Trane Condensing Units 4TTX8 Installer's Guide

Document Number: 18-AC95D1-1

Important Safety Information

WARNING: This information is intended for use by individuals possessing adequate backgrounds of electrical and mechanical experience. Any attempt to repair a central air conditioning product may result in personal injury and/or property damage. The manufacturer or seller cannot be responsible for the interpretation of this information, nor can it assume any liability in connection with its use.

WARNING: These units use R-410A refrigerant which operates at 50 to 70% higher pressures than R-22. Use only R-410A approved service equipment. Refrigerant cylinders are painted a “Rose” color to indicate the type of refrigerant and may contain a "dip” tube to allow for charging of liquid refrigerant into the system. All R-410A systems use a POE oil that readily absorbs moisture from the atmosphere. To limit this “hygroscopic” action, the system should remain sealed whenever possible. If a system has been open to the atmosphere for more than 4 hours, the compressor oil must be replaced. Never break a vacuum with air and always change the driers when opening the system for component replacement. For specific handling concerns with R-410A and POE oil reference Retrofit Bulletins SS-APG006-EN and APP-APG011-EN.

WARNING: UNIT CONTAINS R-410A REFRIGERANT! R-410A operating pressures exceed the limit of R-22. Proper service equipment is required. Failure to use proper service tools may result in equipment damage or personal injury.

SERVICE: USE ONLY R-410A REFRIGERANT AND APPROVED POE COMPRESSOR OIL.

WARNING: Extreme caution should be exercised when opening the Liquid Line Service Valve. Turn counterclockwise until the valve stem just touches the rolled edge. No torque is required. Failure to follow this warning will result in abrupt release of system charge and may result in personal injury and/or property damage.

WARNING: LIVE ELECTRICAL COMPONENTS! During installation, testing, servicing, and troubleshooting of this product, it may be necessary to work with live electrical components. Failure to follow all electrical safety precautions when exposed to live electrical components could result in death or serious injury.

CAUTION: If using existing refrigerant lines make certain that all joints are brazed, not soldered.

CAUTION: Scroll compressor dome temperatures may be hot. Do not touch the top of compressor; it may cause minor to severe burning.

Unit Location Considerations

2.1 Unit Dimensions and Weight

Models H x D x W (in) Weight* (lb)
4TTX8024A 50 x 34 x 37 261
4TTX8036A 54 x 34 x 37 266
4TTX8048A 54 x 34 x 37 274
4TTX8060A 54 x 34 x 37 295

* Weight values are estimated.

When mounting the outdoor unit on a roof, be sure the roof will support the unit's weight. Properly selected isolation is recommended to alleviate sound or vibration transmission to the building structure. Please refer to application bulletin APP-APG013-EN for detailed mounting information.

2.2 Refrigerant Piping Limits

  1. The maximum length of refrigerant lines from outdoor to indoor unit should NOT exceed sixty (60) feet.
  2. The maximum vertical change should not exceed twenty five (25) feet*.
  3. Service valve connection diameters are shown in Table 5.1.

Note: For line lengths greater than sixty (60) feet, Refer to Refrigerant Piping Application Guide, SS-APG006-EN or Refrigerant Piping Software Program, 32-3312-03 (or latest revision).

* Restricted to maximum vertical change of 25 ft.

2.3 Suggested Locations for Best Reliability

Position the outdoor unit a minimum of 12" from any wall or surrounding shrubbery to ensure adequate airflow.

Outdoor unit location must be far enough away from any structure to prevent excess roof runoff water from falling directly on the unit.

2.4 Coastal Considerations

If installed within one mile of salt water, including seacoasts and inland waterways, models without factory supplied Seacoast Salt Shields require the addition of BAYSEAC001 (Seacoast Kit) at installation time. Please refer to Application Guide SS-APB006-EN: Trane - Sea Coast Applications and Seascoast Corrosion Protection Bulletin UN-SVB11A-EN.

Unit Preparation

3.1 Prepare The Unit For Installation

STEP 1 - Check for damage and report promptly to the carrier any damage found to the unit.

STEP 2 - To remove the unit from the pallet, remove tabs by cutting with a sharp tool.

