing, and detailed usage of features like ON/OFF, modes, and temperature control.
Preview San Antonio Smart Home Buyer's Guide 2025 Edition
A comprehensive guide for San Antonio homeowners on transforming their residences into smart homes, covering security, climate control, automation, appliances, and starter packages from BSG.