EnerSys iQ Mini Battery Monitor

User Manual and Installation Guide

Introduction

Information contained in this document is important for the safe handling and proper use of the iQ Mini™ battery monitoring device. It includes overall system specifications, related safety measures, codes of conduct, commissioning guidelines, and recommended maintenance. This document must be kept and made available to users who work with and are responsible for the battery monitoring device. All users are responsible for ensuring the system is always used appropriately and safely based on anticipated conditions or conditions that arise during operation.

This user manual contains important safety instructions. Before using the battery monitoring device and the apparatus into which it is installed, read and understand the sections on safety and device operation.

The owner is obliged to ensure that the use of this documentation and all related activities comply with applicable legal requirements that apply to them and relate to use in the respective countries.

This user manual is not intended as a substitute for training on the handling and operation of the iQ Mini™ battery monitoring device, which may be required based on local legal regulations and/or industry standards. Before any contact with the battery system, proper instruction and training of all users must be ensured.

For service, please contact your sales representative or call:

EnerSys EMEA
EH Europe GmbH
Baarerstrasse 18
6300 Zug, Switzerland
Tel: +41 44 215 74 10
EnerSys Global Headquarters
2366 Bernville Road
Reading, PA 19605, USA
Tel: +1-610-208-1991
Tel: +1-800-538-3627
EnerSys APAC
No. 85, Tuas Avenue 1
Singapore 639518
+65 6558 7333

Website: www.enersys.com

Your safety and the safety of others is very important.

⚠️ WARNING: Failure to follow instructions may result in death or serious injury.

Features and Specifications

Features

Technical Specifications

300Q300B8310Q310S301Q
Battery TechnologyTPPL BatteryFlooded BatteryTPPL Battery
Connection TypeFlexiTap (Q)Bolt (B8)FlexiTap (Q)M4 Screw (S)FlexiTap (Q)
Nominal Battery Voltage12 V, 24 V, 36 V, 48 V, 80 V *Voltage locks after 30 minutes.
Operating Voltage4.5 V - 38 V MAX
Voltage Sensing4.5 V - 120 V
Operating Current1.6 mA - 10 mA
Operating Temperature-20 °C to +60 °C (-4 °F to +140 °F)
Temperature MonitoringInternal sensorInternal sensorExternal sensor
Wireless RangeUp to 100 m / 328 ft (unobstructed)
Data StorageCumulative data and last 9 cycle data packets
Data AcquisitionVia Gateway/App
Current ConsumptionNominal Voltage
ProtectionOvervoltage and reverse polarity protection
Physical Dimensions80 mm (D) x 29 mm (W) x 20 mm (H) / 3.14 in (D) x 1.14 in (W) x 0.79 in (H)

Compliance with Standards

2014/53/EU – Radio Equipment: Safety: EN 62368-1:2014+A11:2017; EMC: EN IEC 61326-1:2021; RF: EN IEC 62311:2020 / EN 50385:2017/EN 50665:2017, EN 300 328 V2.1.1 (2016-11), EN 300 328 V2.2.2, EN 301 489-17 - V3.2.0

2011/65/EU – Restriction of Hazardous Substances in Electrical and Electronic Equipment: RoHS: EN 62321-8:2017, EN 62321-3-1:2013, EN 62321-4:2013/AMD1:2017, EN 62321-5:2013, EN 62321-6:2015, EN 62321-7-1:2015, EN 62321-7-2:2017

Dimensions

The iQ Mini™ battery monitoring device has the following dimensions: 80 mm (3.15") length x 29 mm (1.14") width x 20 mm (0.79") height. All dimensions are in mm (inches).

Installation

This section provides installation instructions for various models.

Model 300Q Installation

The iQ Mini™ - 300Q is a battery life monitor that provides real-time status and is designed for use with 12 V to 80 V TPPL batteries. It monitors and records cycles, temperatures, and automatically sends this data to a gateway or app for online visualization. It provides LED indications for over-temperature and communication. If the battery status is OK and the device is functioning correctly, it blinks green every 10 seconds.

Installation Steps:

  1. Preparation: Ensure the voltage is between 2.0 and 2.25 V per cell before installation.
  2. Device Connection: Connect the iQ Mini™ battery monitoring device to the top of the battery.
  3. Positive Terminal: Connect the red cable to the positive terminal.
  4. FlexiTap Connection: Insert the FlexiTap into the center of the cable to ensure a good connection. Ensure it is centered and the pin is not bent.
  5. Secure FlexiTap: Secure the FlexiTap with a cable tie.
  6. Negative Terminal (12V/24V): Connect the yellow cable to the negative terminal for 12 V or 24 V systems. Note: For 24 V, connect only for 80 V batteries.
  7. Negative Terminal (Final): Connect the black cable to the negative terminal. The black cable must be connected last.