Setting the Unit

4.1 Pad Installation

When installing the unit on a support pad, such as a concrete slab, consider the following:

For other applications refer to Application Guide APP-APG013-EN.

Refrigerant Line Considerations

5.1 Refrigerant Line and Service Valve Connection Sizes

Model Line Sizes Service Valve Connection Sizes
Vapor Line Liquid Line Vapor Line Connection Liquid Line Connection
4TTX8024A 5/8 3/8 5/8 3/8
4TTX8036A 3/4 3/8 3/4 3/8
4TTX8048A 7/8 3/8 7/8 3/8
4TTX8060A 1-1/8 3/8 1-1/8 3/8

5.2 Factory Charge

Trane outdoor condensing units are factory charged with the system charge required for the outdoor condensing unit, fifteen (15) feet of tested connecting line, and the smallest indoor evaporative coil match. If connecting line length exceeds fifteen (15) feet and/or a larger indoor evaporative coil is installed, then final refrigerant charge adjustment is necessary.

5.3 Required Refrigerant Line Length

Determine required line length and lift. You will need this later in STEP 2 of Section 14.

Total Line Length = ______ Ft.

Total Vertical Change (lift) = ______ Ft.

5.4 Refrigerant Line Insulation

Important: The Vapor Line must always be insulated. DO NOT allow the Liquid Line and Vapor Line to come in direct (metal to metal) contact.

Refrigerant Line Routing

6.1 Precautions

Important: Take precautions to prevent noise within the building structure due to vibration transmission from the refrigerant lines.

For Example:

Comply with National, State, and Local Codes when isolating line sets from joists, rafters, walls, or other structural elements.

CAUTION: If using existing refrigerant lines make certain that all joints are brazed, not soldered.

For retrofit applications, where the existing indoor evaporator coil and/or refrigerant lines will be used, the following precautions should be taken:

Important: For more information see publication numbers SS-APG006-EN and APP-APG011-EN.

Refrigerant Line Brazing

7.1 Braze The Refrigerant Lines

STEP 1 - Remove caps or plugs. Use a deburing tool to debur the pipe ends. Clean both internal and external surfaces of the tubing using an emery cloth.

STEP 2 - Remove the pressure tap cap and valve cores from both service valves.

STEP 3 - Purge the refrigerant lines and indoor coil with dry nitrogen.

STEP 4 - Wrap a wet rag around the valve body to avoid heat damage and continue the dry nitrogen purge. Braze the refrigerant lines to the service valves. Continue the dry nitrogen purge. Do not remove the wet rag until all brazing is completed. Important: Remove the wet rag before stopping the dry nitrogen purge.

NOTE: Precautions should be taken to avoid heat damage to basepan during brazing. It is recommended to keep the flame directly off of the basepane.

STEP 5 - Replace the pressure tap valve cores after the service valves have cooled.

Refrigerant Line Leak Check

8.1 Check For Leaks

STEP 1 - Pressurize the refrigerant lines and evaporator coil to 150 PSIG using dry nitrogen.

STEP 2 - Check for leaks by using a soapy solution or bubbles at each brazed location. Remove nitrogen pressure and repair any leaks before continuing.

Evacuation

9.1 Evacuate the Refrigerant Lines and Indoor Coil

Important: Do not open the service valves until the refrigerant lines and indoor coil leak check and evacuation are complete.

STEP 1 - Evacuate until the micron gauge reads no higher than 350 microns, then close off the valve to the vacuum pump.

STEP 2 - Observe the micron gauge. Evacuation is complete if the micron gauge does not rise above 500 microns in one (1) minute. Once evacuation is complete blank off the vacuum pump and micron gauge, and close the valves on the manifold gauge set.

Service Valves

10.1 Open the Gas Service Valve

Important: Leak check and evacuation must be completed before opening the service valves.

NOTE: Do not vent refrigerant gases into the atmosphere

STEP 1 - Remove valve stem cap.

STEP 2 - Using an adjustable wrench, turn valve stem 1/4 turn counterclockwise to the fully open position.

