User Guide for ZOTAC GAMING models including: MEK5080A9700XBT5, MEK5080A9700XBT5 Premium PC System, Premium PC System, PC System

STEP 1 STEP 2

STEP 1. ONE-TOUCH RELEASE MECHANISM.. (Power button) STEP 2. Remove the back panel by pulling the. top notch for easier access to the I/O. ports. Congratulations on your new PC!

View User Manual Details

ZOTAC Gaming MEK AI-Enhanced Gaming PC MEK5080A9700XBT5 - AMD Ryzen 7 9700X 5.5GHz, NVIDIA GeForce RTX 5080, 32GB DDR5 RGB, 2TB NVMe M.2 SSD, 1200W 80 GOLD PSU, WiFi 7, Windows 11 Home 64-bit - Newegg.com

PDF preview unavailable. Download the PDF instead.

User Manual-1739512702820
Ver 2.0

MEK5080A9700XBT5,MEK5080A9700XBLT5

For technical support 1-877-599-6822

PERIPHERAL SETUP GUIDE

9:00am ­ 6:00pm PST Mon ­ Fri.

For the PDF version please scan this QR code

Congratulations on your new PC! Accessing the I/O panel and connecting your peripherals to the MEK5080A9700XBT5/BLT5 is easy! Follow along this guide to learn how:

(Power light, Hdd light)

I/O Port (Type-C x 1) (HD Audio,mic) (Rest button)

(Power button) (USB 3.0 x 4)

(USB 3.2 (Gen 2)

STEP 1
ONE-TOUCH RELEASE MECHANISM. .

STEP 2
Remove the back panel by pulling the top notch for easier access to the I/O ports.

STEP 3

Unscrew the two thumb screws and lift

the top fan bracket latch to access the

I/O ports.

FRONT

STEP 4
Pass the cables through the designated side cutouts.
FRONT

BACK
Disconnect any fan cables as needed to fully remove the top fan bracket.

All other peripherals

BACK

Monitors and other displays

STEP 4.5

Screw the WiFi antennas onto the connectors on the motherboard.

WiFi Antennas ports

STEP 5 Plug your devices into their matching ports on the motherboard's back panel.

** Images for reference only. Port layouts may vary based on the included components.
For monitors and displays, connect directly to the appropriate port(s) on the graphics card/GPU.
Do NOT plug your monitor into the graphics port(s) on your motherboard, as it is disabled when a
graphics card is installed in your system.
EXAMPLE OF FINAL CABLE WIRING ROUTE


PDFium PDFium