Labmate Stainless Steel Distillation Column LMSDC-A101

www.labmate.com | info@labmate.com

Index

Sr.no Title Page no
1. Safety Measures 2
2. Introduction 3
3. Features 3
4. Specifications 3
5. Applications 3
6. Structure Introduction 4
7. Installation 5
8. Operations 7
9. Maintenance 10
10. Troubleshooting 12
11. Circuit Diagram 13

1. Safety Measures

1.1 Safety Precautions

Sign Name Meaning
⚠️ Danger Indicates an extremely hazardous situation that will result in death or serious injury.
⚠️ Warn Indicates a hazardous situation that may result in death or serious injury.
? Prohibit No rain or splashing.
ℹ️ Notice Indicates a hazardous situation that may result in personal injury.
? Notice Watch out for high temperatures.
⚙️ Notice Be careful not to approach rotating parts.

1.2 Important Notes

  1. Inspection Upon Receipt: After receiving the goods, inspect the equipment immediately to ensure it is intact and undamaged.
  2. Packing List Verification: Refer to the packing list to confirm that the equipment matches the products you ordered.
  3. Safety Regulations: Always adhere to general safety regulations, including any applicable local safety procedures.
  4. Installation & Maintenance: All installation and maintenance work must comply with current mechanical and electrical regulations.
  5. User Responsibility: Users must operate the equipment according to the specified regulations. Regular maintenance and timely replacement of parts are required. If any abnormal operation or potential danger is observed, stop the equipment immediately.
  6. Safety Precautions: During installation, operation, and maintenance, prioritize safety at all times. Use appropriate tools and wear necessary protective gear such as clothing, gloves, and goggles.
  7. Consequences of Non-Compliance: Failure to follow the safety warnings and operating procedures may result in equipment damage and pose a serious risk of personal injury.

2. Introduction

The Stainless Steel Distillation Column LMSDC-A101 has a 10 L tank capacity. Its compact construction ensures corrosion resistance and durability. It is equipped with electric, thermal oil, or steam heating options for controlled and efficient temperature management. Integrated manual or automatic reflux ratio control enhances efficiency. This Distillation Column is ideal for refining and extracting solvents and petrochemicals.

3. Features

4. Specifications

Model No. LMSDC-A101
Capacity 10 L
Operating Temperature Range -20 to 200°C
Condenser Area 0.4 m²
Reflux Ratio Control Yes
Temperature Display Yes
Pressure Display Yes
Continuous Sampling Yes
Power Supply 220V/50Hz,1P
Height 2 m

5. Applications

The Stainless Steel Distillation Column LMSDC-A101 is ideal for extraction of spice flavors, biofuel production, wine quality, solvent reuse, and petrochemical processing in pharmaceutical, chemical, and electronics fields.

6. Structure Introduction

The process principle and structure of the glass fractionation tower involve a packed tower filled with fillers of various shapes. The liquid flows along the surface of the filler, forming a liquid film dispersed in the continuously flowing gas. The gas-liquid two-phase contact surface is on the surface of the liquid film of the filler, acting as a film-like contact device. The packed tower uses fillers as the basic component for gas-liquid contact and mass transfer. The liquid flows from top to bottom as a film on the packing surface, while the gas flows continuously from bottom to top. Gas and liquid exchange mass and heat between phases. Component concentrations and temperatures vary continuously along the height of the tower.

Figure-1 Description: A diagram showing the components of a packed tower, including liquid inlet, precision device, redistributor, manhole, gas in, liquid outlet, gas out, liquid in, and liquid out.

A complete set of glass fractionation towers includes:

  1. Heating pot
  2. Tower reactor
  3. Fractionation column
  4. Gas riser pipe
  5. Condenser
  6. Refluxing ratio controller
  7. Sampling section
  8. Collecting flask
  9. Protection cold trap
  10. Vacuum pump
  11. Control box
  12. Cooling circulator
  13. Heating circulator
  14. Bracket, etc.

Figure-2 Description: A diagram illustrating the overall assembly of a distillation column system.

7. Installation

7.1 Installation and commissioning

Installation location:

Locations must meet the following requirements. Intense heating can cause damage to the item.

Assembly of the main frame of the fractionation tower:

According to the equipment assembly drawings, assemble the pipe fittings and joints required for the main frame.

