User Guide for Vortex models including: Model M SSK Kit, M SSK Mechanical Keyboard, M SSK, Mechanical Keyboard, Keyboard
User Manual & Others – Vortex Keyboard
Model M SSK Kit Build Guide Model M SSK Before proceeding with the assembly, please take note of the following reminders and precautions: 1. When installing the switches, please be careful and gentle, especially with the five-pin switches, to avoid damaging the hot-swap sockets during the process. 2.The stabilizers shown in the following picture belong to us. The kit does not include the stabilizers when shipped, so please prepare it on your own. 1. 2. Step 1 Use the hex key to unscrew the case (M2 black screw * 8). M2 * 8 Step 2 After disassembling the top and bottom case, secure the daughterboard at the marked locations in the picture below, and attach the gaskets according to preference. Step 3 Place the brass standoffs at the marked locations in the picture below and secure them in position by screwing in six pieces of brass standoffs from the front of the mounting plate. Utilize the included flat-head screws found in the zip bag for this process. Step 4 Place the poron switch pad and poron plate foam sequentially onto the PCBA, with the Poron switch pad positioned first, followed by the Poron plate foam. Poron poron switch pad Poron poron plate foam PCBA , Poron PoronPoron Step 5 Place the mounting plate (FR-4/brass/aluminum) on top of the Poron plate foam. (FR-4//) Poron Step 6 After positioning the mounting plate, flip it over to the backside of the PCB, and secure the previously installed brass standoffs by fastening them with screw. PCB PCB Step 7 Flip the top case of the kit to the back and position the Poron plate foam, followed by the Poron switch pad along the F-row. Finally, place the PCB on top. Then screin the M2 black screw*4 pcs. F-row Poron Poron PCB 4 M2 Step 8 Turn the main PCB over and insert the FFC (Flexible flat cable) into the connector. *Please make sure to insert the FFC at the very bottom (blue side facing up, with the metal side facing down) Close the cover once it is inserted. PCB , FFC(). FFC ( , Unclosed Closed Step 9 Place the poron bottom foam on the top of the bottom case. Poron Step 10 Connect the main PCB with the daughterboard and attach the ffc to the F-row. Place the top case and secure it with M2 black screw* 8 pcs to complete the assembly. PCB F 8 M2Microsoft Word for Microsoft 365