Bathroom Vanity Assembly Guide
Thank you for selecting our quality product. Prior to assembly, carefully inspect all packing materials for any loose parts. Separate and count all components, comparing them to the parts list provided.
? Reminder
Refrain from tightening screws until assembly is complete. This ensures proper alignment and avoids any complications.
?️ Tools Required
Assembly by two people is recommended. ??
Tools such as screwdrivers are not included. Please ensure you have the necessary tools for assembly.
Parts List
Panel No | Panel Sizes | Quantity |
---|---|---|
1 | 600*450*16 | 1 |
2 | 600*450*16 | 1 |
3 | 236*450*16 | 1 |
4 | 726*451*16 | 1 |
5 | 726*451*16 | 1 |
6 | 725*450*16 | 1 |
7 | 725*450*16 | 1 |
8 | 600*60*32 | 2 |
9 | 236*60*16 | 1 |
10A/B | 600*60*16 | 2 |
11 | 600*60*16 | 2 |
12 | 236*60*16 | 1 |
13 | 236*422*16 | 1 |
14 | 597*440*16 | 2 |
15 | 658*246*5 | 1 |
16 | 706*315*25 | 4 |
17 | 470*60*25 | 4 |
18 | 448*60*25 | 2 |
19 | 300*60*25 | 4 |
Fittings
- A: M6*40 (Cam Lock Screw) - Quantity: 32
- B: Ø8*30 (Wooden Dowel) - Quantity: 36
- C: Ø15*12 (Cam Lock) - Quantity: 32
- D: Ø21 (Shelf Pin) - Quantity: 32
- E: Ø6 (Screw Cap) - Quantity: 6
- Q: Ø7*50 (Bolt) - Quantity: 4
- H: M4 (Allen Key) - Quantity: 1
- I1: Hinge - Quantity: 8
- L: Drawer Slide Component - Quantity: 8
- V2: M4*16 (Screw) - Used in Steps 5 (x6), 9 (x8), 13, 14, 15 (x2 each)
- V3: M4*40 (Screw) - Quantity: 20 (Step 7)
- V4: M5*70 (Screw) - Quantity: 4 (Step 10)
- W: Ø8*50 (Screw) - Quantity: 4 (Step 10)
- Y: Corner Bracket - Quantity: 2 (Step 9)
Assembly Instructions
Step 1: Prepare Panels
Attach panels 5, 6, and 7 to panel 1 using fittings A (M6*40) and B (Ø8*30). Attach panels 2 and 4 to panel 1 using fittings A and B. Note: Panels 6 and 7 have a "reverse side" indicated.
Step 2: Connect Side Panels
Connect panels 1 and 2 using fittings H (M4 Allen Key) and Q (Ø7*50). Two Q fittings are used per connection.
Step 3: Assemble Main Frame
Attach panel 8 and 10B to panel 5. Attach panel 11 to panel 2. Attach panel 7 to panels 5 and 2. Attach panel 10B to panel 7. Use fittings C (Ø15*12) and other fasteners.
Step 4: Add Internal Structure
Continue assembly by attaching panels 3, 9, 13, 15, and 12 to the existing structure. Panel 6 is also attached. Use fittings C (Ø15*12) and other fasteners.
Step 5: Attach Left Side and Internal Supports
Attach panel 4 and 1 to the left side of the unit. Connect internal support panels 11, 10B, 8, 12, 6, 9, 13, 7, 2, 3. Use fittings C (Ø15*12) and V2 (M4*16).
Step 6: Attach Right Side Panel
Attach panel 4 and 1 to the right side of the unit. Use fitting D (Ø21) for shelf support.
Step 7: Install Back Panels
Attach the back panels (17, 18, 19) to the rear of the unit using fitting V3 (M4*40).
Step 8: Assemble Cabinet Body
Position and connect the main cabinet body components: panels 5, 2, 8, 10B, 6, 7, 9, 12, 4, 1, 10A, 15. Use fitting E (Ø6) for screw caps.
Step 9: Secure Structure
Continue securing the structure by attaching panels 5, 12, 8, 10B, 7, 6, 9, 13, 2, 3, 1, 4, 10A. Use fittings Y (Corner Bracket) and V2 (M4*16).
Step 10: Install Drawer Slides/Supports
Attach drawer slide components or supports to the unit. Use fittings W (Ø8*50) and V4 (M5*70).
Step 11: Attach Drawer Slide Components
Attach the remaining drawer slide components (fitting L) to the unit.
Step 12: Insert Drawers/Shelves
Slide the panels 14 (drawer fronts or shelves) into their designated positions within the assembled unit.
Step 13: Prepare Doors
Attach hinges (I1) to the doors (panels 16).
Step 14: Attach Doors
Mount the doors (panels 16) onto the main unit, securing them with hinges and fitting V2 (M4*16).
Step 15: Adjust Doors
Adjust the hinges for proper door alignment and smooth operation. Follow the indicated adjustment steps (90% and 100% settings).
Step 16: Final Assembly
The bathroom vanity is now fully assembled.