Outsunny 845-011 Greenhouse
Model: IN221001902V01_GL
Tools Recommended: 120 MIN
Important Information
Important: Retain for future reference. Read carefully.
We will not exchange or pay for damages caused by weather and climate conditions. Our greenhouse has better wind resistance, which is due to the extra buried tarpaulin, but it does not mean that the greenhouse withstands medium and strong winds. It is therefore strongly recommended to remove the cover under wind. Otherwise, it is also advisable to bury the metal structure in the ground or reinforce the ground support.
Parts List
Parts
Part No. | Description | Quantity |
---|---|---|
1 | Straight tube | x10 |
2 | Curved tube | x10 |
3 | Straight tube | x10 |
4 | Straight tube | x5 |
5 | Straight tube | x10 |
6 | Straight tube | x5 |
7 | Straight tube with connector | x2 |
8 | Straight tube with connector | x2 |
9 | Angled tube | x5 |
10 | Straight tube | x2 |
11 | Straight tube | x2 |
12 | Straight tube | x2 |
Hardware
Hardware ID | Description | Quantity |
---|---|---|
A | Cap / End piece | x10 (+1 spare) |
B | Allen Wrench | x4 (+1 spare) |
C | Spring clip | x4 (+1 spare) |
D | Ground stake / Peg | x1 |
H | Bolt M6*45 | x25 (+1 spare) |
H1 | Bolt M6*25 | x2 |
K | Nut M6*25 | x27 (+1 spare) |
Assembly Instructions
Step 01: Base Frame Assembly
Connect two Part 2 (curved tubes) to a Part 1 (straight tube) using Hardware A and Hardware K. Repeat this to form multiple arch sections. Connect Part 3 (straight tubes) to the ends of the Part 2 tubes.
Step 02: Connecting Arches
Join the assembled arch sections using Part 1, Part 2, Part 3, Part 5, Part 6, Part 10, Part 11, and Part 12 straight tubes. Use Hardware H and Hardware K to secure these connections. Part 7 and Part 8 may be used as central connectors or supports.
Step 03: Adding Cross Supports
Insert Part 9 (angled tubes) and Part 4 (straight tubes) as cross supports between the main arches. Secure these using Hardware H and Hardware K. Ensure the structure is stable.
Step 04: Further Reinforcement
Continue adding remaining Part 1, Part 2, Part 3, Part 4, Part 5, and Part 10 tubes as cross supports to reinforce the entire frame. Use Hardware H and Hardware K for all connections.
Step 05: Final Frame Check
Ensure all tubes are correctly connected and secured with Hardware H and Hardware K. Attach Part A (caps/end pieces) to any exposed tube ends if applicable.
Step 06: Attaching the Cover
Carefully unfold and place the greenhouse cover over the assembled frame. Ensure it is centered and covers the structure evenly. Use Part C (spring clips) to secure the cover to the frame at various points. Use Part D (ground stake) to anchor the greenhouse to the ground.
Step 07: Securing the Greenhouse
Press the soil firmly onto the edges of the greenhouse cover where it meets the ground. This helps to seal the greenhouse and provide additional stability against wind. The dimensions of the greenhouse are approximately 3m x 6m.
Importer Information
United States (US)
Imported by Aosom LLC, 27150 SW Kinsman Rd Wilsonville, OR 97070 USA. Made in China.
Canada (CA)
Imported by Aosom Canada Inc., 1251 Tapscott Road, Unit 101, Scarborough, Ontario Canada M1X 1S9. Made in China.
United Kingdom (EN)
Importer Address: MH STAR UK LTD, Unit 27, Perivale Park, Horsenden lane South, Perivale, UB6 7RH. Made in China.
France (FR)
Adresse d'importation: MH FRANCE, 2 Rue Maurice Hartmann, 92130 Issy Les Moulineaux, France. Fabriqué en Chine.
Spain (ES)
Importador: SPANISH AOSOM, S.L., C/ROC GROS,N°15.08550, ELS HOSTALETS DE BALENYÀ, SPAIN. WWW.AOSOM.ES, ATENCIONCLIENTE@AOSOM.ES, TEL: 931294512. Hecho en China.
Portugal (PT)
SPANISH AOSOM, S.L., C.ROC GROS N.15, 08550. ELS HOSTALETS DE BALENYÀ. TEL: 931294512 (SEG-SEX DAS 7:30H ÀS 16:30H). INFO@AOSOM.PT, WWW.AOSOM.PT.
Germany (DE)
Adresse des Importeurs: MH Handel GmbH, Wendenstraße 309, D-20537 Hamburg, Germany. In China hergestellt.
Italy (IT)
Importato da: AOSOM Italy srl, Centro Direzionale Milanofiori, Strada 1 Palazzo F1, 20057 Assago (MI). P.I.: 08567220960. Fatto in Cina.