Geberit Ineo Flushing Valve Installation Guide
Document ID: EM.307.23..0000 09.2024
Product Overview
This document provides installation instructions and technical details for the Geberit Ineo series of flushing valves. The guide covers various models and their assembly processes.
Models Covered:
- CC122-S-UO-2V-2C (Serial Number indicated)
- CC121-S-FO-2V-2C (Serial Number indicated)
- CC200-S-FO-2V-2C (Serial Number indicated)
- CC120-S-FO-2V-2C (Serial Number indicated)
- CC150-S-FO-2V-2C (Serial Number indicated)
Specific Model Designations:
- CC 120-S (983C)
- CC 150 (983N)
Technical Data
Height (h) Specifications for Wall-Hung Installation
The installation height 'h' can be adjusted to two ranges:
- h = 820 mm / 985 mm
- h = 1120 mm / 1185 mm
Volume Capacities
The following table details the flush volumes in Liters (L) for different settings (a-f) across various Geberit Ineo models:
Setting | CC 121-S / CC 122-S | CC 150 | CC 120-S (983C) | CC 200 | CC 150 (983N) |
---|---|---|---|---|---|
a | 2 L | 3 L | 3 L | 3 L | 3 L |
b | 3 L | 3 L | 3 L | 3 L | 3 L |
c | 4 L | 6 L | 6 L | 6 L | 6 L |
d | 6 L | 7 L | 9 L | 6 L | 6 L |
e | 7 L | 6 L | 6 L | 6 L | |
f | 6 L | 6 L | 6 L |
Installation Instructions: CC 121-S / CC 122-S
Follow these steps for the installation of the CC 121-S and CC 122-S models:
- Assemble Valve Body: Insert internal components into the main valve housing. [Diagram shows parts being inserted into the valve housing.]
- Connect Hoses: Attach the flexible hoses to the valve. [Diagram shows hoses being connected to the valve.]
- Attach Actuator Mechanism: Connect the flush actuator plate assembly to the valve. [Diagram shows the actuator plate mechanism being attached.]
- Insert Flush Valve: Place the assembled flush valve into the base of the cistern. [Diagram shows the valve being positioned in the cistern.]
- Place Cistern Lid: Position the cistern lid correctly. [Diagram shows the lid being placed on the cistern.]
- Connect Water Supply: Connect the water supply lines to the valve. [Diagram shows water supply hoses being attached.]
- Secure Assembly: Engage the securing mechanism to fix the flush valve assembly. [Diagram shows a securing element being engaged.]
- Final Connections: Connect the flush pipe and water supply. [Diagram illustrates final connections.]
Installation Instructions: CC 200
Follow these steps for the installation of the CC 200 model:
- Assemble Valve Body: Insert internal components into the main valve housing. [Diagram shows parts being inserted into the valve housing.]
- Attach Actuator Mechanism: Connect the flush actuator plate assembly to the valve. [Diagram shows the actuator plate mechanism being attached.]
- Connect Water Supply: Connect the water supply lines to the valve. [Diagram shows water supply hoses being attached.]
- Insert Flush Valve: Place the assembled flush valve into the base of the cistern. [Diagram shows the valve being positioned in the cistern.]
- Place Cistern Lid: Position the cistern lid correctly. [Diagram shows the lid being placed on the cistern.]
- Connect Flush Pipe: Attach the flush pipe. [Diagram shows the flush pipe being connected.]
- Secure Assembly: Engage the securing mechanism to fix the flush valve assembly. [Diagram shows a securing element being engaged.]
Installation Instructions: CC 120-S (983C) / CC 150-S (983N)
Follow these steps for the installation of the CC 120-S (983C) and CC 150-S (983N) models:
- Assemble Valve Body: Insert internal components into the main valve housing. [Diagram shows parts being inserted into the valve housing.]
- Attach Actuator Mechanism: Connect the flush actuator plate assembly to the valve. [Diagram shows the actuator plate mechanism being attached.]
- Connect Water Supply: Connect the water supply lines to the valve. [Diagram shows water supply hoses being attached.]
- Insert Flush Valve: Place the assembled flush valve into the base of the cistern. [Diagram shows the valve being positioned in the cistern.]
- Place Cistern Lid: Position the cistern lid correctly. [Diagram shows the lid being placed on the cistern.]
- Connect Flush Pipe: Attach the flush pipe. [Diagram shows the flush pipe being connected.]
- Secure Assembly: Engage the securing mechanism to fix the flush valve assembly. [Diagram shows a securing element being engaged.]
Cistern Installation Notes
The diagrams illustrate the flush valve installed within a cistern, connected to a toilet bowl. ⚠️ Important: Ensure correct installation height and connections. The system allows for height adjustment (↔️ [adjustment]) within specified ranges for wall-hung installations.