Important Safety Information
⚠️ To avoid the risk of accidents or damage to the machine, it is essential to read these instructions before it is installed and used for the first time.
Document Language: en-GB
Manufacturer Part Number: M.-Nr. 11 863 720
Installation Notes
Installation Requirements
- The tumble dryer must only be installed and commissioned by Miele Customer Service Department or an authorised dealer.
- The tumble dryer must be installed in accordance with all relevant regulations and standards.
- The dryer must only be operated in a room that has sufficient ventilation and which is frost-free.
Electrical Connection ⚡
- The electrical connection must be established by a qualified electrician.
- The electrical connection may only be made to an electrical system provided in accordance with all appropriate local and national legislation, regulations and guidelines. Please also observe the regulations set out by your insurance provider and energy supplier, accident prevention regulations, as well as recognised codes of practice.
- Reliable and safe operation of this tumble dryer is only ensured if it has been connected to the mains electricity supply.
- The required supply voltage, power rating and fuse rating can be found on the data plate on the tumble dryer. Ensure that the supply voltage matches the voltage quoted on the data plate before establishing the electrical connection to the tumble dryer. Connection to a supply voltage other than the one quoted on the data plate can damage the tumble dryer if the voltage is too high.
- If more than one voltage is specified on the data plate, the tumble dryer can be converted for connection to the relevant input voltage. This conversion must be performed by the Miele Customer Service Department or by an authorised dealer. During the conversion, the wiring instructions given on the wiring diagram must be followed.
- The tumble dryer can either be hard-wired or connected using a plug-and-socket connection in accordance with IEC 60309-1. For a hard-wired connection, an all-pole isolation device must be available at the installation site. An isolation device is a switch which ensures a contact opening of more than 3 mm. These include circuit breakers, fuses and contactors (IEC/EN 60947).
- If the mains supply cannot be permanently disconnected, the isolation device (including plug and socket) must be safeguarded against being switched on either unintentionally or without authorisation.
- ? Tip: We recommend connecting the tumble dryer to the power supply via a plug and socket so that it is easier to conduct electrical safety checks (e.g. during maintenance or repair work).
- The tumble dryer must not be connected to devices such as timers which would switch it off automatically.
- If it is necessary to install a residual current device (RCD) in accordance with local regulations, a residual current device type B (sensitive to universal current) must be used.
Supply Air/Exhaust Air ?
- The tumble dryer may only be operated when the ducting has been connected and the room is sufficiently ventilated (see installation instructions).
- Accessory parts may only be fitted when expressly approved by Miele. If other parts are used, warranty, performance and product liability claims will be invalidated.
Dimensions ?
Diagrams show the physical dimensions of the Miele PDR 914/514 electrically heated commercial dryer.
- Measurements are in millimeters.
- Front View: Width: 906 mm, Height: 1400 mm, Depth: 852 mm. Clearances: >20 mm on sides. Drum diameter: Ø 520 mm.
- Side View: Width: 752 mm, Height: 1400 mm, Depth: 642 mm. Clearance from wall: 20 mm. Door opening diameter: Ø 530 mm.
- Top View: Width: 906 mm, Depth: 852 mm.
- Door Swing: The door can open up to 180°.
Installation Layout
Diagrams illustrate the required connections and clearances for installation.
- Measurements are in millimeters.
- Diagram 1 (Front/Side Layout): Shows placement of electrical connection (EL), vented air (AL), air intake (ZL), equipotential bonding (PA), peak load energy management (SLA), and XCI-/Connector-Box (XCI). Key dimensions include: 1600 mm height, 620 mm width, 280 mm depth for connections, 183 mm from top edge, 150 mm from side edge, 128 mm, 305 mm, 200 mm, 1342 mm, 96 mm, 31 mm.
- Diagram 2 (Detail "Y"): Shows connection points for ZL (Air intake) and AL (Vented). Dimensions: 160 mm, 2x, 161 mm.
- Diagram 3 (Detail "Z"): Shows connection point for AL (Vented). Dimensions: 50 mm, 150 mm.
Legend for Installation Diagrams:
- EL: Electrical connection ⚡
- AL: Vented
- ZL: Air intake ?
- PA: Equipotential bonding (option) ⚙️
- SLA: Peak load energy management (option) ⚙️
- XCI: XCI-/Connector-Box (option)
Setup Options
Set up (Standard/Miele base)
Diagrams show the dryer setup with or without a Miele base, including dimensions for placement and floor mounting.
- Measurements are in millimeters.
- Standard Setup (No Base): Front and side views showing dryer dimensions (Height: 1400 mm) and a 20 mm clearance at the rear. The base requires a width of 900 mm and depth of 747 mm.
- Setup with Miele Base (UG): Front and side views showing the dryer mounted on a Miele base (UG). Base dimensions: UG 900 (width 900 mm), UG 685 (depth 685 mm). Total height with base: 1527 mm (approx. 1400 + 127). Floor mounting points (B) are indicated.
