ATESS BYPASS 100/250/500/630/1000 User Manual

Shenzhen Atess Power Technology Co., Ltd

GROWATT-ATESS Industrial Park, No.23 Zhulongtian Road, Shuitian Community, Shiyan Street, Baoan District, Shenzhen

T: +86 755 2998 8492 | E: info@atesspower.com | W: www.atesspower.com

1 About this Manual

This chapter describes the contents of this manual, target readers, and safety symbols, which can help users to have a better understanding of the manual.

1.1 Contents

This manual applies to ATESS BYPASS, it contains:

1.2 Target readers

Qualification:

1.3 How to use this Manual

Read this manual before installation of the ATESS BYPASS. Store this manual where accessible at all times.

The contents of this manual will be periodically updated or revised if necessary.

2 Safety instructions

2.1 Symbols explanation

In order to ensure the personal and property safety of the user during installation, or optimally efficient use of this product, symbols are used to highlight the information. The following symbols may be used in this manual, please read carefully, in order to make better use of this manual.

DANGER
DANGER indicates a hazard with a high level of risk which, if not avoided, will result in death or serious injury.
CAUTION
CAUTION indicates there is potential risk, if not avoided, could result in equipment malfunction and property damage.
Caution, risk of electric shock
When battery bank connecting points are exposed, there will be DC voltage in the equipment DC side; and when output breaker is on, there is a potential risk of electric shock.
Caution, risk of fire hazard
Suitable for mounting on concrete or other non-combustible surface only.
Protective conductor terminal
BYPASS has to be firmly grounded to ensure the safety of personnel.
Risk of electric shock
Energy storage timed discharge. Electrical shock danger exists in the capacitor; the cover shall be moved at least 5 minutes later after all powers are disconnected.

2.2 Safety instructions

Bypass installation and service personnel must be trained and familiar with the general safety requirement when working on electrical equipment. Installation and service personnel should also be familiar with the local laws and regulations and safety requirements.

Read this manual carefully before operation. The equipment will not be under warranty if failing to operate according to this manual.

2.3 Installation

Proper installation requires following all the instructions in the user manual involving transportation, mounting, wiring and commissioning. ATESS does not cover warranty for BYPASS damage due to failing to use it properly.

The protection level of BYPASS is IP20, which is designed for indoor installation. Please refer to chapter 5 for installation instruction.

Other notice for using BYPASS:

2.4 Operator

Bypass installation and service personnel must be trained and familiar with the general safety requirement when working on electrical equipment. Installation and service personnel should also be familiar with the local laws and regulations and safety requirements.

2.5 Important note

3 Product description

3.1 BYPASS

ATESS BYPASS model is designed to work with ATESS PCS500. Its main functions are: 1. To make PCS realize off-grid fast switching, to ensure uninterrupted supply for load. 2. To allow PCS be able to connected to power grid and generator at the same time. 3. To allow the system be able to used with PV inverter (it needs to confirm with our engineer whether the inverter is compatible with ATESS PCS system).

3.2 Circuit diagram of BYPASS

Indicator
BYPASS adopts intelligent design. The current power status can be known through three indicator lights on the door panel. Only when the system is connected with DG and grid simultaneously are there three indicators.

LED Description
PCS The indicator lights up when there is power on the AC side of PCS and it can supply power to the load normally.
Grid The indicator lights up when there is power on grid side.
GEN The indicator lights up when there is power on DG side.

3.3.2 Internal component

The internal devices of BYPASS include PCS circuit breaker, PV circuit breaker, power grid circuit breaker, maintenance switch, DG circuit breaker, load circuit breaker, thyristor, power supply micro break and PCB board.

Note: BYPASS is a function cabinet customized according to customers' needs. There are different requirements and internal devices. The figure below shows the front layout of the BYPASS500 with full function (different models have different layouts).

3.3 The layout of the main components

3.3.1 External components

The external components of BYPASS contain only indicators.

Module 1: PV input
This module can realize the access function of PV inverter, only the inverter produced by ATESS is recommended. Confirm with R & D in advance if other inverters are selected on whether the PV inverter can be connected.