Installation of lifting table, magnetic stirring electric heating mantle, and fractionation tower:

Place the lifting platform on the main frame tray according to the assembly drawing, place the electric heating mantle on the lifting platform, and place the tower flask in the electric heating mantle.

Installation of fractionation tower:

Connect the fractionation tower column to the RS interface of the upper tower flask, fix the tower to the main frame with cross clamps, and add packing to the tower column.

Condenser installation:

Connect the coil condenser to the interface of the upper fractionation tower column, and fix the condenser on the main frame with fixing clips (to ensure the verticality of the condenser and the tower column).

Installation of sampling valve, collecting flask, and protective cold trap:

Align the sampling valve with the lower port of the condenser, and fix it with a U-shaped clamp (to ensure verticality); then align the glass liquid separation valve with the lower port of the upper sampling valve, and first fix the liquid separation valve on the main frame (to ensure horizontality), and then use the U-shaped clamp to connect and fix the liquid separation valve and the sampling valve; fix the collection flask to the lower port of the liquid separation valve with the U-shaped clamp; fix the cold trap on the frame with a cross clamp.

Pipeline installation:

Connect the vacuum port of the liquid separation valve, the vacuum port of the condenser, the vacuum gauge port, and the vacuum pump with a vacuum hose.

7.2 Packaging and Storage Conditions

Pay attention to the risk of rupture due to improper activity.

Storage condition:

Figure-3 Description: A PID flow chart illustrating the distillation process, showing components like the distillation column, cold trap, return head, sampling valve, and exhaust gas outlet.

8. Operations

8.1 Equipment operation

Preparations

Check whether the reflux ratio controller, temperature control console, and each terminal are firm and whether the ground wire is connected well. Check the connectors of each power line and signal line for good condition. Assemble the fixed frame, and place the tower temperature control table and reflux ratio controller on the frame table.

Tower Installation

  1. The tower heating device is placed in an appropriate place on the fixed frame platform (according to the actual situation, place the lifting platform).
  2. Put the flask into the electric heating mantle and fix it on the frame. The middle flask mouth should be as vertical as possible.
  3. At each interface of the tower, where there is a grinding mouth, it must be coated with vacuum grease, carefully installed with the flask, and clamped vertically in a straight line with a clip. Check whether the tower column is installed vertically so as not to affect the fractionation effect.
  4. Apply high-vacuum silicone grease to the interface of the fractionation head and connect it to the fractionation column. Rotate the fractionation head to make the grinding mouth tightly connected and fix it with a clip (pay attention to the angle of the clip to prevent the left and right forces of the interface between the fractionation head and the fractionation column from damaging the interface), and connect the cooling water inlet and outlet hoses of the tower head. The rubber hose is fixed with a wire tie to prevent accidental pulling of the rubber hose and damage to the water inlet and outlet port; when operating, pass the water first.
  5. Fix the electromagnet with a clip, facing and close to the pendulum, so that it can attract the pendulum when it is energized, and drain and extract.
  6. Apply vacuum silicone grease to each grinding port of the multi-component connector, connect it to the outlet of the rectification head, slowly rotate the connector, and fix it with a clip (pay attention to the angle of the clip to prevent the fractionation head from being in contact with the vacuum connector and forcing each other to damage the interface), and connect the receiver. thermowell.
  7. Apply vacuum silicone grease to the interface of the flask, install the thermowell and glass hollow plug, and add about 1/4 volume of methyl silicone oil into the flask.
  8. When operating under normal pressure, pay attention to the emptying of the system; when operating under vacuum, perform a vacuum leak test before operation. It is crucial to perform a vacuum leak test before operation, and the experiment can only be carried out when the vacuum meets the experimental requirements.

Note: Put the temperature control and temperature measurement thermocouples of each part into the casing at the corresponding position.

8.3 Circuit Check

  1. Plug in the circuit connectors on the operation table.
  2. Check the intelligent fractionation temperature control console, the reflux ratio controller, and whether the circuit is disconnected, and then proceed to the temperature rise operation.
  3. Connect the instrument to the protective ground! The power connection must have a reliable ground wire to ensure that the shell is safely grounded. Before connecting, please ensure that the power supply voltage meets the requirements of the instrument. Any damage caused by incorrect voltage connection will not be compensated.
  4. The electrical part must not enter the water, and it is strictly forbidden to be damp!

8.4 Feeding

Open the feeding port or sampling port of the tower, add the rectified sample, and add a few ceramic rings or PTFE stirring bars (with a magnetic stirring electric heating mantle) at the same time to prevent bumping.

