TTCombat M.U.L.E. Roof Topper Assembly Instructions

Product Code: TTSCW-SFU-143

Manufacturer: TTCombat

Product Line: Tabletop Scenics

Assembly Icons

?

Do not glue this part.

?+↩️

Carefully score and fold this part.

This part, or its placement, is completely optional.

?

Look closely at this step. The process order or part used may be specific.

? x2

Repeat making this part the specified number of times.

?

The next instruction step will be the same assembly so far, but from a different angle.

Sub-assembly complete. This smaller construction is ready to add to the main kit.

?

Assembly Complete! There could be more optional parts - check to the very end of instructions.

⚠️

FRAGILE: DO NOT BEND. "Bendy wood" is designed to curve around a designed frame only.

Assembly Steps

Step 3

A purple rectangular piece with two horizontal slots is shown above a grey, multi-sectioned base piece. A dashed line indicates the intended alignment for attachment.

Step 4

The grey piece from the previous step is shown attached to the grey base. A separate purple base piece is depicted below, with dashed lines indicating its connection point to the main structure.

Step 5

A sub-assembly composed of several grey interlocking pieces is shown. A prominent "x2" icon indicates that this specific sub-assembly needs to be constructed twice.

Step 6

An exploded view shows a purple piece with multiple slots and tabs, a grey base structure, and another grey component. Dashed lines illustrate how these parts connect.

Step 7

A sub-assembly of grey pieces is depicted, showing a partially constructed section of the model.

Step 8

An exploded view displays a grey structure and two identical purple pieces. These purple pieces have interlocking tabs designed to fit into the grey structure, as indicated by dashed lines.

Step 9

An exploded view shows a grey base piece and three distinct purple components. Dashed lines illustrate the intended connection points for these purple pieces to the base.

Step 10

An exploded view reveals multiple grey components and a large, flat purple base. Dashed lines indicate the assembly sequence. Text reads: "Connect all white pieces together, followed by purple."

Step 11

An exploded view shows two small purple hinge pieces and a larger purple hatch door, positioned above a grey structure. Dashed lines indicate attachment. Text reads: "Glue hinges to hatch door but not to the floor. It can be positioned opened or closed."

Step 12

An exploded view shows a purple ladder component above a grey structure. Dashed lines indicate its placement. Text reads: "Ladder is optional and ideal for when using the Roof Topper on the core kit." An optional icon (❓) is also present.

Step 13

An exploded view depicts a tall, slender purple structure, a smaller purple connecting piece, and a grey base. Dashed lines show how these parts are intended to fit together.

Step 14

The grey base and the lower section of the main structure are shown assembled.

Step 15

An exploded view shows the tall purple structure from Step 13, positioned above the assembled grey base structure from Step 14. Dashed lines indicate the connection.

Step 16

The tall purple structure is shown being attached to the assembled grey base structure. Dashed lines indicate the alignment and connection points.

Step 17

The tall purple structure is shown partially attached to the assembled grey base structure, illustrating the ongoing assembly process.

Step 18

The main grey base structure of the Roof Topper is shown fully assembled.

Step 19

An exploded view shows the tall purple structure being attached to the assembled grey base structure. Dashed lines indicate the connection points.

Step 20

The tall purple structure is shown attached to the assembled grey base structure, continuing the assembly.

Step 21

An exploded view shows the assembled grey structure and a small, U-shaped purple component. Dashed lines indicate its placement on the structure.

Step 22

An exploded view shows the assembled grey structure and a small, U-shaped purple component. Dashed lines indicate its placement on the structure, from a different angle than Step 21.

Step 23

An exploded view shows the assembled grey structure and a small, U-shaped purple component. Dashed lines indicate its placement on the structure, from another angle.

Step 24

An exploded view shows the assembled grey structure and a large, flat green panel. Dashed lines indicate the panel's attachment point to the top of the structure.

Step 25

The large green panel is shown attached to the top of the assembled grey structure, forming the main visual element of the Roof Topper.

Step 26

An exploded view shows a tall purple structure featuring the text "SPLENDOUR HEIGHTS" and the number "4" on its face. This is positioned above a grey structure. Text reads: "Roof Topper can replace Mule: Core - roof." A "do not glue" icon (?) is present.

Step 27

The fully assembled "Mule: Roof Topper" is shown, featuring the green panel with text elements (including "SPLENDOUR HEIGHTS").

Step 28

Two views of the completed "Mule: Roof Topper" are presented, showcasing the assembled model with the green panel. The green panel displays decorative text elements, including what appears to be stylized characters and symbols.

Models: TTSCW-SFU-143 Mule Roof Topper, TTSCW-SFU-143, Mule Roof Topper, Roof Topper, Topper

PDF preview unavailable. Download the PDF instead.

SFU143 INS ?v=1692008561 Adobe PDF Library 17.0 Adobe InDesign 18.3 (Windows)

Related Documents

Preview Tabletop Scenics Satlink TTSCW-SFU-167 Assembly Instructions
Detailed assembly guide for the Tabletop Scenics Satlink model (TTSCW-SFU-167) by TTCombat, featuring step-by-step visual instructions and an icon key.
Preview Tabletop Scenics TTSCW-SFU-111 Mod.Co.N 2x2 Straights Assembly Instructions
Detailed assembly guide for the Tabletop Scenics TTSCW-SFU-111 Mod.Co.N 2x2 Straights model kit, providing step-by-step instructions and icon explanations for wargaming scenery.
Preview TTSCW-SFU-158 Slab Street Barriers Assembly Instructions
Detailed assembly instructions for the TTSCW-SFU-158 Slab Street Barriers from TTCombat, including an icon key and step-by-step guides for small, medium, and large configurations.
Preview TTCombat & Vallejo Paint Rack 36 Assembly Instructions
Step-by-step assembly guide for the TTCombat & Vallejo Paint Rack 36 (TTSCW-HBA-044), a versatile storage solution for hobby paints.
Preview PHR Behemoth Assembly Guide - TTCombat
Step-by-step assembly instructions for the PHR Behemoth model, including Chronus and Tethys components, from TTCombat.
Preview Dropzone Commander Fauna Unit Stat Cards
A comprehensive guide to the Fauna units in Dropzone Commander, detailing their stats, abilities, and deployment rules. Includes information on Apex, Minotaur Alpha, Mauler, Sphinx, Daggers, Bullhorn, Feral Razorworms, Feral Vampires, and Harpies.
Preview Dropzone Commander: Operation Artemis Fauna Assembly Guide
Assembly instructions for the Sphinx and Minotaur models in Dropzone Commander's Operation Artemis Fauna.
Preview Dropzone Commander PHR Frontier Walkers Assembly Guide
Assembly instructions and visual guide for the PHR Frontier Walkers miniatures in the Dropzone Commander game by TTCombat.