TAP SCHEDULER
Setup Guide | Guide d'installation
WHAT'S IN THE BOX
The box contains the following items:
- 1. Touch panel
- 2. Multi-surface mount
- 3. Mullion mount bracket
- 4. Wall mount bracket
- 5. Documentation
BEFORE YOU BEGIN
To set up your Tap Scheduler, you will need:
- Scheduling Service Credentials
- Ethernet Cable(s)
- PoE enabled network OR PoE Injector and network (Ethernet or WiFi)
RECOMMENDED PLACEMENT
The recommended placement for the Tap Scheduler is at a height of 48" - 60" (1.2 m - 1.5 m).
MOUNTING OPTIONS
WALL MOUNT
Instructions for mounting the Tap Scheduler to a wall.
GLASS MOUNT
Instructions for mounting the Tap Scheduler to glass.
MULLION MOUNT
Instructions for mounting the Tap Scheduler to a mullion.
JUNCTION BOX MOUNT
Instructions for mounting the Tap Scheduler to a junction box, with details on 1-Gang, 2-Gang, and 60mm compatibility.
CONNECT TO POE
Connect the Tap Scheduler to a PoE enabled network or a PoE Injector.
CONFIGURE DEVICE
Follow the on-screen prompts to complete the device setup.
FACTORY RESET
To perform a factory reset:
- Press and hold the Pinhole Button (A) for 5 seconds.
- Press the Reset button (B).
- Release the Reset button (B).
- Release the Pinhole Button (A).