- Detail A-A: Shows a fitting/drill hole (B) with a diameter of Ø 10 mm.
- Detail B-B: Shows a fitting/drill hole (B) with a diameter of Ø 12 mm.
Legend for Standard/Miele Base Setup:
- UG: Miele base
- B: Fittings/drill hole
Set up (Concrete platform/Offshore)
Diagrams illustrate the dryer setup on a concrete platform or for offshore installations, including dimensions for the platform and mounting points.
- Measurements are in millimeters.
- Concrete Platform Setup: Front and side views showing dryer dimensions (Height: 1400 mm) and a 20 mm clearance at the rear. The concrete platform (BS) requires a minimum width of >900 mm and depth of 1300 mm. Floor mounting points (B) are indicated.
- Offshore Setup: Similar to concrete platform setup, with specific considerations for offshore environments.
- Detail C-C: Shows a fitting/drill hole (B) for concrete platform with a diameter of Ø 10 mm. Minimum platform thickness >50 mm.
- Detail D-D: Shows a fitting/drill hole (B) for offshore setup, specifying M6 x 20 mm bolts.
Legend for Concrete Platform/Offshore Setup:
- BS: Concrete platform
- B: Fittings/drill hole
Technical Data
Voltage Variants/Electrical Data
Voltage Variant 1
Parameter | Value |
---|---|
Voltage | 3N AC 400 V |
Frequency | 50/60 Hz |
Total connected load | 14.1 kW |
Fuse rating (on-site) | 3×25 A |
Connection cable, min. cross-section | 5×2.5 mm² |
Cable gland | M25 |
Voltage Variant 2
Parameter | Value |
---|---|
Voltage | 3 AC 230 V |
Frequency | 50/60 Hz |
Total connected load | 14.1 kW |
Fuse rating (on-site) | 3×35 A |
Connection cable, min. cross-section | 4×6 mm² |
Cable gland | M32 |
Waste Air ?
Parameter | Value |
---|---|
Max. nominal air flow in vented mode (PDR 9xx only) | 560 m³/h |
Max. nominal air flow (PDR 5xx only) | 440 m³/h |
Max. permissible pressure loss | 200 Pa |
Connection on machine side (ext. diameter) | 150 mm |
Connection pipe provided on site (int. diameter) | 150 mm |
Max. temperature | 80 °C |
As relative humidity inside the vent ducting can be as high as 100%, suitable measures must be taken to prevent a backflow of condensate into the machine.
Air Intake ?
Standard connection: Air intake from installation site
- Unobstructed air intake into room recommended: 531 cm² (corresponding to 3 times the vent cross-section of machine).
- A sufficient supply of fresh air should be ensured to replace the air extracted.
Alternative connection: Ducted air intake (from outside building)
- Connector on machine (int. diameter): 161 mm
- Connection pipe provided on site (ext. diameter): 160 mm
Lid removal exposes live components. For safety reasons, the pipe connected for central air intake should be at least 900 mm long and secured using two screws.
Equipotential Bonding (option) ⚙️
- Connection with male thread: 10×35 mm
- Washers and nut: M10
- Accessories to be ordered separately.
Equipotential bonding with a good contact connection should be carried out in accordance with local and national installation regulations. Equipotential bonding with a leakage current of >10 mA should be carried out. Accessories required for equipotential bonding (washers and nuts) are not supplied with the machine.
Peak Load Energy Management (option) ⚙️
Parameter | Value |
---|---|
Control contact voltage | AC 230 V |
Connection cable, min. cross-section | 5×1.5 mm² |
Connection via a flexible supply lead with a separate isolator is recommended. The isolator should be visible and easily accessible after machine installation.
Machine Data ?
Parameter | Value |
---|---|
Overall machine width | 906 mm |
Overall machine height | 1400 mm |
Overall machine depth | 852 mm |
Niche width | 1250 mm |
Recommended distance between front of machine and the wall | 1300 mm |
Minimum distance between rear edge of lid and the wall | 500 mm |
Packaging width | 1090 mm |
Packaging height | 1526 mm |
Packaging depth | 938 mm |
Maximum gross volume | 1560.2 l |
Maximum gross weight | 171.7 kg |
Maximum net weight | 160.4 kg |
Max. floor load in operation | 1779 N |
Exhaust air spigot diameter | 150 mm |
Drum diameter | 850 mm |
Drum opening diameter | 520 mm |
Drum depth | 480 mm |
Drum volume | 250 l |
Door opening diameter | 520 mm |
Max. door opening angle | 180° |
Emission sound pressure level | 51 dB(A) re 20 μPa |
Sound power level | 62 |
Heat dissipation rate to installation site | 3.9 MJ/h |
Permitted ambient temperature | 2–40 °C |
Mounting Variants
Mounting without base
Item | Quantity | Screw size |
---|---|---|
Clamps | 2 | - |
Wood screws DIN 571 (Øxlenght) | 2 | 6×40 mm |
Dowel (Øxlenght) | 2 | 10×50 mm |
The machine should be bolted to the floor. Fixing materials for a floating screed floor are to be provided on site.
