DeerValley Sliding Shower Door Installation Instructions

Installation Video

Watch the step-by-step installation video for a detailed demonstration. You can access it via the following URL:

https://youtu.be/hhpQERLQwSw?si=DryTZDXTe_Zn7a_V

Tip: We recommend watching the full video before starting the installation.

Product Breakdown Diagram

The product consists of the following components:

Delivery Notes

Upon receiving the product, please immediately inspect for any transportation damage, missing parts, or manufacturing defects.

Cleaning and Maintenance

  1. For daily cleaning, use common liquid detergent and a soft cloth.
  2. For stains, use a clean soft towel or a small amount of neutral soap solution or toothpaste to gently wipe.
  3. To keep the glass surface shiny, use a polishing agent.

Precautions

  1. Do not use acidic, alkaline, or sharp tools during cleaning to avoid damaging surfaces.
  2. Avoid strong detergents containing acetone or ammonia. When disinfecting, avoid disinfectants containing formic acid and formaldehyde.
  3. Do not allow body or hard objects to impact the glass surface during showering to avoid accidents.
  4. Regularly check the usage condition of the door. If abnormalities are found, contact the after-sales service department promptly.

Tool List (Not Included)

Material NameIllustrationMaterial NameIllustration
Tape measure[Tape measure]Electric drill[Electric drill]
Spirit level[Spirit level]Hammer[Hammer]
Marker pen[Marker pen]Screwdriver[Screwdriver]
1/4" drill bit[1/4" drill bit]Allen wrench[Allen wrench]
Utility knife[Utility knife]Silicone sealant[Silicone sealant]

Installation Steps

Step 1: Marking

As shown in the diagram, first measure the level of the hole marking template with a level. Then mark each hole with a pencil.

Diagram Description: Shows a shower enclosure outline with a template being leveled and marked.

Step 2: Installation of Lower Water Stop Bar

Use a 1/4" drill bit to create holes for marking points.

Insert wall plugs into the holes made on the base/floor surface, ensuring their end face is flush with the base/floor surface.

Diagram Description: Illustrates drilling holes, inserting wall plugs, and attaching the lower water stop bar. Components used: Screw-A (3PC), Lower slider (1PC), Lower Water Stop Bar (1PC), Lower Water Stop Bar Fixing Parts (2PC), Wall Entry Plug (3PC).

Special Reminder: Measurement for Upper Guide Rail

Before proceeding, determine the correct distance for the upper guide rail components from the floor. The Guide Rail Wall Cover (No: A) should be positioned 1812 mm (71.34 inches) above the bottom surface where you are installing it. This measurement is from the floor or the top edge of the shower base.

Diagram Description: Shows a side view of a shower wall with a measurement line indicating 1812mm (71.34 inches) from the floor to the Guide Rail Wall Cover.

Step 3: Installation Sequence of Upper Guide Rail

Ensure horizontal alignment during installation. Attach the Guide Rail Wall Sleeves (No: A1, A2, A3), Guide Rail Cover (No: B), and Inner Guide Rail (No: C) using Screw-B (No: M) and Wall Plugs (No: E).

Diagram Description: Illustrates the sequence of attaching the upper guide rail components to the wall.

Step 4: Assemble the Door Glass Accessories

Install the Pulleys (No: D) and Collision Prevention Strips (No: F) onto the Door Glass (No: G). Ensure the two doors are opposite each other and pay attention to assembly.

Diagram Description: Shows the door glass with pulleys and collision prevention strips being attached. Components used: Pulley (4PC), Door Glass (2PC), Handle (2PC), Collision Prevention Strip (4PC).

Step 5: Hanging the Door Glass / Adjusting Horizontal Alignment

When hanging the door glass, pay attention to the inner and outer door grooves. They are opposite each other, as are the handles. Do not install them backwards, or the door glass will not move.

The door glass is considered qualified when it remains stable in an upright position without shaking. ✔️

Diagram Description: Shows the door glass being hung and adjusted. Includes a visual guide for checking stability.

Step 6: Install Anti-Detachment Accessories

Install the Pulley Anti-Detachment Components (No: L) onto the door glass. Ensure the component is snug against the guide rail.

Diagram Description: Illustrates the installation of anti-detachment positioning parts for the door glass.

Final Check and Waterproofing

After installation, confirm that there are no abnormalities. Apply glass glue for waterproofing.

Icons: [24h timer], [spray], [prohibited]

One Year Limited Warranty

DeerValley products are made with quality materials and excellent craftsmanship. This warranty covers defects in materials or craftsmanship under regular use for one year from delivery. DeerValley will provide replacement parts at no charge or replace the product if deemed defective.

Warranty Coverage:

Responsibilities of Others:

Limitations and Exclusions:

Disclaimer:

Warranty Service:

To obtain warranty service, have the following ready:

Contact DeerValley Customer Service for assistance. DeerValley will determine the appropriate resolution (repair, replace, refund, or credit).

Models: DV-1SD052, DV-1SD053, DV-1SD056, DV-1SD052 Series Sliding Shower Door, DV-1SD052 Series, Sliding Shower Door, Shower Door, Door

File Info : application/pdf, 14 Pages, 3.41MB

PDF preview unavailable. Download the PDF instead.

442bd721-f7ac-40d6-bc43-d243b0ded995

References

Adobe PDF library 16.03

Related Documents

Preview DeerValley Sliding Shower Door Installation Guide (Model DV-1SD057)
Step-by-step installation instructions for the DeerValley Sliding Shower Door (Model DV-1SD057), including parts list, diagrams, maintenance, and warranty information.
Preview DeerValley One-Piece Toilet Installation Instructions
Comprehensive installation guide for DeerValley one-piece toilets, covering tools, parts, and step-by-step procedures for a successful installation. Includes warranty information and contact details.
Preview DeerValley Farmhouse Kitchen Sink Installation Guide
Step-by-step installation instructions for DeerValley Farmhouse Kitchen Sinks, including preparation, tools, options, and a one-year limited warranty. Learn how to properly install your kitchen sink for optimal performance and longevity.
Preview DeerValley One-Piece Toilet Universal Installation Instructions
This document provides universal installation instructions for DeerValley one-piece toilets. It covers essential preparation steps, a list of suggested tools and materials, a parts list, detailed step-by-step installation procedures, and comprehensive warranty information. Includes guidance on removing the old toilet, installing closet bolts, wax ring, positioning the toilet, connecting water supply, and toilet seat installation for models DV-F816S01 and DV-F812S01.
Preview DeerValley Toilet with Macerating Pump: Universal Installation Instructions
Comprehensive installation guide for DeerValley toilets with macerating pumps, covering tools, accessories, step-by-step setup, and warranty information.
Preview DeerValley Smart Toilet DV-1S0029-V1 Installation and Owner's Manual
Comprehensive installation and owner's manual for the DeerValley Smart Toilet (Model DV-1S0029-V1), covering safety precautions, installation steps, operation, maintenance, and troubleshooting.
Preview DeerValley Two-Piece Pedestal Bathroom Sink Installation Instructions
Comprehensive installation guide for the DeerValley two-piece pedestal bathroom sink, covering tools, parts, usage, maintenance, and warranty information.
Preview DeerValley DV-1F0379-CF Liberty Wall-Hung Toilet | Features & Specifications
Explore the DeerValley DV-1F0379-CF Liberty, a modern wall-hung toilet featuring a quiet siphonic dual flush, concealed tank, and easy-to-clean design. View specifications, accessories, and warranty information.