LED Status Checks:

Phase 1 LED Check: Upon power connection, observe the following LED sequence: 1 Green > 1 Red > 1 Yellow and 1 Blue. This blinking pattern repeats twice before the next phase.

Phase 2 Voltage Check: Check the number of blinks for voltage:

  • x1 = 12V
  • x2 = 24V
  • x3 = 36V
  • x4 = 48V
  • x8 = 80V

Phase 3 LED Sequence on Startup: The LED blinks once to show the current battery status.

Model 300B8 Installation

The iQ Mini™ - 300B8 is a battery life monitor that provides real-time status and is designed for use with 12 V to 80 V TPPL batteries. It monitors and records cycles, temperatures, and automatically sends this data to a gateway or app for online visualization. It provides LED indications for over-temperature and communication. If the battery status is OK and the device is functioning correctly, it blinks green every 10 seconds.

Installation Steps:

  1. Preparation: Ensure the voltage is between 2.0 and 2.25 V per cell before installation.
  2. Device Connection: Connect the iQ Mini™ battery monitoring device to the top of the battery.
  3. Positive Terminal: Connect the red cable to the positive terminal.
  4. Remove Terminal Screw: Unscrew the terminal screw.
  5. Apply Lubricant: Apply lubricant between the screw and the terminal clamp.
  6. Secure Connection: Ensure the screw is firmly attached to the clamp. (Note: Tighten screw to the manufacturer's recommended torque.)
  7. Negative Terminal (12V/24V): Connect the yellow cable to the negative terminal for 12 V or 24 V systems. (Note: For 24 V, connect only for 80 V batteries.)
  8. Negative Terminal (Final): Connect the black cable to the negative terminal. The black cable must be connected last.

LED Status Checks:

Phase 1 LED Check: Upon power connection, observe the following LED sequence: 1 Green > 1 Red > 1 Yellow and 1 Blue. This blinking pattern repeats twice before the next phase.

Phase 2 Voltage Check: Check the number of blinks for voltage:

  • x1 = 12V
  • x2 = 24V
  • x3 = 36V
  • x4 = 48V
  • x8 = 80V

Phase 3 LED Sequence on Startup: The LED blinks once to show the current battery status.

Model 310Q Installation

The iQ Mini™ - 310Q is a battery life monitor that provides real-time status and is designed for use with 12 V to 80 V flooded batteries. It monitors and records cycles, temperatures, and automatically sends this data to a gateway or app for online visualization. It provides LED indications for electrolyte status, over-temperature, and communication. If the battery electrolyte status is OK and the device is functioning, it blinks green.

Installation Steps:

  1. Preparation: Ensure the voltage is between 2.0 and 2.25 V per cell before installation.
  2. Device Connection: Connect the iQ Mini™ battery monitoring device to the battery and secure it with cable ties.
  3. Electrolyte Probe Installation: Install the electrolyte probe. The probe can be installed in any cell except the first three cells from the negative terminal of the battery.
  4. Drilling Hole (Option 1): Make a hole using a hammer and a 12 mm (1/2") drill bit. Ensure the drill bit does not touch the electrolyte.
  5. Drilling Hole (Option 2): Alternatively, drill a hole.
  6. Probe Adjustment: Trim the probe to the correct length and insert it into the battery. Ensure the probe is at least 3-5 mm (1/8 inch) above the battery plate.
  7. Positive Terminal: Connect the red cable to the positive terminal.
  8. FlexiTap Connection: Insert the FlexiTap into the center of the cable to ensure a good connection. Ensure it is centered and the pin is not bent.
  9. Secure FlexiTap: Secure the FlexiTap with a cable tie.
  10. Negative Terminal (12V/24V): Connect the yellow cable to the negative terminal for 12 V or 24 V systems. Note: For 24 V, connect only for 80 V batteries.
  11. Negative Terminal (Final): Connect the black cable to the negative terminal. The black cable must be connected last.

LED Status Checks:

Phase 1 LED Check: Upon power connection, observe the following LED sequence: 1 Green > 1 Red > 1 Yellow and 1 Blue. This blinking pattern repeats twice before the next phase.

Phase 2 Voltage Check: Check the number of blinks for voltage:

  • x1 = 12V
  • x2 = 24V
  • x3 = 36V
  • x4 = 48V
  • x8 = 80V

Phase 3 LED Sequence on Startup: The LED blinks once to show the current battery status.