Module 2: Grid input
The module is connected to realize the on/off grid switching function between PCS and grid.

Module 3: DG input
The module is connected to realize the on/off grid switching function between PCS and DG.

Module 4: Connection of DG or grid
This module is only needed when connecting DG and grid at the same time, the module won't be consisted if the system is connected to only one.

4 Transportation and storage

4.1 Transportation

Transportation should follow the transportation methods described in the user manual. BYPASS's weight and center of gravity should be taken into account during transportation. The center of gravity is marked on the box.

Caution, risk of danger
During transportation, lifting equipment and personnel must be qualified. Bypass should be placed vertically and the inclination cannot be more than 10 degrees. It is not allowed to place BYPASS upside down or transport in a horizontal position. Incorrect lifting and transportation can lead to serious injury, property loss and damage to BYPASS.

4.2 Inspection and storage

Bypass should be carefully checked before signing the document from the transportation company. Check the received items against the delivery note, and if there is any defect or damage, immediately notify the transportation company. If necessary, you can seek help from ATESS Customer Service department.

Caution
ATESS BYPASS500 can only be stored when it is stopped and all the doors are closed in a dry room to protect the internal circuits against dust and moisture.

3.4 Product information

3.4.1 Dimension and weight
Model Dimension (W*D*H/mm) Gross weight(KG)
BYPASS 100 W700*D500*H1630 115
BYPASS250 W750*D500*H1800 165
BYPASS500 W1600*D800*H1900 905
BYPASS630 W1600*D800*H1900 955
BYPASS1000 W2555*D800*H2130 1100

Note: the BYPASS cabinet is customized according to the needs of the project. The actual size and weight deviate from the above table. The actual accurate data can be provided by our sales department.

3.4.2 Packing information

No. Name Unit Qty. Note
1 BYPASS unit 1 Key included
2 User manual pcs 1
3 Certificate pcs 1
4 Factory test report pcs 1

5 Installation

5.1 Installation condition requirements

To ensure normal operation of the machine, the installation environment is required as follows:

We suggest BYPASS is installed in the distribution room. The floor, wall clearance, ventilation equipment and precaution should be designed by professional personnel and satisfy the following requirements.

Foundation requirement

Bypass is required to install on even ground with fire-retardant material as the surface or channel steel support structure, and sag or tilt ground is prohibited. The foundation shall be solid, safe and reliable. The foundation shall be capable of bearing the load of BYPASS. Its load bearing ability shall be concerned throughout the installation place selection.

Clearance space

During installation of BYPASS, appropriate space shall be left to the wall or other equipment, in order to satisfy the requirements on narrowest maintenance channel, emergency access and ventilation.

Cable trench
The cable connection of BYPASS adopts bottom inlet and bottom outlet. Cable trenches are recommended to ensure easy installation and maintenance.

Wiring specification
Cables in BYPASS can be classified into either power cables or data cables. In cabling, the power cable shall be kept far away from, and the cable shall be kept in right angle at cross. The cable shall be as short as possible, and an appropriate distance shall be kept to the power cable.

The power cable and data access shall be placed in different cable trenches respectively to reduce the electromagnetic interruption caused by sudden change of the output voltage. The distance among the power cable and data access shall be more than 0.2m. When the cables are crossed, the cross angle shall be 90 degrees, while the distance can be reduced appropriately.

Ventilation requirement

In operation, BYPASS will produce heat. When ambient temperature is too high, the electrical property of the equipment may be affected, the equipment may even be damaged. Therefore, the heat release shall be fully considered in designing the control room to ensure operation of the equipment in high efficiency. In front of the installation place of BYPASS, a space of 1.5m or more shall be ensured, the back 0.6m or more, the top 0.6m or more to ensure easy installation, cooling and maintenance.

Ventilation environment

To satisfy the ventilation requirement of BYPASS, its installation environment shall meet the following conditions:

Ventilation equipment

To ensure safe and reliable operation of the equipment, the ambient temperature must be within the permission range -25°C~ 55°C, therefore, appropriate ventilation devices must be equipped with to release the heat generated by the equipment. We suggest the ventilation rate is more than 3665m³/h.

