Elo Z20 POS Stand Assembly Instructions
Part Number: E217972 | Revision B
Box Contents
- Stand (qty 1)
- Base Plate (qty 1)
- VESA Cover, Top, 10" (qty 1)
- VESA Cover, Bottom, 10" (qty 1)
- VESA Cover, Top, 15" (qty 1)
- VESA Cover, Bottom, 15" (qty 1)
- Screw Height Tool (qty 1)
- M4x10 Phillips Flat Head Screw (qty 8, Bag A)
- M4x6 Phillips Pan Head Screw (qty 2, Bag B)
- USB-C Cable (qty 1)
- 150W Power Supply (qty 1)
- Cable Tie (qty 1)
Recommended Assembly Torque
Thread | Torque |
---|---|
M4 | 12 in-lb (1.4 N-m) |
Assembly Steps
Step 1
If attaching stand to counter using screw-down method, remove 4 screws to disassemble weighted plate. Reinstall 4 screws back into stand.
Diagram description: Shows the weighted base plate being detached from the stand by removing four screws. Arrows indicate the direction of screw removal.
Step 2
Install 2 screws from bag A into I-Series as shown, using 2 top holes in 75mm VESA pattern. Do not tighten screws fully. Leave top of screws approximately 3/16" above back of I-Series.
Diagram description: Shows the back of an I-Series device. Two screws from Bag A are partially inserted into the upper VESA mounting holes. A label indicates a "3/16" gap" between the screw heads and the device back.
Step 3
Remove I-Series cable doors. Assemble I-Series to stand as shown, sliding 2 screws from step 2 into upper slotted holes on stand VESA bracket. Tighten screws. Install 2 screws from bag A into lower holes on stand VESA bracket. All VESA screws to be tightened to 12 in-lb (1.4 N-m).
Diagram description: Shows the I-Series device being attached to the stand's VESA bracket. Two screws (from Step 2) are slid into the upper slots. Two additional screws from Bag A are being inserted into the lower holes. Arrows point to the screws and indicate their placement. A label points to "Bag A Screws".
Step 4
Connect power and USB-C cables from stand to I-Series. Reassemble I-Series cable covers.
Diagram description: Shows the back of the I-Series device attached to the stand. A power cable and a USB-C cable are connected to the I-Series. The I-Series cable doors are shown being reattached. Labels point to "Power Cable", "USB-C Cable", and "I-Series Cable Doors".
Step 5
Assemble top VESA cover by sliding down onto stand VESA bracket. Use VESA covers corresponding to the I-Series size you are installing (10" or 15").
Diagram description: Shows the top VESA cover being slid down onto the VESA bracket on the back of the I-Series device. Blue arrows indicate the downward sliding motion.
Step 6
Flip I-series over by rotating stand hinge. Assemble bottom VESA cover by sliding down onto stand VESA bracket.
Diagram description: Shows the I-Series device, now flipped over, attached to the stand. The bottom VESA cover is being slid down onto the VESA bracket. Blue arrows indicate the downward sliding motion.
Step 7
Secure using screw provided with VESA covers.
Diagram description: Shows a screw being inserted to secure the VESA covers to the stand's bracket. A blue arrow indicates the screw insertion point.
Step 8
Remove center screw securing top of door. Tilt open door by grabbing tab at top of door.
Diagram description: Shows the back of the stand assembly. A screw is being removed from the top of a cable access door. An arrow shows the door tilting open from a tab at the top.
Step 9
If adding a customer-facing display (CFD), remove screw securing front cover. Otherwise skip to step 15.
Diagram description: Shows the inside of the stand's rear compartment. A screw is being removed from the front cover, with a blue circle highlighting the screw.
Step 10
Slide front cover up and remove.
Diagram description: Shows the front cover of the stand being slid upwards and removed. Blue arrows indicate the upward motion.
Step 11
Install 2 screws from bag A into left holes of CFD as shown (75mm VESA pattern). Use screw height tool to set screw height. Tighten screws down until screws just touch screw height tool, then remove tool.
Diagram description: Shows the back of a Customer-Facing Display (CFD). Two screws from Bag A are being installed into the left VESA mounting holes. A "SCREW HEIGHT TOOL" is shown positioned to help set the screw depth. Arrows indicate screw insertion.
Step 12
Remove CFD cable doors. Connect USB-C cable (included with stand) to CFD. Attach CFD cable clamps. Reinstall CFD cable doors.
Diagram description: Shows the back of the CFD. The CFD cable doors are removed. A USB-C cable is connected to the CFD. Cable clamps are attached, and the CFD cable doors are being reinstalled. Labels point to connection ports like "VGA AUDIO".
Step 13
Feed other end of USB-C cable through cable hole in stand. Assemble CFD onto stand, aligning 2 screws from step 11 with keyholes in stand. Once screws are engaged with keyholes, slide CFD as shown until seated.
Diagram description: Shows the USB-C cable being fed through a "Cable hole" in the stand. The CFD is then attached to the stand, aligning the screws (from Step 11) with keyhole slots on the stand. Arrows show the cable path and the CFD sliding into place.
Step 14
Install 2 screws from bag A into remaining 2 VESA holes in CFD. Connect USB-C cable to stand connector.
Diagram description: Shows the CFD attached to the stand. Two more screws from Bag A are installed into the remaining VESA holes on the CFD. The USB-C cable is shown connected to the stand's connector. Blue highlights indicate the screws and cable connection.
Step 15
Connect stand power supply, LAN, and external peripherals to stand, routing cables through hole in bottom of stand.
Diagram description: Shows the back of the I-Series and stand assembly. Power supply, LAN, and other peripheral cables are connected to the I-Series and routed through a hole at the bottom of the stand. Blue highlights show the cables.
Step 16
Secure cables to cable retainer using cable tie. If screwing down to counter, proceed to step 17. If not screwing down to counter, reinstall door and door screw from step 8. Product assembly is complete and ready to use.
Diagram description: Shows cables secured with a cable tie to a retainer clip at the bottom of the stand. The text indicates the next steps based on whether the stand is being screwed to a counter or not.
Step 17
Screw base plate to countertop (4 places).
Diagram description: Shows the "Base plate" being screwed onto a countertop surface. Blue arrows indicate the four screw locations.
Step 18
Drop stand onto base plate so screws in bottom of stand (from step 1) align with keyholes in base plate. Slide stand back to engage screws fully into keyholes.
Diagram description: Shows the stand being lowered onto the base plate that is already attached to the countertop. Screws on the bottom of the stand are aligned with keyholes on the base plate. Blue arrows indicate the motion of sliding the stand back to secure it.
Step 19
Add screw from bag B to secure stand to base plate. Reinstall door and screw from step 7. Product assembly is complete and ready to use.
Diagram description: Shows a screw from Bag B being inserted to secure the stand to the base plate. The cable access door and its screw (from Step 7) are being reinstalled.
Learn More
Learn more about Elo at EloTouch.com.
Contact Information
Americas
Tel +1 408 597 8000
Europe (EMEA)
Tel +32 16 930 136
Asia Pacific
Tel +86 (21) 3329 1385