Model 310S Installation

The iQ Mini™ - 310S is a battery life monitor that provides real-time status and is designed for use with 12 V to 80 V flooded batteries. It monitors and records cycles, temperatures, and automatically sends this data to a gateway or app for online visualization. It provides LED indications for electrolyte status, over-temperature, and communication. If the battery electrolyte status is OK and the device is functioning, it blinks green.

Installation Steps:

  1. Preparation: Ensure the voltage is between 2.0 and 2.25 V per cell before installation.
  2. Device Connection: Connect the iQ Mini™ battery monitoring device to the battery and secure it with cable ties.
  3. Electrolyte Probe Installation: Install the electrolyte probe. The probe can be installed in any cell except the first three cells from the negative terminal of the battery.
  4. Drilling Hole (Option 1): Make a hole using a hammer and a 12 mm (1/2") drill bit. Ensure the drill bit does not touch the electrolyte.
  5. Drilling Hole (Option 2): Alternatively, drill a hole.
  6. Probe Adjustment: Trim the probe to the correct length and insert it into the battery. Ensure the probe is at least 3-5 mm (1/8 inch) above the battery plate.
  7. Positive Terminal: Connect the red cable to the positive terminal.
  8. M4 Connection: Screw the M4 connection onto the terminal.
  9. Secure M4 Connection: Ensure the M4 connection is firmly attached to the battery.
  10. Apply Epoxy: Apply epoxy to the top of the screw.
  11. Negative Terminal (12V/24V): Connect the yellow cable to the negative terminal for 12 V or 24 V systems. Note: For 24 V, connect only for 80 V batteries.
  12. Negative Terminal (Final): Connect the black cable to the negative terminal. The black cable must be connected last.

LED Status Checks:

Phase 1 LED Check: Upon power connection, observe the following LED sequence: 1 Green > 1 Red > 1 Yellow and 1 Blue. This blinking pattern repeats twice before the next phase.

Phase 2 Voltage Check: Check the number of blinks for voltage:

  • x1 = 12V
  • x2 = 24V
  • x3 = 36V
  • x4 = 48V
  • x8 = 80V

Phase 3 LED Sequence on Startup: The LED blinks once to show the current battery status.

Model 301Q Installation

The iQ Mini™ - 301Q is a battery life monitor that provides real-time status and is designed for use with 12 V to 80 V TPPL batteries. It monitors and records cycles, temperatures, and automatically sends this data to a gateway or app for online visualization. It provides LED indications for over-temperature and communication. This variant has an external temperature sensor.

Installation Steps:

  1. Preparation: Ensure the voltage is between 2.0 and 2.25 V per cell before installation.
  2. Device Connection: Connect the iQ Mini™ battery monitoring device to the battery and secure it with cable ties.
  3. Temperature Sensor Installation: Mount the temperature sensor.
  4. Positive Terminal: Connect the red cable to the positive terminal.
  5. FlexiTap Connection: Insert the FlexiTap into the center of the cable to ensure a good connection. Ensure it is centered and the pin is not bent.
  6. Secure FlexiTap: Secure the FlexiTap with a cable tie.
  7. Negative Terminal (12V/24V): Connect the yellow cable to the negative terminal for 12 V or 24 V systems. Note: For 24 V, connect only for 80 V batteries.
  8. Negative Terminal (Final): Connect the black cable to the negative terminal. The black cable must be connected last.

LED Status Checks:

Phase 1 LED Check: Upon power connection, observe the following LED sequence: 1 Green > 1 Red > 1 Yellow and 1 Blue. This blinking pattern repeats twice before the next phase.

Phase 2 Voltage Check: Check the number of blinks for voltage:

  • x1 = 12V
  • x2 = 24V
  • x3 = 36V
  • x4 = 48V
  • x8 = 80V

Phase 3 LED Sequence on Startup: The LED blinks once to show the current battery status.

Visual LED Indication

Automatic Voltage Detection: The iQ Mini™ battery monitoring device automatically detects battery voltage. This is indicated by a blinking green LED immediately after initial startup. The detected voltage can be found in the table below. IMPORTANT: For the iQ Mini™ battery monitoring device to detect the correct voltage, the per-cell voltage must be between 2.0 and 2.25 V during installation.