STEP 3 - Replace the valve stem cap to prevent leaks. Tighten finger tight plus an additional 1/6 turn.

10.1 Open the Liquid Service Valve

WARNING: Extreme caution should be exercised when opening the Liquid Line Service Valve. Turn counterclockwise until the valve stem just touches the rolled edge. No torque is required. Failure to follow this warning will result in abrupt release of system charge and may result in personal injury and/or property damage.

Important: Leak check and evacuation must be completed before opening the service valves.

STEP 1 - Remove service valve cap.

STEP 2 - Fully insert 3/16" hex wrench into the stem and back out counterclockwise until valve stem just touches the rolled edge (approximately five (5) turns.)

STEP 3 - Replace the valve cap to prevent leaks. Tighten finger tight plus an additional 1/6 turn.

Electrical - Low Voltage

11.1 Low Voltage Maximum Wire Length

Table 11.1 defines the maximum total length of low voltage wiring from the outdoor unit, to the indoor unit, and to the thermostat.

WIRE SIZE 24 VOLTS MAX. WIRE LENGTH
18 AWG 150 Ft.
16 AWG 225 Ft.
14 AWG 300 Ft.

11.2 Low Voltage Hook-up Diagrams

4TEE3F31-66 Variable Speed Air Handler Hook-up Diagram

Notes:

  1. If electric heat does not have 3rd contactor (CH), connect a jumper wire from W3 to W2. If electric heat does not have 2nd contactor (BH), connect a jumper wire from W2 to W1.
  2. Installer must remove the factory installed jumper between R and BK on the air handler terminal strip.
  3. Installer must add a field installed jumper between R and O on the air handler terminal strip.
  4. 4TTX8 units require 80% airflow with Y1 (low stage) and 100% airflow with Y2 (high stage).

A) Connect Y1 from comfort control to Y at the VS air handler and to Y1 (yellow/black) at the AC.

B) Connect Y2 from comfort control to BK at the VS air handler and to Y2 (yellow/red) at the AC.

5. Comfort control may not have W2 or W3 terminals.

Communicating Indoor Unit with 24 V Control Hook-up Diagram

Notes:

  1. See User Interface setup menu for 24 VAC control mode and cooling CFM options.
  2. First stage CFM options for 4TTX8 are 65-80%.
  3. W3 terminal may not be present on indoor unit.
  4. Comfort control may not have W2 or W3 terminals.

*AM7 Air Handler Hook-up Diagram

Notes:

Variable Speed Furnace Hook-up Diagram

Notes:

  1. Installer must cut the factory R to BK jumper on furnace circuit board. OR, on new 15-digit models, set the S5-2 DIP switch to OFF.
  2. Installer must add a field installed jumper between R and O on the furnace terminal strip
  3. 4TTX8 units require 80% airflow with Y1 (low stage) and 100% airflow with Y2 (high stage).

A) Connect Y1 from comfort control to Y at the VS furnace and to Y1 (yellow/black) at the AC.

B) Connect Y2 from comfort control to BK at the VS furnace and to Y2 (yellow/red) at the AC.

4. Comfort control may not have W2 or W3 terminals.

5. If single stage heating comfort control is used, jumper W1 to W2 on the furnace terminal strip.

Electrical - High Voltage

12.1 High Voltage Power Supply

WARNING: LIVE ELECTRICAL COMPONENTS! During installation, testing, servicing, and troubleshooting of this product, it may be necessary to work with live electrical components. Failure to follow all electrical safety precautions when exposed to live electrical components could result in death or serious injury.

The high voltage power supply must agree with the equipment nameplate. Power wiring must comply with national, state, and local codes. Follow instructions on unit wiring diagram located on the inside of the control box cover and in the Service Facts document included with the unit.

12.2 High Voltage Disconnect Switch

Install a separate disconnect switch at the outdoor unit. For high voltage connections, flexible electrical conduit is recommended whenever vibration transmission may create a noise problem within the structure.

12.3 High Voltage Ground

Ground the outdoor unit per national, state, and local code requirements.

Start Up

13.1 System Start Up

STEP 1 - Ensure Sections 7 through 12 have been completed.

STEP 2 - Set System Thermostat to OFF.