1. There must be ventilation equipment inside the distribution room to ensure release of the waste heat generated by BYPASS from the equipment, and allow for maximum ambient environment temperature. This can be realized from installation of exhaust devices.

2. Another fan can be added at the air duct outlet to exhaust the air out and ensure balanced pressure.

3. The direction of the air outlet shall be selected according to the local actual wind direction.

4. Pay attention to the dustproof measures and waterproof design at the air inlet and outlet.

5. If more air ducts are required, its dimensions shall be designed by the professionals according to the air output amount.

Other protections
With IP20 of protection level, BYPASS is appropriate to be installed in dry and clean environment. Meanwhile, water leakage of the house shall be prevented, as it may damage BYPASS. According to EMC requirement and noise level, BYPASS shall be installed in industrial environment.

5.2 Tools and spare parts required for whole machine installation

Tools and spare parts required for installation is as follows:

5.3 Mechanical installation

5.3.1 Transportation of packaged whole machine

This BYPASS is transported as an integrated unit, and the user can hoist it from the bottom with a forklift, or move it with a hoisting crane or crane.

Note 1: BYPASS is integrated and cannot be dissembled either in transportation or installation. Any fault attributed to modification unauthorized by ATESS is beyond the quality assurance.

Note 2: In movement, tilt, violent shake or sudden force upon BYPASS shall be prevented, such as sudden down of lifting.

Note 3: Please read carefully the labeled parameters to select an appropriate transportation means and storage place.

We suggest the user make use of forklift to move BYPASS if possible.

Before BYPASS is moved to the designated place, we suggest to lay the DC input cable and AC main power supply cable. As these cables are relatively thick, they are hard to be cabled after BYPASS is installed.

5.3.2 Movement and installation of bare machine

Demolish the package of BYPASS
Please demolish the packaged cabinet of the equipment according to the following procedures:

  1. Demolish the wood side and roof of the packaged cabinet.
  2. Demolish the out-set package material on the machine.
  3. Demolish the fastening screws between the machine and the pallet.
    ① Demolish the front and back cover lids of the pedestal.
    ② Screw off the hold-down nuts at the bottom of the wood pallet.
    ③ Remove the screws, and BYPASS will depart from the wood pallet.

Movement and installation of bear machine
BYPASS with demolished package can be moved with forklift, hoisting crane, slide rail or crane. If the package demolished place is far from the final installation place, it can be transported with forklift containing wood pallet.

If the wooden pallet at the bottom of the machine has been removed, when using the forklift, the front and rear cover plates of the base need to be removed first, and the center of gravity should be placed in the middle of the two forklifts, and then start lifting and transporting, as shown in the following figure:

To keep the equipment in a better protective status, please adopt transportation with package as much as possible, and comply with the labels printed on the package in transportation:

Sign Indication
CENTER OF BALACE The gravity centre
Lifting logo HEAVE HERE
Face up to prohibit BYPASS horizontally, tilted or upside down
Handle with care, to avoid the transport environment too intense collision friction damage to BYPASS
Keep away from moisture

Bypasss whose packages are not demolished can be moved with forklift, hoisting crane, or crane. In moving, attention shall be paid to the weight painted on the package to ensure enough load capacity of the devices. As the gravity center of the equipment locates at the lower place symmetrical in front and back and left and right, the support point or hoisting point shall be arranged reasonably in transportation. The forklift transportation is the standard one. The gravity center of the cabinet in transportation should locate between two forks of the forklift. The big-size BYPASS may block driver's sight, and it shall be treated with cooperation of the aid personnel.

5.4 Electrical installation

5.4.1 Input and output requirements

Caution, risk of danger
There is a danger of electrical shock of high voltage in BYPASS' operation; only electricians of professional skills can operate.

All connections with this equipment shall be done under non-voltage state.

BYPASS may be damaged if input or output terminal is incorrectly plugged. Failure of acting upon this information may cause serious personnel injury or significant property loss even to death.

Load
The total power of load input shall be within the capacity of BYPASS.

