User Manual for superbrightleds com models including: LPD Series LED Dimmable Panel Light, LPD Series, LED Dimmable Panel Light

Download LPD User Manual

LED Skylight w/ Forest Boughs Skylens - 2x2 Dimmable LED Panel Light - Surface Mount/Drop Ceiling | Super Bright LEDs

FS SERIES

LED Dimmale Panel Light Important: Read all instructions prior to installation. LPD Series 4400 Earth City Expy, St. Louis, MO 63045 T T 866-590-3533 superbrightleds.com Rev Date: V2.0 10/27/2021

PDF preview unavailable. Download the PDF instead.

LPD User Manual
User Manual

Important: Read all instructions prior to installation.
LED Dimmable Panel Light

LPD Series

LPD-40K24-40-SMK

Safety and Notes
· Product should be installed and serviced by a certified electrician in accordance with applicable national, state, and local building and electrical codes.
· To reduce the risk of electric shock, ensure that the main power source and circuit breakers are switched off before performing any installation or wiring procedures.
· Avoid looking directly into lamp when illuminated. · Ensure all mounts are securely attached and will support the
weight of the fixture. Failure to properly support fixture may result in damage or injury, for which the manufacturer does not assume responsibility.

Specifications
Operating Temperature IP Rating Weight

LPD-xK24-40 16 lb 5oz (7.4 kg)

LPD-xK22-40 -4°­104° F (-20°­40° C)
IP20 8 lb 2oz (3.7 kg)

LPD-xK14-40 8 lb 12oz (4 kg)

Check product label for specific electrical specifications related to installation. Improper installation will void warranty.

Recessed Installation

Note: Recessed Mounting Kit Required (LPD-JBK) 1. Turn off power and remove existing fixture or remove ceiling tile.

2. Bend each t-bar safety hook away from panel until facing perpendicular to panel backing. Bend hook arm until facing perpendicular to hook body. (Fig. 2 & 3)

Figure2

Figure3

3. Remove the knockout hole on the junction box. Run wiring through hole and secure conduit. (Fig. 4) Connect all wiring according to the wiring diagram.

Figure4

4. Attach junction box to panel backing by inserting the tabs from the junction box into ch to dimtheansdlodtsoonn't tnheeepdatnoecl obnanckeicntgt.hSeedciumremtiongthe panel with provided screw. (Fig. 5)
f the light to 5. Place panel into T-grid, making sure it is securely suf pthpeorlitgehdt. to next trun on and

Figure5

Mounting Options
Recessed Mounting Kit (LPD-JBK) sold separately 1 - Junction Box 1 - Attachment Screw Surface Mounting Kit (LPD-SMK24, LPD-SMK22, LPD-SMK14) sold separately 1 - Surface Mount Bracket 7 - Screws 7 - Screw Anchors 1 - Cable Service Loop 1 - Cable Service Loop Screw
Wiring Diagram

0-10V Dimmer
D + PURPLE D - GREY
LINE NEUTRAL GROUND

PURPLE GREY
BLACK WHITE GREEN

Dimming Driver

LED PANEL

Rev Date: V2.0 10/27/2021 4400 Earth City Expy, St. Louis, MO 63045

866-590-3533

superbrightleds.com

Important: Read all instructions prior to installation.
LED Dimmable Panel Light
Surface Mount Kit Installation

User Manual
LPD Series

1. Turn off power and run supply wiring through junction box. Connect wiring using wiring diagram. (Fig. 2)
2

2. Attach surface mounting bracket to junction box and align to the desired orientation. Mark screw holes and drill pilot holes. Remove bracket and insert screw anchors into mounting surface at marks. Reinstall bracket to junction box and install mounting screws. (Fig. 3)

3

To right pos ition

3. Screw steel cable service loop to light panel (Fig.5). Align the hooks labeled "Step 1" on the surface mounting bracket with the larger slots along the edge of the panel backing labeled "Step 1" and slide to lock in place. (Fig. 4)
gp
4

Screw

R ight pos ition

4. Attach the steel cable service loop from the panel to one of the surface mount bracket hooks to hold the panel while wiring. (Fig. 5)
5

5. Connect the ground wire. Connect the two orange quick disconnects together. Connect the 0­10 V dimming wires according to the wiring diagram if needed. (Fig. 6)
6

6. Tuck wiring into junction box, being sure not to pinch wires. (Fig. 7-1)
7-1

Screw

7. Lift panel onto remaining hooks on surface mounting bracket while aligning to remaining slots on panel. Slide panel to lock into place. (Fig. 8-1 & 8-2)

8-1

8-2

Rev Date: V2.0 10/27/2021 4400 Earth City Expy, St. Louis, MO 63045

866-590-3533

superbrightleds.com


Adobe PDF Library 16.0 Adobe InDesign 16.4 (Windows)