Number of BlinksSensed CellsNominal Voltage (V)
1612
21224
31836
42448
84080

72 V must be ordered separately.

LED Indications

Models 300Q, 300B8, and 301Q (Figure 7):

Models 310Q and 310S (Figure 8):

Low Voltage Alarm Indications (Figure 9):

Connectivity

iQ Gateway™ Data Transmitter

The iQ GATEway™ battery data transmitter automatically acquires data from any iQ Mini™ battery monitoring device within range and transmits the data directly to an online portal. This data is available in real-time and displays the status of connected devices.

Gateway Dimensions:

The iQ GATEway™ has dimensions of approximately 201 mm (7.91") length x 171 mm (6.73") width x 158 mm (6.22") depth. Mounting dimensions are also provided.

Gateway Installation:

  1. Mounting: Mount the control box to the wall using four screws/anchors and a level. Ensure it is securely attached.
  2. Antenna Connection: Connect the antennas to the iQ GATEway™ battery data transmitter.
  3. Antenna Placement: Position both antennas as high as possible to maximize signal. Note: Maintain a minimum distance of 1 m between antennas.
  4. Power On: Connect the device to power.

LED Sequence on Startup:

If the red LED is on, refer to the FAQ.

Frequently Asked Questions (FAQ)

iQ Mini™ Battery Monitoring Device

iQ GATEway™ Battery Data Transmitter

Spare Parts

iQ Mini™ Battery Monitoring Device

Part NumberDescription
IQ-300iQ Mini™ TPPL battery monitoring device without external temperature sensor
IQ-310iQ Mini™ flooded battery monitoring device without external temperature sensor
IQ-301iQ Mini™ TPPL battery monitoring device with external temperature sensor

FlexiTap Connector Kits

Part NumberDescription
IQ-RFQFlexiTap Connector
IQ-RFQQ Connector - FlexiTap

Bolt Connector Kits

Part NumberDescription
IQ-RFB8M8 Bolt Connector

M4 Screw Connector Kits

Part NumberDescription
IQ-RFSM4 Screw Connector

iQ GATEway™ Battery Data Transmitter

Part NumberDescription
IQ-GATE-CW10Global 4G mobile gateway with Wi-Fi support

Notes

Placeholder for notes.

PDF preview unavailable. Download the PDF instead.

glob-sk-om-iqm-0924 Adobe PDF Library 17.0

Related Documents

Preview EnerSys Wi-iQ Battery Monitoring Device
Learn about the EnerSys Wi-iQ battery monitoring device, designed to optimize battery fleet operations, reduce downtime, and cut total cost of ownership. This device captures key battery data and communicates wirelessly for advanced battery management.
Preview HAWKER Water Less Batteries: Advanced Industrial Energy Solutions by EnerSys
Explore HAWKER Water Less batteries from EnerSys, designed for industrial applications. Features include extended watering intervals, low maintenance, high reliability, and advanced monitoring options like Wi-iQ and EnSite for optimized performance and TCO.
Preview EnerSys NexSys CORE ATEX Batteries Instruction Manual for Hazardous Areas
Instruction manual for EnerSys NexSys CORE ATEX batteries, detailing safety, operation, maintenance, commissioning, and conformity for use in hazardous industrial environments (ATEX certified). Learn about VRLA and TPPL technology for Zone 1, 2, 21, 22 applications.
Preview EnerSys Wi-iQ®4 Battery Monitoring Device User Manual
Comprehensive user manual for the EnerSys Wi-iQ®4 battery monitoring device, covering features, specifications, installation, communication, configuration, and troubleshooting.
Preview EnerSys Perfect Plus™ PzS/PzB Traction Battery Commissioning Instructions and Report
Comprehensive guide for EnerSys Perfect Plus™ PzS and PzB dry pre-charged traction batteries, detailing safety precautions, electrolyte filling, commissioning charge procedures, and reporting requirements for optimal performance and longevity.
Preview EnerSys IRONCLAD Flooded Lead-Acid Batteries Owner's Manual
Comprehensive owner's manual for EnerSys IRONCLAD Flooded Lead-Acid Batteries, covering safe handling, operation, maintenance, troubleshooting, and specifications for industrial applications.
Preview EnerSys Service & Support: Operations, Battery Recycling, and Pre-Owned Solutions
Discover EnerSys's comprehensive service and support solutions, including 24/7 technician coverage, cloud-based reporting, battery recycling programs for lead-acid and lithium-ion, and PROSeries pre-owned batteries and chargers.
Preview EnerSys NexSys TPPL Batteries: Advanced Lead-Acid Battery Technology
Discover the benefits of EnerSys NexSys TPPL batteries, featuring advanced Thin Plate Pure Lead technology for maintenance-free, fast-charging, and sustainable power solutions in industrial applications. Ideal for forklifts and material handling equipment.