Three phase grid connection
Grid required to be connected with the system is three phase grid, and should be in accordance to the previous agreed grid level. Otherwise, damage to the machine due to voltage level problems is not in the scope of warranty.

Cable requirements
1. Please select the corresponding withstand voltage cable according to the voltage level.
2. The current will change due to different voltage value. Please calculate the corresponding cable diameter according to the actual voltage range. The following table only provides cable requirements for the minimum operating voltage for your reference.

BYPASS 100 BYPASS250 BYPASS500 BYPASS630 BYPASS1MW
Diameter (mm²) Aperture Diameter (mm²) Aperture Diameter (mm²) Aperture Diameter (mm²) Aperture Diameter (mm²) Aperture
PV input At least a 75mm² line each phase Φ8 At least two 75mm² line each phase Φ8 At least three 95mm² line each phase Φ10 At least four 95mm² line each phase Φ10 At least five 120mm² line each phase Φ10
PCS input At least a 75mm² line each phase Φ8 At least two 75mm² line each phase Φ8 At least three 95mm² line each phase Φ10 At least four 95mm² line each phase Φ10 At least five 120mm² line each phase Φ10
Load input At least a 75mm² line each phase Φ8 At least two 75mm² line each phase Φ8 At least three 95mm² line each phase Φ10 At least four 95mm² line each phase Φ10 At least five 120mm² line each phase Φ10
Grid input At least a 75mm² line each phase Φ8 At least two 75mm² line each phase Φ8 At least three 95mm² line each phase Φ10 At least four 95mm² line each phase Φ10 At least five 120mm² line each phase Φ10
DG input At least a 75mm² line each phase Φ8 At least two 75mm² line each phase Φ8 At least three 95mm² line each phase Φ10 At least four 95mm² line each phase Φ10 At least five 120mm² line each phase Φ10
N line At least a 75mm² line each phase Φ8 At least two 75mm² line each phase Φ8 At least three 95mm² line each phase Φ10 At least four 95mm² line each phase Φ10 At least five 120mm² line each phase Φ10
PE line At least 35mm² line (special yellow green line) Φ8 At least 75mm² line (special yellow green line) Φ8 At least 25mm² line (special yellow green line) Φ8 At least 75mm² line (special yellow green line) Φ8 At least 95mm² line (special yellow green line) Φ8
Comm. line 0.75mm² special shielded comm. line 0.75mm² special twisted pair shielded comm. line 0.75mm² special twisted pair shielded comm. line 0.75mm² special twisted pair shielded comm. line 0.75mm² special twisted pair shielded comm. line

The corresponding port to access shall be selected according to the customized function and model, the accessing port is different with different requirements.

5.4.2 Grid side wiring

Caution, risk of danger
When connecting the AC grid, cut off the circuit breaker at the AC side to ensure that the AC wire connecting to terminals has no electricity.

The output voltage of the AC side of BYPASS is 400V, the wiring method of AC side and grid side is as follows:

  1. Cut off the circuit breaker at grid side, to ensure that the AC wire connecting to terminals has no electricity. Confirm it with a multimeter.
  2. Ensure that the wiring phase sequence at AC side is in consistent with the phase sequence at grid side.
  3. Strip the insulation skin off at the end of the cable.
  4. Crimping copper nose:
    1. Put the exposed copper core of the stripped wire head into the crimping hole of the copper nose.
    2. Use the terminal crimper to compress the copper nose of the wiring, and the number of crimping shall be more than two.
  5. Install the shrink fit sleeve.
    1. Select the heat shrinkable sleeve which is more consistent with the cable size, length is about 5cm.
    2. The heat shrinkable sleeve shall be sleeved on the copper nose of the wiring to completely cover the wire pressing hole of the copper nose.
    3. Use a heat blower to tighten the heat shrink sleeve.
  6. Connect "L1" cable to "L1" of AC distribution cabinet, i.e. phase a (U). Select the bolts that match the copper nose.
  7. Connect "L2" of AC output to "L2" of AC distribution cabinet, i.e. phase B (V); connect "L3" of AC output to "L3" of AC distribution cabinet, i.e. phase C (W); connect n-line to n wire on BYPASS.

