Sungrow AC011E-01 AC Charger Quick Installation Guide

Quick Installation Guide

AC Charger AC011E-01

Model: AC011E-01

Manufacturer: Sungrow Power Supply Co., Ltd.

Website: www.sungrowpower.com

Important Information

The contents of this document are subject to periodic updates. This guide is intended to supplement, not replace, the user manual and product safety instructions. Always read the user manual and relevant standards before operation. Professional personnel trained in electrical systems and safety regulations should perform all operations.

Before installation, verify that all components are present and undamaged. Contact the shipping company or Sungrow immediately in case of damage or missing items. Ensure cables are intact and well-insulated, using appropriate tools and personal protective equipment.

Safety Statement

⚡ DANGER

High voltages are present during operation, posing a risk of electrical shock, severe injury, or death. Non-professional personnel must not disassemble the components.

⚠️ CAUTION

Keep the charger away from flammable and explosive substances. Store in a dry, clean, well-ventilated area, free from harmful gases. Avoid storing near corrosive objects.

ℹ️ NOTICE

  • During transport, the charger must be securely packed, marked with the loading direction, and not stored upside down.
  • Secure the equipment to prevent violent shaking and damage during transport.
  • Upon arrival, inspect for transport damage and contact the shipping company if necessary.
  • Verify that all delivered devices match the delivery list.

Scope of Delivery

The package typically includes:

  • Charger × 1 [Image: The main AC charger unit]
  • Socket-out × 1 [Image: The charging socket with a cable]
  • Backplate × 1 [Image: A flat mounting plate]
  • Upper hanging plate × 1 [Image: A plate with mounting slots/hooks]
  • Lower hanging plate × 2 [Image: Plates with mounting slots/hooks]
  • Pile accessories × 1 (optional) [Image: Optional components for pole mounting]
  • Screw for plates × 4 [Image: Standard screws]
  • Combination screw × 11 (for pile-mounted) [Image: Specialized screws for pole mounting]
  • L-shaped wrench × 1 [Image: An L-shaped tool]

Tools Required

The following tools are recommended for installation:

  • Marker [Image: A marking pen]
  • Wire stripper [Image: Tool for stripping wire insulation]
  • Cable drilling tool (Φ6/Φ12) [Image: Drill bit for making holes of 6mm or 12mm diameter]
  • Cross screwdriver [Image: Phillips head screwdriver]
  • Heat gun [Image: Tool for applying heat]
  • Crystal crimping pliers [Image: Pliers for attaching terminals]
  • Hydraulic clamp (2.5-6mm²) [Image: Hydraulic tool for crimping terminals, suitable for 2.5-6mm² wire]
  • Adjustable spanner [Image: Adjustable wrench]

Mounting Place Requirements

Ensure the installation location meets the following conditions:

  • Ambient temperature: -30°C to 50°C
  • Relative humidity: ≤ 95%
  • Sufficient cooling space around the unit.
  • Avoid direct sunlight and flammable/explosive environments.

Diagrams illustrate correct and incorrect mounting orientations and placements, emphasizing ventilation and protection from environmental factors.

Dimensions and Weight

Name Dimensions (H x W x D) Weight
AC011E-01 310mm x 205mm x 92.4mm 3.8kg (with plugs)

Cable Connection

Note: Cable connection must be performed before charger installation. Recommended cable cross-section: 2.5mm².

  1. Remove the back cover of the charger. [Illustration: Screwdriver removing charger back cover]
  2. Thread the power cable through the designated opening. [Illustration: Cable being fed into the charger housing]
  3. Crimp the terminals onto the cable wires. Use appropriate torque: M3 terminals at 0.5±0.1 N·m, M5 terminals at 3±0.2 N·m. [Illustration: Crimping tool attaching terminals to wires, with torque specifications]
  4. Connect the prepared cable wires to the corresponding terminals inside the charger. [Illustration: Wires connected to internal terminals]
  5. Install the back cover securely. [Illustration: Back cover being reattached]

Wall-mounted Charger Installation

Preparation: Before drilling, check for hidden water or electrical wiring in the wall. Use a 6mm drill bit with a drilling depth of approximately 45mm. The wall mounting surface must support at least 4.5 times the charger's weight.

  1. Install the backplate onto the wall using tapping screws. [Illustration: Backplate being screwed to a wall]
  2. Install the socket-out. It is recommended to place it approximately 20cm to the right and below the charger. Site conditions may dictate the final placement. [Illustration: Socket-out mounted on the wall]
  3. Mount the charger onto the installed backplate using M4 screws, applying a torque of 1.2±0.1 N·m. [Illustration: Charger being attached to the backplate]

A diagram shows the final wall-mounted installation effect.

