GoodWe SDT Series Photovoltaic Grid-tied Inverter
Model Numbers: GW15K-SDT-CN-G40, GW17K-SDT-CN-G40, GW20K-SDT-CN-G40, GW23K-SDT-CN-G40, GW25K-SDT-CN-G40, GW25K-SDT-CN-G41, GW30K-SDT-CN-G40, GW33K-SDT-CN-G40
Version: V1.4-2025-08-15
Quick Installation Guide
Installation Wiring Flow
Installation
Mounting: Mount the inverter on a wall. Ensure minimum clearances: 300mm (top/bottom), 600mm (sides), 500mm (front). Inverter dimensions: 530mm (Height) x 413mm (Width) x 211mm (Depth). Weight: 19kg. Maximum tilt angle: 15°.
DC Input (MPPT) Connections: Connect PV strings to the DC input terminals. Recommended PV string connection: Single string per MPPT or two strings per MPPT. MPPT3 is available for specific models: GW25K-SDT-CN-G41, GW30K-SDT-CN-G40, GW33K-SDT-CN-G40. Maximum DC voltage: 1100V. Recommended DC cable size: Copper (Cu), 4-6mm².
AC Output Connections: Connect AC output terminals (L1/L2/L3, N/PE). For Copper (Cu) cables: L1/L2/L3 require 16-25mm²; N/PE require 16-25mm². Stripping length for L1/L2/L3: 45-50mm. Stripping length for N/PE: 75-80mm. For Aluminum (Al) cables: L1/L2/L3 require 25-35mm²; N/PE require 25-35mm². Stripping length for L1/L2/L3: 45-50mm. Stripping length for N/PE: 75-80mm.
Grounding Connection: Connect the PE terminal to the grounding system. Recommended grounding cable size: Copper (Cu), 10mm² or Aluminum (Al), 16-25mm². Stripping length for Cu: 65-70mm. Stripping length for Al: 4.4-7mm.
Communication Ports: Connect communication cables to the designated ports. Torque specifications for terminals: M5 C1.2-2N·m, M6 C2-3N·m, M4 C0.5-0.8N·m.
Important Notes
- This document is for guidance only and may be updated without notice. It does not replace the product label or user manual unless otherwise agreed.
- All operations must be performed by qualified electrical technicians familiar with local standards and safety regulations.
- GoodWe Technologies Co., Ltd. is not responsible for damage or injury caused by improper installation or use.
Company Information
GoodWe Technologies Co., Ltd. Address: No. 90 Zijin Road, Suzhou High-tech Zone, China. Phone: 400-998-1212. Website: www.goodwe.com. Email: service@goodwe.com.
Communication Connection Types
Type A: Protocol Converter
Connect the protocol converter to the COM port. Use shielded twisted pair cable suitable for outdoor use and meeting local standards. Torque: M2 C0.2-0.3N·m.
Type B: Protocol Converter + Meter
Connect the protocol converter and meter to the COM port. Use shielded twisted pair cable suitable for outdoor use and meeting local standards. Torque: M2 C0.2-0.3N·m.
Type C: Parallel Connection + Data Logger (EzLogger3000C/SEC3000)
Connect multiple inverters (up to 20) in parallel using a protocol converter and data logger. Configure DIP switches for master/slave communication. RS485 wiring: Connect RS485_A1 to A1 and RS485_B1 to B1 for inverter 1, and similarly for subsequent inverters. Connect meter to COM port. Use shielded twisted pair cable. Torque: M3 C0.7-0.9N·m.
DIP Switch Settings
Single unit operation: Set DIP switches to OFF. Parallel operation: Set the first inverter's switches to ON and subsequent inverters' switches to OFF.
Monitoring Options
Monitoring is available via the SolarGo App, Xiaogu YunChuang App, or Xiaogu YunChuang Web.
Inverter MPPT Count
Inverters GW25K-SDT-CN-G41, GW30K-SDT-CN-G40, GW33K-SDT-CN-G40 are equipped with 3 MPPTs. Other models are equipped with 2 MPPTs.
LED Indicators
Indicator | Status | Description |
---|---|---|
Power | Long solid: powered on Off: not powered | |
Grid | Long solid: normal grid, successful grid connection Off: not grid-connected Single slow flash: pre-grid self-check Single fast flash: about to grid-connect | |
Wireless | Long solid: wireless monitoring normal Single flash: wireless module reset/reboot Two flashes: no base station or router connection Four flashes: no server connection Flashing: RS485 communication normal Off: wireless module restoring factory settings | |
System Fault | Long solid: system fault Off: no fault |