8.5 Warming up

  1. Turn on the main power switch, and the intelligent rectification temperature controller will display a numerical value.
  2. Turn on the tower heating temperature control switch to heat. Detailed operation can be found in the operation instructions of the electric heating mantle.

Note: The set temperature of the tower heat temperature control instrument should be 20-30 °C higher than the boiling point temperature to ensure sufficient temperature difference for heat transfer. This value can be selected according to the heat sensitivity of the material required by the experiment and adjusted while raising the temperature. If no steam rises into the tower head for a long time, it indicates that the heating temperature is not high enough and needs to be increased. If the temperature is too low, evaporation will be small, resulting in no distillate. If the temperature is too high, evaporation will be large, potentially causing liquid flooding. It is also necessary to re-check whether cooling water is passed to the tower head. This operation must be carried out before the temperature rises. Water should not be passed again when steam appears at the top of the tower, as this could cause the tower head to burst.

  1. When the tower starts to boil, the temperature of the fractionation column can be adjusted as needed, and the heating temperature needs to be adjusted according to the specific situation.

Note: The heating temperature should not be too high. If it is too large, it may cause overheating and damage the tower wall. The reflux liquid may not be able to carry out gas-liquid phase equilibrium material transfer with the rising vapor, which will reduce the separation efficiency of the tower.

8.6 Distillation

  1. After the temperature rises, observe the temperature change of the tower and the top of the tower. When gas appears at the top of the tower and condenses in the tower head, the material can be discharged after a period of total reflux.
  2. When performing reflux ratio operation, the reflux ratio controller should be turned on for a given ratio. The ratio of power-on time to power-off time is usually measured in seconds, representing the ratio of production volume to reflux volume.

8.7 Stop operation

When the operation is stopped, the switches of each part should be turned off. Stop the cooling water when no steam rises.

Warning: If the fractionation device is not used for a long time, it needs to be disassembled and cleaned in time to prevent the joints from sticking and becoming disassembled.

Note: During the use of the entire rectification equipment, the power socket must have a good earth leakage protection device, and attention must be paid to electrical safety.

9. Maintenance

9.1 Cleaning Requirement

During the distillation process, the fractionation tower and related equipment must be cleaned when:

9.2 Safety Preparations Before Cleaning

9.3 Solvent Selection

Use water-soluble and volatile solvents (e.g., methanol, ethanol, petroleum ether, tetrahydrofuran, toluene) for cleaning. If water is used, ensure any residual moisture is promptly removed with a water-soluble solvent to prevent corrosion or product contamination due to electrochemical reactions.

Note: Avoid ketones, chlorinated hydrocarbons, low-molecular-weight lipids, strong polar solvents, and nitro-organic compounds, unless necessary, as they can cause FKM gaskets to swell, degrade, and lose sealing integrity. Replace gaskets if degradation is suspected.

9.4 Cleaning Process

  1. Choose the appropriate solvent based on the material properties, process conditions, safety, and environmental requirements.
  2. Perform cleaning at normal pressure, adjusting parameters such as temperature and feed rate.
  3. The main heating temperature should be set around the solvent's boiling point ±10-20°C.

9.5 Cleaning Validation

  1. Repeat solvent cleaning until the solvent becomes clear and free of visible contaminants.
  2. Submit a sample for inspection.
  3. Approve the cleaning based on production standards.
  4. For the same product batches, follow the specific production process requirements for intermediate cleaning.

9.6 Post-Cleaning Drying

9.7 Vacuum Testing

  1. After drying, reinstall all accessories and check one-way valves and sealing rings (replace if damaged).
  2. Use a vacuum system to test the sealing performance.
  3. Ensure the vacuum holds to meet production requirements.
  4. If a leak is detected, inspect connections and gaskets. Repair or replace components as needed, then retest until the required vacuum level is achieved.

9.8 Equipment Maintenance

  1. Check all connections for looseness. Tighten them as needed with the power off.
  2. Maintain a clean appearance of the equipment.
  3. Stop the machine immediately if abnormal noises are detected and perform an inspection.
  4. Regularly clean dust from the exterior of electrical equipment and tighten all power connections.
  5. Periodically inspect auxiliary equipment (e.g., cooling circulator, vacuum pump) and add or replace refrigerant, pump oil, etc.

10. Troubleshooting

The instrument does not light up after the main power supply is turned off.

