Marco FRIIA HC: Stylish Undercounter Hot/Cold Water System

A stylish, flexible undercounter hot/cold water system for higher-volume sites, such as hotels, cafes, or offices.

Hot: 28 litres per hour | Cold: 35-40 litres per hour

Product Overview

The FRIIA HC is designed for efficiency and style, providing both hot and cold filtered water from a single, compact undercounter unit. It is ideal for environments requiring a consistent supply of chilled and hot water, such as busy cafes, hotels, and offices.

Key Components and Models:

Complete Bundle Order Codes:

Chiller Specifications

Product Info Size (Dimensions D x W x H mm) Performance Specs (L/HR) Performance Specs (CUPS/HR) Plumbing, Electrical and Technical Specs (Power @220v) Plumbing, Electrical and Technical Specs (Compressor Req's) Plumbing, Electrical and Technical Specs (Charge Refrigerant)
Chiller (1000860) 436 x 259 x 455 30-40 L/HR (based on incoming water temp of 15°C and output water temp of 5-7°C) 175-235 (ΔT = 10 °C) 180 W 3/4" BSP, 1/8hp 45g R290

A minimum operating pressure of 2 bar or 28 psi downstream of filter is required for optimum output l/min.

Boiler Specifications

Product Info Size (Dimensions D x W x H mm) Performance Specs (Immediate Draw Off) Performance Specs (L/HR) Performance Specs (CUPS/HR) Plumbing & Electrical Reqs (Power @220v) Plumbing & Electrical Reqs (Plumbing Req's)
MIX UC3 (1000880) 385 x 210 x 444 3L 28L 156 2.8kW 3/4" BSP
MIX UC8 (1000887) 385 x 210 x 617 8L - - - -

Font Specifications

Name Order Code Dimensions Incl. Drip Tray (D x W x H mm) Dimensions Excl. Drip Tray (D x W x H mm) Tap to Counter (mm)
2b Font 1000868 168 x 120 x 286 138 x 30 x 286 247

Packaging Dimensions

Name Packaging Dimensions (L x W x H mm) Weight
Font 290 x 570 x 215 1.65kg
Chiller 500 x 320 x 520 35kg
MIX UC3 450 x 290 x 540 11kg
MIX UC8 450 x 290 x 700 14kg

Installation Requirements

Ventilation Requirements

Front Ventilation: Ventilation grilles cut out of standard cabinet door.

Side Ventilation: Ventilation grilles cut out of standard 600mm cabinet. Grilles may be fitted on either side as long as they ventilate into an open unobstructed area.

Base Ventilation: Ventilation grilles cut in base panel and base plinth, a grille must also be cut out at the top of the cabinet. At least 2 x vents 260mm/10.2" w x 65mm/2.5" h. The cabinet may be ventilated in many ways provided there are cut outs placed near the base and another near the top of the cabinet to take advantage of natural circulation.

Unpacking Instructions

Electrical Installation Procedure

When installing the machine, always observe the local regulations and standards. The appliance is supplied with a moulded power cord. A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install. The standard machines are supplied with a UK 3-pin plug. For EU models a 2-pin CEE-7 plug will be supplied. US models will be supplied with the suitable plug. A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install. The wires from the font are terminated in a Mini Fit connector which will plug into a similar Mini Fit connector mounted on the top lid of the undercounter boiler.

Plumbing Installation Procedure

Operating the Chiller/Carbonator for the First Time

System Overview

Counter Cut-Outs

Diagrams showing counter cut-out dimensions for the drip tray and the main unit are provided.

Radius of Maximum Font Placement

Diagram illustrating the maximum font placement radius within a standard 800mm high cabinet.

Cabinet Requirements

Minimum cabinet dimensions: 800mm (height) x 600mm (width) x 600mm (depth) with 100mm clearance around machines on all sides.

Operating Environment

Cannot exceed a temperature of 35°C.

Ventilation

Diagrams illustrating ventilation requirements for the FRIIA system, indicating the need for two ventilation points. It is recommended to remove the back of the cabinet where possible.

FRIIA Performance & Maintenance

FRIIA Output Volume

A chart displays the FRIIA chilling capacity based on flow rate of 1.4L/min and ambient temperature of 20-25°C, showing output volume (L/H) against incoming temperature (°C) for different output temperatures (3°C, 5°C, 7°C).

Sanitisation Accessories

Accessory Order Code
Sanitisation Kit: Internal Water Cooler Sanitising Solution 1L + Chiller Best Service Cartridge 8000900
Internal Water Cooler Sanitising Solution 1L 8800125
Scaleclean 1kg Descaler (5 uses) 8000260
Chiller Best Service Cartridge 8000522
Scaleclean 200g Descaler (1 use) 8000270

How to Clean FRIIA

Maintenance

For more information visit www.marcobeveragesystems.com

PDF preview unavailable. Download the PDF instead.

MARCO GBL 2024 FRIIAHC Adobe PDF Library 17.0 Adobe InDesign 19.2 (Macintosh)

Related Documents

Preview Marco 2024 US Product Guide: Beverage Dispense Solutions
Explore Marco's comprehensive 2024 US Product Guide featuring innovative beverage dispense solutions, including hot water boilers, cold coffee dispensers, and sparkling water systems for hospitality and foodservice industries.
Preview Marco 2025 Global Product Guide
Discover Marco's comprehensive range of innovative and energy-efficient beverage dispense solutions, including water boilers, coffee brewers, and milk systems designed for the global hospitality and foodservice industries.
Preview Marco Ecoboiler Water Boilers: Installation and Operation Manual
Comprehensive guide for Marco Ecoboiler T2, T5, T10, PB5, and PB10 water boilers, covering safety, installation, operation, troubleshooting, and maintenance.
Preview Marco MT Boiler Instruction Manual: Installation, Operation, and Maintenance
Instruction manual for the Marco MT Boiler (models 1000763, 1000763F). Covers installation, safety, operation, cleaning, maintenance, and troubleshooting for this hot water boiler.
Preview Marco MIX/POUR'D Font Installation and Operation Manual
Comprehensive guide for installing and operating the Marco MIX/POUR'D beverage dispensing font, including setup, programming, and maintenance instructions.
Preview Marco MIX/POUR'D Font Instruction Manual
Instruction manual for the Marco MIX/POUR'D font, covering installation, operation, and maintenance. Includes details on font box contents, counter cut-outs, hose connections, and control box setup for both MIX and POUR'D models.
Preview Marco Ecoboiler Service Manual: Installation, Operation, and Troubleshooting
Comprehensive service manual for Marco Ecoboiler water boilers (Models PB5, PB10, T5, T10), covering installation, operation, maintenance, technical data, and troubleshooting.
Preview Marco Mix UC3 Spare Parts List and Diagram
Detailed spare parts list and exploded view diagram for the Marco Mix UC3 water dispenser by Marco. Includes part numbers, descriptions, quantities, and assembly details.