Note:

5.4.3 Earthing

BYPASS must be earthing well for safety; Please make sure of the connection between PE in power distribution cabinet and PE copper in BYPASS good; and make sure the earthing cable more than half of load cable, and earthing resistance is not lower than 40.

All wiring into the channel at the bottom of BYPASS to be all the wiring is completed, the connection port must be sealed with dust cotton, to prevent dust from entering the inside of BYPASS.

Connect several connecting wires on the PE copper bar as some parts inside the energy storage controller need to be grounded, please do not change them without permission, so as to avoid electric shock.

5.5 Communication

BYPASS communicates with PCS via CAN. The following figure is the schematic diagram of the control board interface.

Control Board

Schematic diagram of the control board interface

5.6 System wiring

BYPASS is a customized model, platform construction differs due to project requirements. In order to avoid misleading customers to build the system, we do not give detailed instructions in the manual. The specific drawings shall be provided separately, or the system drawings shall be obtained from the sales or after-sales personnel of ATESS when the project needs to build a system.

Note: all circuit breakers in BYPASS are with silk screen printing. When connecting to power grid, load, DG etc., they must be connected correspondingly in the right position and the right three-phase phase sequence. Otherwise, the system will not operate normally or even damage the machine.

6 Commissioning

6.1 Inspection before operation

Before BYPASS is put into operation, its installation shall be inspected. At least two staff do the inspection according to the items listed below to ensure the correctness of the installation.

Inspection items for installation

Electrical inspection

Other inspection

6.2 Power on steps

All circuit breakers inside BYPASS are closed except the bypass switch is on. The power of BYPASS control board is taken from PCS. After the battery circuit is closed, the control board is powered on.

7 Routine maintenance

7.1 Regular maintenance

7.1.1 Maintenance and repair

CAUTION!
All maintenance and repair operations on the BYPASS can only be performed when the BYPASS is safely disconnected from all external connections, and it is confirmed that these power supplies will not be connected again and wait for at least 5 minutes.

Only professional technicians familiar with the system operation can perform such operation.

Disconnect the circuit breaker

Disconnect all switches to ensure that BYPASS does not accidentally re-connect. Use a multimeter to test, make sure the device is disconnected and voltage free.

Maintenance and modification

Only personnel authorized by ATESS can maintain and modify BYPASS. To ensure personal safety, please use only the original components provided by the manufacturer. Otherwise ATESS will not be held responsible for any problems in use.

How to use BYPASS switch

If BYPASS fails and can not continue to operate, it needs to be shut down for maintenance. When the load connected to BYPASS needs to continue to work, the BYPASS switch can be used to power the load continuously by grid or generator, and the maintenance personnel can safely repair the machine.

  1. Turn on the PCS switch in case of machine failure.
  2. Except bypass switch, turn off all the switches on BYPASS.

At this time, the load is directly supplied by the grid, and PCS is not connected to the grid. However, if the PCS is to be overhauled, it must be carried out in accordance with the PCs maintenance manual. PCS still has DC input after power grid input is disconnected. Improper operation may cause electric shock.

7.1.2 Replace the dust screen

During the use of BYPASS, the dust on the top shall be cleaned regularly, and the dust screen at the air inlet shall be cleaned or replaced. During the replacement of the dust screen, BYPASS shall be powered off.

Replacement method of dust screen: The dust-proof filter cotton on the door panel can be directly pulled up for cleaning and replacement.

CAUTION!
In order to ensure the normal operation of BYPASS, it is necessary to clean the dust screen regularly.

7.1.3 Regular maintenance

In order to ensure the normal operation of BYPASS, regular maintenance work is required. Recommended routine maintenance cycle and work, as shown in Table 7-2.

Maintenance item Cycle
Clean SCR radiator every month
Check the dust, moisture or condensation inside the cabinet every month
Check the cable connections, and fix the screw if necessary every month
Check the warning label, add or replace some if necessary every month
Manual inspection on AC and DC circuit breakers every month
Check if there is abnormal sound when BYPASS is operating every week

CAUTION!
The maintenance operation of BYPASS must be carried out when all circuit breakers of BYPASS are disconnected. After the BYPASS circuit breaker is disconnected, some devices still have residual voltage. Please wait for at least five minutes to confirm safety before maintaining BYPASS to prevent electric shock.