  1. Check whether the plug of the power cord is correct, whether there is any bad contact, and whether the socket is powered.
  2. Check whether the input terminal of the relay is connected to 220V or 380V and whether there is any error.
  3. Check whether the switch is in poor contact and whether the main circuit is correct.

After turning on the heating switch of the rectification temperature control platform, there is no heating.

  1. Check the setting of the control instrument. The setting temperature should be higher than the measured temperature, and the red light on the instrument panel should be flashing.
  2. Check whether the rectification temperature control platform is damaged.

The temperature control accuracy of a certain circuit is not enough, or the temperature fluctuation and hysteresis are particularly serious.

Check whether the instrument setting is correct; refer to the instrument manual for operation.

The column temperature is out of control or continuously heating.

  1. Check whether the temperature setting value is wrong. If the setting value is too high and the actual measured temperature does not reach the set value, the instrument will continue to heat up.
  2. Observe whether there is any change in the measured value. If there is a reading on the rectification temperature control station, but the temperature does not rise, it is possible that the thermocouple is damaged.
  3. Check whether the relay is burned through. Turn off the main power supply, disconnect the output line at the terminal of the circuit, and use a multimeter to check whether the two terminals of the solid-state relay and the voltage regulator in the circuit are conducting. If conducting, it indicates that it has broken down and needs to be replaced.
  4. Check whether the instrument is self-tuning and whether the control parameters of the instrument have been modified by someone and can be restarted in self-tuning.

The sound of continuous operation cannot be heard after the electromagnetic return switch is turned on.

  1. Check whether the reflux ratio controller has been set correctly.
  2. Check whether the electromagnetic coil is close to the return ratio.

11. Circuit Diagram

Electrical Diagram

Diagram Description: The electrical diagram shows the wiring connections for the distillation column's control system, including sensors, heating elements, switches, relays, and indicators. It details the power supply, signal lines, and connections between various components like the temperature control console, reflux ratio controller, and heating elements.

Models: LMSDC-A101 Stainless Steel Distillation Column, LMSDC-A101, Stainless Steel Distillation Column, Steel Distillation Column, Distillation Column

File Info : application/pdf, 14 Pages, 778.22KB

PDF preview unavailable. Download the PDF instead.

stainless-steel-distillation-column-lmsdc-a101 ?srsltid=AfmBOop9R0Kp8gNp0aD3WeuAF15a0Rw7bsXG0TDV8mVQq0e-Iqc5lSK8

References

iLovePDF

Related Documents

Preview Labmate Drying Oven LMOD-A101 Operational Manual
Operational manual for the Labmate Drying Oven LMOD-A101, detailing safety measures, features, specifications, applications, operations, troubleshooting, and circuit diagram.
Preview Labmate Drying Oven LMOD-A109 Operational Manual
Operational manual for the Labmate Drying Oven LMOD-A109, detailing safety measures, introduction, features, specifications, applications, structure, operations, troubleshooting, and circuit diagram.
Preview Labmate LMPCR-A102 PCR Cabinet User Manual
Comprehensive user manual for the Labmate LMPCR-A102 PCR Cabinet, detailing its features, specifications, installation, operation, maintenance, and troubleshooting.
Preview Labmate LMMA-103 Melting Point Apparatus Operational Manual
This operational manual provides detailed instructions for the Labmate LMMA-103 Melting Point Apparatus, covering safety measures, instrument introduction, features, specifications, operations, and troubleshooting.
Preview Labmate LMMA-104 Melting Point Apparatus Operational Manual
This operational manual provides comprehensive instructions for the Labmate LMMA-104 Melting Point Apparatus, covering safety measures, instrument introduction, features, specifications, applications, operations, and troubleshooting.
Preview Labmate LMMA-102 Melting Point Apparatus Operational Manual
This operational manual provides detailed instructions for the Labmate LMMA-102 Melting Point Apparatus, covering safety measures, features, specifications, operations, and troubleshooting.
Preview Labmate LMMA-103 Melting Point Apparatus: Operational Manual
Comprehensive operational manual for the Labmate LMMA-103 Melting Point Apparatus, covering safety, features, specifications, operation procedures, and troubleshooting.
Preview Labmate LMPCR-A103 PCR Cabinet User Manual
Comprehensive user manual for the Labmate LMPCR-A103 PCR Cabinet, detailing its features, specifications, installation, operation, maintenance, and troubleshooting.