Product Information
This guide details the installation process for the Cersanit ENTER flush plate. It is designed to be a user-friendly and efficient component for modern bathroom installations.
Package Contents
Upon opening the package, you should find the following items:
- 1x Cersanit ENTER Flush Plate
- 1x Mounting Frame
- 2x Long Screws (for frame attachment)
- 6x Wall Plugs (provided in two groups of 3, for wall mounting)
Installation Steps
Please follow these instructions carefully for a successful installation:
-
Step 1: Wall Preparation and Frame Mounting
Drill holes into the wall at the required locations. Insert the wall plugs into the drilled holes. Position the mounting frame against the wall and secure it using the two long screws. Ensure the frame is level and firmly attached. The screws should have a length of approximately x + 70 mm to accommodate the wall plugs and wall thickness.
[Drill holes] [Insert wall plugs] [Attach frame with screws]
-
Step 2: Aligning the Flush Plate
Carefully align the Cersanit ENTER flush plate with the mounted frame. Ensure the plate is oriented correctly and positioned at a 90° angle to the frame before proceeding.
[Align plate at 90°]
-
Step 3: Securing the Flush Plate
Insert the top edge of the flush plate into the designated slots on the mounting frame. Apply gentle pressure to the bottom of the plate, pushing it towards the wall until it clicks securely into place.
[Insert top edge] [Push bottom to lock]
-
Step 4: Final Assembly Check
Verify that the flush plate is correctly seated and securely attached to the frame. The mounting mechanism should engage properly, with a clearance of approximately 22-24 mm between the wall surface and the frame's mounting points.
[Check seating] [Verify engagement]
-
Step 5: Completed Installation
The Cersanit ENTER flush plate is now fully installed and ready for use.
[Final installed view]