7.2 Waste disposal

Bypass will not cause environmental pollution, since all the components meet the requirements of environmental protection. According to environmental protection requirements, user shall dispose BYPASS in accordance with the relevant laws and regulations.

8 Appendix

8.1 Specification

Specification BYPASS 100 BYPASS250 BYPASS500 BYPASS630 BYPASS1MW
Diameter (mm²) Aperture Diameter (mm²) Aperture Diameter (mm²) Aperture Diameter (mm²) Aperture Diameter (mm²) Aperture
Rated voltage 400V
Rated current 144A 361A 722A 910A 1444A
Rated frequency 50HZ/60HZ
Rated power 100KW 250KW 500KW 630KW 1000KW
Maximum current 173A 433A 866A 1092A 1732A
Switch time Auto≤10ms
Protection degree IP20
Humidity 0%-95%
Ambient temperature -25°C-55°C
Dimensions (W*D*H/mm) 700*500* 1630 800*550* 1980 1600*800* 1900 1600*800* 1900 3055*800* 2130
Weight 115 165 905 955 1300
Comm. interface CANA/485
PCS breaker 250A 630A 1250A 1250A 2000A
Bypass breaker 250A 630A 1250A 1250A 1600A
Bypass breaker 250A 630A 1250A 1250A 2000A
Load breaker 250A 630A 1250A 1250A 2000A
Grid breaker (optional) 250A 630A 1250A 1250A 2000A
DG breaker (optional) 250A 630A 1250A 1250A 2000A

Warranty conditions
In the event of failure during the warranty period, ATESS will repair or replace the product free of charge; The failed machine shall be owned by ATESS; the customer shall set aside some time to repair the faulty machine.

Liability exemption
In case of the following circumstances, ATESS has the right not to conduct warranty:

8.2 ATESS Factory warranty

Warranty period

The warranty period of this product is three years. If otherwise specified in the contract, the contract shall prevail.

During the warranty period, the customer shall show the invoice and date of purchase to the service personnel of ATESS. At the same time, the nameplate mark on the product shall be clear and visible, otherwise, ATESS has the right not to provide warranty service.

Models: BYPASS100, BYPASS100 Bypass Cabinet, Bypass Cabinet, Cabinet, BYPASS250, BYPASS500, BYPASS630, BYPASS1000

File Info : application/pdf, 13 Pages, 2.68MB

PDF preview unavailable. Download the PDF instead.

ATESS-HPS-500KW-Hybrid-Inverter-Bypass-Cabinet-user-manual

References

Corel PDF Engine Version 22.0.0.412 CorelDRAW 2020

Related Documents

Preview ATESS PCS100-1000 User Manual - Power Conversion System Guide
Official user manual for the ATESS PCS100-1000 power conversion system. Provides detailed information on installation, operation, safety, maintenance, and technical specifications for energy storage solutions.
Preview ATESS ATS30/50/100/120/150 User Manual
This user manual provides comprehensive instructions for the ATESS ATS30/50/100/120/150 Automatic Transfer Switch, covering installation, operation, maintenance, and safety guidelines.
Preview ATESS HPS Hybrid Energy System User Manual
This user manual provides detailed product information and installation instructions for the ATESS HPS series hybrid energy storage integrated inverter. It covers product description, transportation, storage, installation, operation, maintenance, and troubleshooting.
Preview ATESS EnerLog User Manual: Installation, Configuration, and Monitoring Guide
Comprehensive user manual for the ATESS EnerLog data logger. Covers device overview, installation, network configuration (DHCP/Static IP), RS485 communication, device management, troubleshooting common issues, and uploading data to the ATESS server.
Preview ATESS PCS100/250/500/630 Bidirectional Battery Inverter Datasheet
Technical datasheet for ATESS PCS100, PCS250, PCS500, and PCS630 bidirectional battery inverters, detailing specifications for grid-connected and off-grid operation, DC battery parameters, and general information.