VEVOR Side Awning User Manual
Technical Support and E-Warranty Certificate: www.vevor.com/support
Product Specifications
Model | Product Size | Color |
---|---|---|
H033-2 | 160×600cm | Beige |
H033-2 | 160×600cm | Gray |
H033-2 | 160×600cm | Black |
H033-2 | 180×600cm | Beige |
H033-2 | 180×600cm | Gray |
H033-2 | 180×600cm | Black |
Important Information
WARNING
- Do not attempt to set up the Awning in serious windy conditions.
- Keep all flame and heat sources away from the Awning materials. Under no circumstance should any naked flame sources, fuel burning devices, or heating devices be used under or near.
- Keep a fire extinguisher or water bucket nearby.
NOTICE
- Clean with cold water and a soft brush - do not use soap or detergent.
- Do not expose to petrol, oil, or solvents.
- Avoid creases and seams when rolling up the Awning.
Tools Required
A drill, wrenches, a tape measure, and a pencil are shown as necessary tools. [?]
Two people are needed for installation. [?]
Components
- A × 1 (Main Awning Fabric)
- B × 2 (Support Poles)
- C × 12 (M8*50mm Bolts)
- D × 12 (ST8*50mm Screws)
- E × 12 (Φ10*48mm Wall Anchors)
- F × 12 (Φ9 Washers)
Assembly Instructions
The awning can be assembled in a horizontal or angled position.
Step 1: Positioning
Place the support poles (B) at the desired locations, ensuring they are spaced appropriately (Max 3m apart). Position the main awning fabric (A) between the poles. [➡️]
Installation on Concrete Floor (Figure 2):
Use anchors (E) and screws (D) to secure the support poles (B) to the concrete floor. Insert anchors (E) into pre-drilled holes, then use screws (D) to attach the poles.
Installation on Wooden Floor (Figure 3):
Use screws (D) to directly attach the support poles (B) to the wooden floor. Ensure a secure fit.
Step 2: Securing the Awning
Attach the main awning fabric (A) to the support poles (B) using the provided bolts (C) and washers (F). Ensure the fabric is taut and evenly distributed.
Step 3: Adjusting the Angle (Optional)
The awning can be adjusted to an angled position by modifying the attachment points on the support poles.
Step 4: Final Check
Ensure all bolts and screws are tightened securely. Test the awning's operation to confirm it extends and retracts smoothly.
Manufacturer and Contact Information
Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
EC REP: E-CrossStu GmbH, Mainzer Landstr.69, 60329 Frankfurt am Main.
UK REP: YH CONSULTING LIMITED, C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
Imported to AUS: SIHAO PTY LTD, 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
Imported to USA: Sanven Technology Ltd., Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730