STEP 3 - Turn on disconnect(s) to apply power to the indoor and outdoor units.

STEP 4 - Wait one (1) hour before starting the unit if compressor crankcase heater accessory is used and the Outdoor Ambient is below 70°F.

STEP 5 - Set system thermostat to ON.

System Charge Adjustment

14.1 Temperature Measurements

STEP 1 - Check the outdoor temperatures.

Subcooling (in cooling mode) is the only recommended method of charging above 55° F ambient outdoor temperature.

For best results the indoor temperature should be kept between 70° F to 80° F.

Note: It is important to return in the spring or summer to accurately charge the system in the cooling mode when outdoor ambient temperature is above 55° F.

14.2 Subcooling Charging in Cooling (Above 55° F Outdoor Temp.)

STEP 1 - Use the refrigerant line total length and lift measurements from Section 5.3.

Total Line Length = ______ Ft.

Vertical Change (Lift) = ______ Ft.

STEP 2 - Determine the final subcooling value using total Line Length and Lift measured in STEP 1 and the charts below.

Design Subcooling Value = ______ °F (from nameplate or Service Facts)

Subcooling Correction = ______ °F

Final Subcooling Value = ______ °F

STEP 3 - Stabilize the system by operating for a minimum of 20 minutes. At startup, or whenever charge is removed or added, the system must be operated for a minimum of 20 minutes to stabilize before accurate measurements can be made.

STEP 4 - Measure the liquid line temperature and pressure at the outdoor unit's service valve.

Measured Liquid Line Temp = ______ °F

Liquid Gage Pressure = ______ PSI

Final Subcooling Value = ______ °F

STEP 5 - Use the final subcooling value, refrigerant temperature and pressure from STEP 4, to determine the proper liquid gage pressure using Table 14.2.

Example: Assume a 12° F Final Subcooling value and liquid temp of 90° F.

  1. Locate 12° F Final Subcooling in Table 14.2.
  2. Locate the Liquid Temperature (90° F) in the left column.
  3. The Liquid Gage Pressure should be approximately 327 PSI. (This is the shown as the intersection of the Final Subcooling column and the Liquid Temperature row.

STEP 6 - Adjust refrigerant level to attain proper gage pressure. Add refrigerant if the Liquid Gage Pressure is lower than the chart value.

  1. Connect gages to refrigerant bottle and unit as illustrated.
  2. Purge all hoses.
  3. Open bottle.
  4. Stop adding refrigerant when liquid line temperature and Liquid Gage Pressure matches the charging chart Final Subcooling value.

Recover refrigerant if the Liquid Gage Pressure is higher than the chart value.

STEP 7 - Stabilize the system. Wait 20 minutes for the system condition to stabilize between adjustments. Note: When the Liquid Line Temperature and Gage Pressure approximately match the chart, the system is properly charged.

  1. Remove gages.
  2. Replace service port caps to prevent leaks. Tighten finger tight plus an additional 1/6 turn.

STEP 8 - Verify typical performance. Refer to System Pressure Curves in the Service Facts to verify typical performance.

STEP 9 - Record System Information for reference. Record system pressures and temperatures after charging is complete.

Outdoor model number = ______

Measured Outdoor Ambient = ______ °F

Measured Indoor Ambient = ______ °F

Measured Liquid Line Temp = ______ °F

Measured Suction Line Temp = ______ °F

Liquid Gage Pressure = ______ PSI

Suction Gage Pressure = ______ PSI

Checkout Procedures and Troubleshooting

15.1 Operational And Checkout Procedures

Final phases of this installation are the unit Operational and Checkout Procedures. To obtain proper performance, all units must be operated and charge adjustments made.

Important: Perform a final unit inspection to be sure that factory tubing has not shifted during shipment. Adjust tubing if necessary so tubes do not rub against each other when the unit runs. Also be sure that wiring connections are tight and properly secured.