Pile-mounted Charger Installation (Optional)

Preparation: Use a 12mm drill bit with a drilling depth of approximately 85mm for pole mounting.

  1. Perform AC line installation on the pile. [Illustration: AC line connection on a pole]
  2. Install the charger components onto the pile after threading. [Illustration: Components being attached to a pole]
  3. Install the backplate and the socket-out onto the pile using M4 screws (torque 1.2±0.1 N·m). [Illustration: Backplate and socket-out mounted on a pole]
  4. Install the upper and lower hanging plates, then attach the charger to these plates. [Illustration: Charger mounted using hanging plates on a pole]

A diagram illustrates the final pile-mounted installation effect.

Inspection Before Commissioning

No. Item Judgment
Yes No
1 The installation place is convenient for operation and maintenance.
2 The charger is installed securely.
3 With sufficient cooling space.
4 Cable is connected correctly and firmly.
5 Cables are routed safely and protected against mechanical damage.

Commissioning

  1. Confirm that all inspected items meet the requirements before commissioning.
  2. Close the cable inlet leakage protection circuit breaker.
  3. Power on the charger. Allow approximately one minute for the power-on self-test.
  4. After the self-test, observe the status of the indicators.

LED Indicator Status

Charger Status Indicator Description
Standby Blue indicator flashes slowly: on for 1s and off for 4s; circulating.
Charging (S2 is closed and current is normal) Blue indicator breathes: on for 1s and off for 1s; circulating.
Charging stops Blue indicator is steady on.
Detecting plug Blue indicator flashes quickly: on for 0.5s and off for 0.5s; circulating.
Ground cable and live cable connected reversely Red indicator is steady on.
Power-on self-test Blue indicator is on for 1s and red indicator is on for 1s.
Charger software upgrading Blue indicator flashes quickly.
Models: AC011E-01 AC Charger, AC011E-01, AC Charger, Charger

File Info : application/pdf, 8 Pages, 5.57MB

PDF preview unavailable. Download the PDF instead.

AC011E-01-QIEN-Ver11-20220401

References

Adobe PDF library 15.00 Adobe Illustrator(R) 17.0

Related Documents

Preview Sungrow AC Charger User Manual: AC007UK-01 & AC007UK-01 L1
User manual for Sungrow AC007UK-01 and AC007UK-01 L1 electric vehicle chargers. Covers installation, operation, safety, app control, and troubleshooting for efficient EV charging.
Preview Sungrow 11kW EV Charger AC011E-01 Technical Specifications
Technical specifications for the Sungrow 11kW EV Charger, model AC011E-01, including rated voltage, current, frequency, power, operating temperature, and IP rating.
Preview Sungrow Market Certification Overview: Global Product Compliance Status
This document details Sungrow's market certifications for solar inverters, battery storage, EV chargers, and optimizers across various countries. Essential compliance data for renewable energy installations.
Preview Sungrow AC Wallbox AC011E-01 Schnelleinstieg im SHxxRT-System
Anleitung zur schnellen Inbetriebnahme und Konfiguration der Sungrow AC-Wallbox AC011E-01 im SHxxRT-System. Erfahren Sie, wie Sie das System verbinden, einrichten und über die iSolarCloud-App steuern, inklusive Lade-Modi und Systemintegration.
Preview SUNGROW EV Charger: Web Connection and Setup Guide
Comprehensive guide to connecting your SUNGROW EV charger wirelessly, configuring network settings, managing charging modes (Network, Plug & Charge, EMS), and performing factory resets. Includes essential notices for successful setup.
Preview Sungrow SG30/50/110CX Inverters Commissioning Quick Guide
This guide provides instructions for commissioning Sungrow SG30/50/110CX three-phase inverters using Logger1000 and EyeM4 devices. It covers RS485 connections, web portal setup, internet connectivity, and iSolarCloud integration for monitoring and control.
Preview Sungrow SG30/50/110CX Inverters Commissioning Quick Guide with Logger1000 and EyeM4
This guide provides step-by-step instructions for commissioning Sungrow SG30/50/110CX three-phase inverters. It covers RS485 connections, energy meter integration (DTSD1352, DTSU666), Logger1000 and EyeM4 setup, web portal access, internet connectivity (Ethernet, WiFi, 4G), remote control configuration, export control, and iSolarCloud plant creation and firmware updates.
Preview Sungrow iSolarCloud Commissioning Guide for Solar Installers
A comprehensive guide for solar installers on commissioning solar plants using the Sungrow iSolarCloud system, including setup procedures, troubleshooting tips, and monitoring features.