Mounting on concrete platform
Item | Quantity | Screw size |
---|---|---|
Clamps | 2 | - |
Wood screws DIN 571 (Øxlenght) | 2 | 6×40 mm |
Dowel (Øxlenght) | 2 | 10×50 mm |
Machine must be bolted to the floor. Fixing materials for a floating screed floor are to be provided on site.
Mounting on Miele base
Item | Quantity | Screw size |
---|---|---|
Clamps | 4 | - |
Wood screws DIN 571 (Øxlenght) | 4 | 8×65 mm |
Dowel (Øxlenght) | 4 | 12×60 mm |
Machine must be bolted to the floor. Fixing materials for a floating screed floor are to be provided on site.
Optional Extras
Miele base (option) ⚙️
Parameter | Value |
---|---|
Width | 900 mm |
Height | 127 mm |
Depth | 685 mm |
Concrete platform (on site)
Parameter | Value |
---|---|
Minimum width | 900 mm |
Recommended height | 100 mm |
Minimum height | 50 mm |
Minimum depth | 900 mm |
Quality and density of concrete must comply with load. Concrete platform must be firmly secured to floor.
Manufacturer Information
Manufacturer: Miele & Cie. KG, Carl-Miele-Straße 29, 33332 Gütersloh, Germany
United Kingdom
Miele Co. Ltd., Fairacres, Marcham Road, Abingdon, Oxon, OX14 1TW
Professional Sales, Tel: 0845 365 6608
E-mail: professional@miele.co.uk
Internet: www.miele.co.uk/professional
Australia
Miele Australia Pty. Ltd.
ACN 005 635 398, ABN 96 005 635 398
1 Gilbert Park Drive, Knoxfield, VIC 3180
Tel: 1300 731 411
Internet: www.miele.com.au/professional
E-mail: sales@miele-professional.com.au
China Mainland
Miele Electrical Appliances Co., Ltd.
1-3 Floor, No. 82 Shi Men Yi Road, Jing' an District, 200040 Shanghai, PRC
Tel: +86 21 6157 3500, Fax: +86 21 6157 3511
E-mail: info@miele.cn, Internet: www.miele.cn
Hong Kong, China
Miele (Hong Kong) Ltd.
41/F - 4101, Manhattan Place, 23 Wang Tai Road, Kowloon Bay, Hong Kong
Tel: (852) 2610 1025, Fax: (852) 3579 1404
Email: customerservices@miele.com.hk
Website: www.miele.hk
India
Miele India Pvt. Ltd.
1st Floor, Copia Corporate Suites, Commercial Plot 9, Mathura Road, Jasola, New Delhi - 110025
E-mail: customercare@miele.in, Website: www.miele.in
Ireland
Miele Ireland Ltd.
2024 Bianconi Ave., Citywest Business Campus, Dublin 24
Tel: (01) 461 07 10, Fax: (01) 461 07 97
E-Mail: info@miele.ie, Internet: www.miele.ie
Malaysia
Miele Sdn Bhd
Suite 12-2, Level 12, Menara Sapura Kencana Petroleum, Solaris Dutamas No. 1, Jalan Dutamas 1, 50480 Kuala Lumpur, Malaysia
Phone: +603-6209-0288
Fax: +603-6205-3768
New Zealand
Miele New Zealand Limited
IRD 98 463 631, 8 College Hill, Freemans Bay, Auckland 1011, NZ
Tel: 0800 464 353
Internet: www.miele.com.au/professional
E-mail: sales@miele-professional.com.au
Singapore
Miele Pte. Ltd.
29 Media Circle, #11-04 ALICE@Mediapolis, Singapore 138565
Tel: +65 6735 1191, Fax: +65 6735 1161
E-Mail: info@miele.com.sg
Internet: www.miele.sg
South Africa
Miele (Pty) Ltd
63 Peter Place, Bryanston 2194, P.O. Box 69434, Bryanston 2021
Tel: (011) 875 9000, Fax: (011) 875 9035
E-mail: info@miele.co.za
Internet: www.miele.co.za
United Arab Emirates
Miele Appliances Ltd.
Showroom 1, Eiffel 1 Building, Sheikh Zayed Road, Umm Al Sheif, P.O. Box 114782 - Dubai
Tel. +971 4 3044 999, Fax. +971 4 3418 852
800-MIELE (64353)
E-Mail: info@miele.ae, Website: www.miele.ae
Alteration rights reserved / Publication date: 20.21