CHECKOUT PROCEDURE

After installation has been completed, it is recommended that the entire system be checked against the following list:

15.2 Troubleshooting

SYSTEM FAULTS

REFRIGERANT CIRCUIT

SYSTEM FAULTS C H P S S P P P S S S P P P P P S S S S S S P P P P P P S S S S S S P P P P P P S S S S S S
Head Pressure Too High C
Head Pressure Too Low H
Suction Pressure Too High C
Suction Pressure Too Low H
Liquid Refrig. Floodback (TXV/EEV) C
Liquid Refrig. Floodback H
O.D. AIR RECIRCULATION C
TXV/EEV STUCK OPEN H
SUPERHEAT C
RES. I.D. AIRFLOW H
REF. CIR. RESTRICTIONS C
SOV LEAKING H
SOV COIL DEFECTIVE C
CHECK VALVE LEAKING H
*DEFROST RELAY DEF. C
DEFROST CONTROL DEF. H
Unit Icing Up C
H

ELECTRICAL

SYSTEM FAULTS C H P S S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S
Compressor & O.D. Fan Won't Start C P P S P S P P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S
Compressor Will Not Start But O.D. Fan Runs H P P S P S P P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S
O.D. Fan Won't Start C P S
Compressor Hums But Won't Start H P S
Compressor Cycles on IOL C P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S
I.D. Blower Won't Start H P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S

DEFROST

SYSTEM FAULTS C H P S S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S P S
Unit Won't Initiate Defrost C
Defrost Terminates on Time H
Unit Icing Up C
H

C - Cooling H - Heating P - Primary Causes S - Secondary Causes * - 3 Phase Only

PDF preview unavailable. Download the PDF instead.

Download-Trane-XL18i-Install-Manual Adobe PDF Library 9.9 Adobe InDesign CS5 (7.0.4)

Related Documents

Preview Trane 4TTR7 Condensing Units Installer's Guide
Comprehensive installer's guide for Trane 4TTR7 condensing units, covering safety, installation, operation, and troubleshooting. Includes detailed instructions on refrigerant line handling, electrical connections, and system charging.
Preview Trane Condensing Units Installer's Guide: TTP018-024C, TTP030-048D, TTP060E
Comprehensive installer's guide for Trane TTP series condensing units (TTP018-024C, TTP030-048D, TTP060E). Covers installation, electrical connections, refrigerant line setup, system evacuation, and operational checks for optimal performance and safety.
Preview Trane Engineers Newsletter: AHRI 920 Standard for DX Dedicated Outdoor-Air Units
This Trane Engineers Newsletter article explains AHRI Standard 920 for rating DX Dedicated Outdoor-Air (DOA) units, comparing it with AHRI 340/360 and its impact on ASHRAE 90.1 efficiency requirements for HVAC systems.
Preview Installer's Guide: Extreme Condition Curb Mounting Kit MAYEXMK002A/003A
Installation guide for Trane and American Standard Extreme Condition Curb Mounting Kit (MAYEXMK002A/003A) for 2-5 Ton Double Deck Gas Units. Includes safety warnings, kit contents, and step-by-step installation procedures with diagram descriptions.
Preview Trane DFSL Series Ductable Fan Coil Units Installation Manual
This installation manual provides comprehensive guidance for the Trane DFSL series ductable fan coil units. It covers essential safety precautions, mechanical, hydraulic, and electrical installation procedures, operational details including thermostat and sensor compatibility, maintenance guidelines, troubleshooting steps, and technical specifications. The manual is intended for installers and users to ensure correct and safe operation of the equipment in commercial and residential applications.
Preview Trane FVAS/FCAS/FKAS Fan Coil Units Installation Manual
Installation manual for Trane FVAS, FCAS, and FKAS fan coil units. Provides detailed instructions for mechanical, hydraulic, and electrical installation, operation, and maintenance.
Preview Trane BAYOSAH Fresh Air Kit Installation Guide
Official installer's guide for Trane and American Standard BAYOSAH fresh air kits, providing installation instructions, model compatibility, dimensions, and important safety information for HVAC systems.
Preview Trane TEM6 Series Convertible Air Handler Installation Guide
Comprehensive installer's guide for Trane TEM6 series convertible air handlers (2-5 Ton), covering installation, safety, wiring, performance data, and coil conversion for various configurations. Includes detailed specifications and procedures.